Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. - Einkauf B12 - Vergabestelle BauMünchenTED
Grid-Forming Power Station for Battery Energy Storage System - PR1175273-3530-W
2 Stück. Grid-Forming Battery Energy Storage System
Energy Storage
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. - Einkauf B12 - Vergabestelle Bau
- Published:
- July 30, 2026
- Deadline:
- August 31, 2026
- Topic:
- Energy Storage
Tender description
2 Stück. Grid-Forming Battery Energy Storage System
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock4 details capturedPerformance locations
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Photovoltaic and Battery Energy Storage System
daa plcDublinDeadline: Aug 24Provision of a Photovoltaic and Battery Energy Storage System at Dublin airport. As part of daa’s strategic commitment to enhancing energy resilience and advancing sustainability at Dublin Airport, this project seeks to deliver a large-scale Solar Photovoltaic (PV) installation integrated with a Battery Energy Storage System (BESS). This project will help support daa’s long-term vision of decarbonising airport operations and securing a reliable, self-sufficient energy supply. daa intent to establish a single supplier agreement for the provision of these works.SUPPLY, INSTALLATION SUPPORT AND COMMISSIONING OF A BATTERY ENERGY STORAGE SYSTEM (BESS), POWER CONVERSION SYSTEM (PCS) AND AN ENERG Y MANAGEMENT SYSTEM (EMS) IN THE INDUSTRIAL SECTOR IN SRI LANKA
UNIDOPhilippinesDeadline: Aug 28Tendering Text: SUPPLY, INSTALLATION SUPPORT AND COMMISSIONING OF A BATTERY ENERGY STORAGE SYSTEM (BESS), POWER CONVERSION SYSTEM (PCS) AND AN ENERGY MANAGEMENT SYSTEM (EMS) IN THE INDUSTRIAL SECTOR IN SRI LANKASupply, Installation, Testing and Commissioning of Ground Mounted Solar PV and Battery Energy Storage System Garranty, Inishturk Island, Co. Mayo
Augustine O'TooleInishturkDeadline: Sep 17The Contracting Authority invites suitably qualified and experienced contractors to tender for the supply, delivery, installation, testing, commissioning and handover of a ground mounted solar photovoltaic (PV) system with battery energy storage system (BESS) at Garranty, Inishturk Island, Co. Mayo. The works shall include all labour, materials, equipment, transportation, plant, ancillary components, testing, certification, commissioning and training necessary for the complete operational installation.Asbestos Roof Removal, Roof Replacement, Solar PV, Battery Storage and Smart Energy Control System at Athy Rugby Club
Athy Rugby Football ClubAthyDeadline: Sep 16Athy Rugby Club wishes to appoint a suitably qualified Design and Build Contractor for the removal and lawful disposal of asbestos roof materials, replacement of the clubhouse roof with a new insulated composite roof system, and the design, supply, installation, commissioning and support of a Solar PV Array, Battery Energy Storage System (BESS) and Smart Energy Control System. The works include the removal and disposal of approximately 830 m2 of asbestos-containing roof coverings and associated asbestos gutters and downpipes. A new insulated roof system with a minimum 50-year design life and new gutters and downpipes shall be installed. Tenderers shall attend a mandatory pre-tender site inspection and measurement survey. All dimensions and quantities are indicative only and tenderers shall rely on their own measurements. No adjustment to the Contract Sum will be permitted for quantity or measurement differences that could reasonably have been identified before tender submission. The successful contractor shall be responsible for all asbestos-related compliance, removal, transportation, disposal documentation and certification. The Smart Energy Control System shall optimise energy generation, storage and consumption, integrate with the existing generator, manage battery charging and discharge, support floodlighting loads and include a secure web-based monitoring platform and smart phone application. The project is part-funded through the LEADER Programme.Firm to develop Investment Guideline for battery energy storage systems
UNDPJordanDeadline: Sep 09UNDP in Viet Nam is looking for a firm/organization to develop Investment Guideline for battery energy storage systems for commercial and industrial facilities in Viet Nam. Duty Station: Ha Noi, Viet Nam Assignment duration: September 2026 - February 2027 Objective: The objective of this assignment is to develop a comprehensive, bilingual (English/Vietnamese) Guideline that present a clear, evidence-based investment procedures for behind-the-meter BESS in commercial and industrial applications in Viet Nam, validated against actual implementation practice, and to share the findings with stakeholders. Please indicate whether you intend to submit a bid by creating a draft response without submitting directly in the system. This will enable the system to send notifications in case of amendments of the tender requirements. Should you require further clarifications, kindly communicate using the messaging functionality in the system. Offers must be submitted directly in the system following this link: http://supplier.quantum.partneragencies.org using the profile you may have in the portal. In case you have never registered before, you can register a profile using the registration link shared via the procurement notice and following the instructions in guides available in UNDP website: https://www.undp.org/procurement/business/resources-for-bidders. Do not create a new profile if you already have one. Use the forgotten password feature in case you do not remember the password or the username from previous registration. Search for the specific tender using search filters and subscribe to the tender in order to get notifications in case of amendments of the tender document. If you need support with the online system, you can contact the contact details of this tender as indicated in the solicitation document. UNDP Viet Nam - Procurement UnitRegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption
Trianel Flexibilitätsprojekte GmbH & Co. KGAachenPreliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver a power of 7.5 to a maximum of 10 MW and have a capacity of 2 to a maximum of 3 hours. The BESS should preferably be based on lithium-ion or sodium-ion battery technology and designed for commercial operation in the German electricity market. The possible lithium-ion technologies will be specified in more detail during the tender. The system is expected to support, among others, participation in Frequency Containment Reserve, Automatic Frequency Restoration Reserve, Day-Ahead and Intraday markets. The project site has already been secured and is currently used as agricultural land. The existing substation is located on the adjacent property, with an estimated cable route of less than 100 m. The site is located within Water Protection Zone III, which requires appropriate consideration of water protection, containment, drainage and environmental requirements. Planning permission for this project has not yet been granted. The project is intended to be tendered as a turnkey EPC project, including engineering, procurement, construction, installation, grid connection interface, testing, commissioning and handover of a fully operational BESS. The tender may also cover related maintenance services, which are subject to a Long-Term Service Agreement (LTSA). The contracting authorities reserve the right to set the term of this LTSA for up to 15 years. The companies have no legal right to conclude an LTSA with a specific term. The final technical requirements, interface definitions, contractual conditions and detailed scope of work will be specified during the subsequent RFP phase. Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition.Battery pack with operational services and market optimisation.
