Transport Infrastructure Ireland (TII)DublinTED
MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
The M120 Heavy Civils Enabling Works Framework Agreement (the M120 Framework) will provide civil engineering works for the MetroLink programme. The scope of works for the M120 Framework will comprise a combination of the following: Site set up and hoarding installation; Logistics and welfare management; Utilities diversions and works; Sit...
Erdarbeiten, Ingenieurbauwerke, Betonarbeiten, Elektroinstallation, Spezialtiefbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Transport Infrastructure Ireland (TII)
- Veröffentlicht:
- 20. Juli 2026
- Frist:
- 24. Juli 2026
- Thema:
- Erdarbeiten
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The M120 Heavy Civils Enabling Works Framework Agreement (the M120 Framework) will provide civil engineering works for the MetroLink programme. The scope of works for the M120 Framework will comprise a combination of the following: Site set up and hoarding installation; Logistics and welfare management; Utilities diversions and works; Site clearance and removal of materials; Surveys and/or ground investigations; Bulk earth and rock excavation works; Construction and outfitting works; Building construction and fit-out; Construction of single or multi-span viaducts, overbridges, under bridges and walkways over or under live carriageways and waterways, retaining walls and guide walls, diaphragm walls, secant piling and contiguous piling, rock bolts, anchors, capping beams, shotcrete works, mesh works, sealing of fissures etc., underground and above ground reinforced concrete structures and associated temporary works/propping/other reinforcement works; Monitoring of settlement and ground movement and associated remedial works; De-watering and water treatment/disposal management; Site waste management; Mechanical , electrical and plumbing works as required, perform the roles of PSDP and PSCS; Structural, civil, and engineering design; Any other related works. The procurement of the M120 Framework (the Competition) will be conducted under the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (as amended) (SI 286/2016), and will be managed by TII, acting as the contracting authority, who will be the sole point of contact for applicants. The M120 Framework will be a multi-party Framework Agreement (per Regulation 50 of the Utilities Regulations) consisting of two (2) value based lots. The competition will be structured as a two-stage process with Stage 1 the Selection Stage and Stage 2 the Tender Stage. A maximum of three (3) tenderers will be appointed to each lot. Applicants may apply for one (1) lot only. A tenderer appointed to either lot under the M120 Framework is not precluded from participating in other MetroLink projects or contract packages. The lots are as follows: Lot 1 - Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources. Lot 1 will tunnel portals, single or multi span viaducts, and other contract packages. Lot 2 - Heavy Civils Enabling Works for Call-off contracts with an estimated value less than €50 million (excluding VAT) except those to be included in Lot 1. Lot 2 will consist of call-off contracts for elements of civils works, which may include retaining walls, other foundation/support works. Conduct of the Competition Stage 1: The Selection Stage will commence with the publication of a Pre-Qualification Questionnaire (PQQ) by TII. This will assess applicants based on defined selection criteria for each lot, such as their financial and economic standing, technical capability, and relevant experience. Provided that there is a sufficient number of applicants for each lot, five (5) applicants for each of the two (2) lots will be shortlisted. If less than five (5) applicants meet the minimum requirements for a lot, TII reserves the right to proceed with those applicants to the second stage of the procurement for that lot. The PQQ process to establish both lots will run concurrently. Stage 2: The Tender Stage for the award of the framework and first call-off contracts will commence with TII issuing the Invitation to Negotiate (ITN) to each tenderer for that lot. Following the submission and evaluation of ITN tenders, TII reserves the right to engage in further negotiations with tenderers. Following the negotiation phase, TII may request the submission of Best and Final Offers (BAFOs). The three (3) highest ranked tenderers under each lot will be appointed to the M120 Framework and will be eligible to compete for future call-off contracts. The 4th and 5th ranked tenderers under each lot will be reserve tenderers. If during the term of the M120 Framework a framework contractor no longer meets the financial and economic standing requirements in the PQQ or does not submit a tender in response to a call-off tender for three or more call-off contracts in a row then TII reserves the right to terminate the framework agreement with that contractor and appoint one of the reserve tenderers to the M120 Framework. Furthermore, the highest ranked tenderer under each lot will be