Framework agreement for mechanical maintenance and pipe work.
Veas has a continual need for mechanical services, industrial plumbing and other relevant maintenance work connected to the operation and upgrading of equipment and treatment plant at Veas. Veas would like to use a new final dewatering facility at the start of 2027, and the extent of the mechanical services connected to the start-up and o...
Gebäudewartung, Installationsservice
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- VEAS SELVKOST AS
- Veröffentlicht:
- 21. Juni 2026
- Frist:
- 11. September 2026
- Thema:
- Gebäudewartung
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
Veas has a continual need for mechanical services, industrial plumbing and other relevant maintenance work connected to the operation and upgrading of equipment and treatment plant at Veas. Veas would like to use a new final dewatering facility at the start of 2027, and the extent of the mechanical services connected to the start-up and operation of this part of the treatment plant is uncertain. The contracting authority needs parallel framework agreements with up to 3 tenderers within mechanical maintenance and pipe work. The framework agreement period is 4 years and the estimated value is NOK 60 million. The contracting authority requires a prioritised customer and that, if needed, work booked can be started within 24 hours on weekdays.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten6 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten4 Angaben erfasstBekanntmachungsnummer · Verfahrensart · Auftragsart · Regelungsebene
Ausführungsorte
Freischalten4 Angaben erfasstAusführungsorte
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Framework agreement for asphalt works, operation and maintenance.
Bodø KommuneBODØFrist: 31. JuliThe aim of the procurement is to enter into a framework agreement with one tenderer for the delivery and laying of asphalt on municipal roads and areas in Bodø municipality. The contract shall ensure the delivery of asphalt work as a comprehensive service, including all necessary work, including preparatory works, asphalting, compaction and clearing up after work has been carried out. The framework agreement will be valid for 2 years, with an option to extend the framework agreement for a further 1+1 year, to a total maximum of four years. The estimated value of the framework agreement is between NOK 28 million and NOK 29 million excluding VAT per annum. This is equivalent to between NOK 112 million and NOK 116 million excluding VAT for the entire contract period of maximum four years (including options). The maximum financial limit for the framework agreement (including options) is NOK 150 million excluding VAT. See the requirement specifications, point 2.2 part 2 and annex 1 for further information on the contract's extent and content.Framework agreement operation and maintenance - electrical installations industry
Sarpsborg kommuneSarpsborgElectrical installation work within (the list is not exhaustive): - Heating centres -Ventilation - Automation in buildings, - Assembly work, troubleshooting and repairs within the above mentioned types of installations. - Assembly work, troubleshooting and repairs in pump stations, pressure stations, water treatment plants and sewage treatment plants. - Assembly work, troubleshooting and repairs within EX installations.Framework agreement for the purchase of industrial doors and doors.
VEAS SELVKOST ASSlemmestadIndustry gates are critical infrastructure in Veas treatment plant. The objective of the procurement is to ensure operation, ensure safety, fire requirements and technical requirements, as well as protect and control the arrival of the system. The procurement shall cover our need for service and maintenance of the existing industry doors and new procurements. Veas would therefore like to enter into a framework agreement with one tenderer for the purchase of industry gates, including a service and maintenance agreement.Framework for Responsive Repairs, Voids and Compliance Works For Tuath Housing
Tuath Housing Association LtdDublinFrist: 14. Aug.Tuath Housing is seeking to procure a national multi-contractor Framework for the delivery of responsive repairs, void property works, replacement heat, smoke and CO detectors, and Electrical Installation Condition Reports (EICRs) across its housing portfolio within the Republic of Ireland.Framework agreement for joinery works - second publication
Sola kommuneSolaFrist: 22. JuniThe framework agreement mainly includes repairs and replacements on the Contracting Authority's buildings and sites, as well as planning and minor engineering design work connected to the assignments.Framework agreement for inspections and maintenance of gas alarms.