Returkraft ASKRISTIANSAND SDeadline: Sep 01Returkraft would like to enter into a contract with a tenderer for engineering design services, delivery, installation, testing, commissioning and documentation of a complete battery based energy storage system on Returkraft ́s facility. The assignment is further described in point 2 of Appendix A - Requirement Specifications. The agreement shall have a duration of one (1) year, with an option for additional three (1+1+1) years, if Returkraft so wishes. Welcome to the competition!Framework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
Trianel Energieprojekte GmbH & Co. KGAachenDeadline: Sep 14TEP is looking for up to six framework agreement partners as suitable suppliers for the supply of the core components consisting in particular of battery storage, battery inverter, transformer station and battery management system (BMS) and power plant controller. The supplier is also responsible for the commissioning of the components it supplies. In addition, a long-term service contract is to be awarded, which includes warranty extensions and is intended to ensure the performance of the system. After successful participation in the participant competition, selected companies will be invited to submit bids on the basis of a project profile including performance requirements and a term sheet. During the bidding phase (following the conclusion of the prequalification process), bidders are required to provide cost estimates for two specific projects. TEP intends to award these specific projects directly to the best bidder(s) upon awarding the framework agreement. However, TEP also reserves the right not to award the projects to be costed, but rather to use them solely as a basis for selection when awarding up to six framework agreements, based on the award criteria. Consequently, there is no entitlement to be awarded a contract. Project No. 1 is located in Mecklenburg-Western Pomerania with a volume of 100 MW / 400 MWh. Project No. 2 is located in North Rhine-Westphalia with a volume of 20 MW / 40 MWh. TEP reserves the right to transfer call-offs or individual orders placed under the framework agreements to affiliated legal entities. This means that TEP will not necessarily be the contracting party for the individual orders placed under the framework agreements. This applies to subsidiaries of Trianel GmbH, of Trianel Flexibilitätsprojekte GmbH & Co. KG or Trianel Energieprojekte GmbH & Co. KG that are yet to be established, as well as the following companies affiliated with TEP: - TEP Amphitrite GmbH & Co. KG - TEP Arkas GmbH & Co. KG - TEP AT GmbH - TEP Bellona GmbH & Co. KG - TEP Epsilon GmbH & Co. KG - TEP Eunomia GmbH & Co. KG - TEP Fortuna GmbH & Co. KG - TEP Irene GmbH & Co. KG - TEP Kalliope GmbH & Co. KG - TEP Lutetia GmbH & Co. KG - TEP Massalia GmbH & Co. KG - TEP Netze GmbH & Co. KG - TEP Thalia GmbH & Co. KG - TEP Themis GmbH & Co. KG - TEP Vesta GmbH & Co. KG - TEP Victoria GmbH & Co. KG - Infrastruktur Kamerland GmbH & Co. KG - TAP Windprojekte GmbH & Co. KG Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition. The actual demand-or the scale of the framework agreements to be awarded-is difficult to forecast, particularly due to the unpredictability of the required battery storage capacity. Based on the estimated demand volumes, the total volume under the framework agreement is estimated to be approximately 8 GWh over the contract term of up to eight years. The maximum volume applicable under the framework agreement is 10 GWh.SPD1/2026/026 - Tender for the Supply, Delivery, Installation, Commissioning and Training of an Unmanned Surface Vessel (USV) with High-Definition Integrated Bathymetric Survey System and Energy-Efficient Ground Control Station for the University of Malta (Maestri Project) - CUP NO G13C25000300006
Department of ContractsFlorianaDeadline: Sep 09SPD1/2026/026 - Tender for the Supply, Delivery, Installation, Commissioning and Training of an Unmanned Surface Vessel (USV) with High-Definition Integrated Bathymetric Survey System and Energy-Efficient Ground Control Station for the University of Malta (Maestri Project) - CUP NO G13C25000300006Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Oct 01The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEXclassified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: An MV/LV transformer A thermal management system (dry cooler) A lowpressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for selfconsumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's cogenerators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from the cogenera
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 31. August 2026.
- Who is the contracting authority?
- The contracting authority is Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. - Einkauf B12 - Vergabestelle Bau.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.