awarded the first call-off contracts under each lot: Lot 1 award of the contract for the Dublin Airport station box (see 5.1 Lot: LOT0001); Lot 2 award of the contract for excavation and pile removal works near to Tara Street station (see 5.1 LOT 0002). Future call off contracts will be awarded by way of mini-competition following the issue of the call-off tender document to the framework members. Detailed information regarding the award criteria for the future / subsequent call-off contracts after the first call-off contracts will be communicated to tenderers appointed to each lot of the M120 Framework as they arise based on TII’s requirements. The M120 Framework may also be used by Iarnród Eireann - Irish Rail to procure call-off contracts for heavy civil engineering works at or adjacent to Glasnevin station (including, without limitation, retaining wall construction, ground stabilisation, utility diversions, interface works with the MetroLink alignment, and preparatory or enabling works necessary to facilitate the integration of MetroLink with the existing Irish Rail network at that location), provided that the works in question fall within one or more of the categories of work set out in the scope of works for the M120 Framework. Refer to the PQQ documents for further information.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten2 Angaben erfasstLose LOT-0001 · Lose LOT-0002
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
Iarnród Eireann-Irish RailDublinFrist: 25. Aug.This is a call to competition by IE for the procurement of a Contractor for the Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. As part of the Glasnevin MetroLink Enabling Works Programme, a specialist Civils and Structures contractor is being procured to undertake both the detailed design and construction of key enabling works. The appointed contractor will play a key role in delivering the enabling works package, which will be undertaken in advance of, or in parallel with, the main MetroLink M100, M401 and M500 contracts and are critical to reducing programme risk, minimising disruption to existing rail services, and protecting the DART+ Programme.9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
Iarnród Eireann-Irish RailDublinFrist: 04. Aug.This is a call to competition by IE for the procurement of a Contractor for the Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. As part of the Glasnevin MetroLink Enabling Works Programme, a specialist Civils and Structures contractor is being procured to undertake both the detailed design and construction of key enabling works. The appointed contractor will play a key role in delivering the enabling works package, which will be undertaken in advance of, or in parallel with, the main MetroLink M100, M401 and M500 contracts and are critical to reducing programme risk, minimising disruption to existing rail services, and protecting the DART+ Programme.Framework agreement for asphalt works, operation and maintenance.
Bodø KommuneBODØFrist: 31. JuliThe aim of the procurement is to enter into a framework agreement with one tenderer for the delivery and laying of asphalt on municipal roads and areas in Bodø municipality. The contract shall ensure the delivery of asphalt work as a comprehensive service, including all necessary work, including preparatory works, asphalting, compaction and clearing up after work has been carried out. The framework agreement will be valid for 2 years, with an option to extend the framework agreement for a further 1+1 year, to a total maximum of four years. The estimated value of the framework agreement is between NOK 28 million and NOK 29 million excluding VAT per annum. This is equivalent to between NOK 112 million and NOK 116 million excluding VAT for the entire contract period of maximum four years (including options). The maximum financial limit for the framework agreement (including options) is NOK 150 million excluding VAT. See the requirement specifications, point 2.2 part 2 and annex 1 for further information on the contract's extent and content.CFT to establish a Multi-supplier Frameworks Agreement for the Delivery of Work and Organisational Behaviour/Leadership Programme or equivalent divided into 3 Lots
BioPharmaChem SkillnetCorkFrist: 29. Juli1.2.1 In summary, the Service comprise the establishment of a Multi-supplier Frameworks Agreement for the Delivery of Work and Organisational Behaviour/Leadership Programme or equivalent Divided into three lots that are outlined in the specification set out at Appendix 1 of this CFT. The Framework Agreement will be divided into three (3) Lots as follows: • Lot 1 - Higher Diploma (level 8), work and organisational leadership • Lot 2 – Certificate (level 8) work and organisational leadership • Lot 3 – Certificate in (level 7) work and organisational Behaviour Tenderers may submit a tender for one, two, or all three Lots. Each Lot will be evaluated independently, and one or more Framework Members may be appointed to each Lot.2025/4542 Framework agreement with one tenderer for ventilation work for properties in Tromsø.