NTNUTrondheimNTNU shall enter into a framework agreement for the inspection and maintenance of a gas alarm system for NTNU ́s buildings in Trondheim. The delivery and place of work for the deliveries will be NTNU in Trondheim. See Annex 1c Site Overview for a more detailed description of the different installations, including location and type. The framework agreement includes the following works: Annual inspections The annual inspection includes two meetings, in one turn, a check of the gas warning system + one calibration is carried out in the second turn-out, only one calibration will be carried out. Maintenance Maintenance means repairs, replacements and improvements of deviations (errors and shortcomings) on the installations in order for them to function as intended. See the requirement specifications for a comprehensive description of the delivery. The planned start-up for the new contract is in the medio August, so that the autumn inspections shall be carried out under this agreement.Framework agreement operation and maintenance - electrical installations, construction.
Sarpsborg kommuneSarpsborgSarpsborg municipality mainly needs the following electrical installation services (NB! The list is not exhaustive): - Renovation and renovation work. - Ongoing operations and maintenance work. - Planned maintenance - Acute need (critical situations) - Assembly work, troubleshooting and repairs within the above mentioned types of installations. Concerns additions, alterations and adaptations of premises/buildings owned or run by Sarpsborg municipality.Framework agreement for winter maintenance
OFA IKSGJERSTADGjerstad municipality shall enter into framework agreements for winter maintenance on municipal roads. The framework agreement is for the hire of tractors and possibly other machines with drivers for snow clearing and clearing municipal roads/open spaces. Winter operations mainly comprise routine operational assignments, stand-by assignments and reports to the contracting authority. The term operational assignments includes snow clearing and gritting of roads, car parks and foot paths/pavements etc. It is the tenderer ́s responsibility to ensure that winter maintenance is carried out in accordance with the current service level (self-call-out) in accordance with the current requirements. The contracting authority has the right to call out the tenderer to perform services under the contract when he sees a need for this or finds this appropriate. For further information on the contents of the procurement, please refer to part 2 Annex 1 with sub-annex. The procurement is divided into two lots. This sub-contract is for lot 1 - Fiane, Brokelandsheia and Gjerstad.Framework agreement for the purchase of exercising equipment, operation and maintenance.
StortingetOSLOFrist: 21. Aug.The objective of the procurement is to ensure a training facility that fulfils the requirements for HSE, functionality and capacity, and that is adapted to actual use and needs among The Norwegian Parliament's representatives and employees in the administration. The contract is for the procurement of exercising apparatuses and equipment for exercising rooms, in addition to the control, operation and maintenance of new and existing apparatuses. A framework agreement shall be signed with one tenderer. See the tender documentation documents for further information on the contract ́s extent.Framework agreement for furniture and fixtures
Departementenes sikkerhets- og serviceorganisasjonOsloFrist: 24. Aug.The objective of the framework agreements is to facilitate conditions for cost efficient procurements of good design and high quality furniture, which at the same time are environmentally friendly and contribute to a circular economy for all ministries. It is necessary to procure office furniture such as panel furniture, office chairs, environment furniture and interior, including textiles and interior such as curtains, carpets, sound absorbers etc. and for facilitating functioning office work stations for all employees as well as supplementing the new government quarter. In addition furniture and interior shall also be procured for the Government's representation facility (including the Prime Minister ́s residence), commuter residences and foreign stations thereof. The list is not exhaustive. The procurement shall also include additional services such as interior architect services, repairs and maintenance, upgrading and drawing of existing furniture, as well as further mediation of existing furniture holding for reuse and securing optimum material recovery. The tenderer is required to offer the purchase of new furniture as well as leasing so that flexibility is taken care of when changing or moving to new areas/premises. The need will change in line with organisational changes. In addition it is important to be able to supplement or adapt furniture for changed needs at work. The estimated value of the procurement is from NOK 52,000,000 - 104,000,000 excluding VAT. The estimated value is not binding for the contracting authority. The contract will be valid for two (2) years, with an option to extend the contract for a further one (1) + one (1) year, to a total maximum of four (4) years.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 11. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist VEAS SELVKOST AS.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.