STATSBYGGOSLOStatsbyggs requests tenders for a framework agreement for ventilation works at properties in Tromsø. The framework agreement shall apply for the always owned and leased properties in Tromsø and the surrounding area. The need may change during the contract period. Properties can, therefore, forfeit the contract, and properties within Tromsø and the surrounding area can be added to the. Special rules and executing personnel must be approved by the tenant for work in the prison and the police centre. A police certificate is required for work in prisons and police houses. Security clearance is subject to being required.BKK - Framework agreement for excavation & trench work north of Sognefjorden.
BKK ASBergenFrist: 14. Aug.The procurement is for a framework agreement for trench and excavation work north of sognefjorden. The framework agreement is divided into three geographical zones and tenders can be submitted for one or several of these.Dublin City Council Multi-Party Framework Agreement for a Works Contractor for the construction of Nature Based Solutions for Dublin City Council Protection of Water Bodies Office
Dublin City CouncilDublinThe scope of this framework will include, but is not limited to, the construction of Nature based Solutions/Green Infrastructure in both parkland and residential/urban streetscapes and to act as PSCS. Projects with a value less than (or equal to) €50,000 will utilise a cascade method for call off contracts, whereas projects with a value greater that €50,000 which will utilise mini competitions for contract award. The establishment of this framework agreement is subject to the provisions of Directive 2014/24/EU and is being awarded using the Competitive Procedure with Negotiation. The Contracting Authority reserves the right to enter into negotiations with some or all applicants who submit a valid responsive tender. Negotiations may be held on all aspects of the service. However, they are under no obligation to do so and reserve to award the contract directly following receipt of initial tenders without recourse to negotiations with individual tenderers. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID xxxxxxx – Input when notice created .Multi-Party Framework Agreement for HSE DTS Framework 2024 – FW02: Acute Healthcare Capital Works – project value €1M - €15M excl. VAT for RHA B Dublin and Midlands, IHA1 and IHA 2
Health Service Executive (HSE)KildareMULTI-PARTY FRAMEWORK AGREEMENT FOR HSE DESIGN TEAM SERVICES FRAMEWORK 2024 – FRAMEWORK 02: ACUTE HEALTHCARE CAPITAL WORKS – PROJECT VALUE €1M - €15M EXCL. VAT. This framework will include the following design team disciplines (Lots): Lot 1: Architect (AR) as Principal Service Provider with the following Specialists domestic subconsultants, or in-house specialisms: a. Planner (PL), b. Project Supervisor Design Process (PSDP), c. Fire Safety Consultant (FSC) and d. BIM Information Manager (BIM). Lot 2: Quantity Surveyor (QS), as Principal Service Provider. Lot 3: Building Services Engineer (M+E), as Principal Service Provider. Lot 4: Civil / Structural Engineer (C+S), as Principal Service Provider. Lot 5: Employer’s Representative (ER),as Principal Service Provider. Lot 6: Energy Efficient Design Facilitator (EEDF), as Principal Service Provider. Lot 7: Assigned Certifier (AC), as Principal Service Provider. The Health Services Executive (HSE) invites expressions of interest, under the Restricted Procedure, from suitably qualified services providers for the provision of design team services (including Specialist Skills Providers) per the above Lot listing for which it is proposed to establish a Multi-Party Framework Agreement for each Lot type to award call-off contracts for Acute Healthcare Capital Works – project value €1M - €15M excl. VAT within RHA B Dublin and Midlands, IHA1 and IHA 2 for HSE Capital and Estates Office, Bridge House, Cherry Orchard Hospital. Please note that the INITIAL project forming Framework 02 for this regional / subregional office will be: Reconfiguration of the Emergency Department (ED) at St. James’s Hospital. Please see SAQ document pack for detailsFramework agreement for mechanical maintenance and pipe work.
VEAS SELVKOST ASSlemmestadFrist: 11. Sept.Veas has a continual need for mechanical services, industrial plumbing and other relevant maintenance work connected to the operation and upgrading of equipment and treatment plant at Veas. Veas would like to use a new final dewatering facility at the start of 2027, and the extent of the mechanical services connected to the start-up and operation of this part of the treatment plant is uncertain. The contracting authority needs parallel framework agreements with up to 3 tenderers within mechanical maintenance and pipe work. The framework agreement period is 4 years and the estimated value is NOK 60 million. The contracting authority requires a prioritised customer and that, if needed, work booked can be started within 24 hours on weekdays.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 24. Juli 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Transport Infrastructure Ireland (TII).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.