daa plcDublinTED
Photovoltaic and Battery Energy Storage System
Provision of a Photovoltaic and Battery Energy Storage System at Dublin airport. As part of daa’s strategic commitment to enhancing energy resilience and advancing sustainability at Dublin Airport, this project seeks to deliver a large-scale Solar Photovoltaic (PV) installation integrated with a Battery Energy Storage System (BESS). This ...
Solar Installation, Photovoltaics, Energy Storage
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- daa plc
- Published:
- July 22, 2026
- Deadline:
- August 24, 2026
- Topic:
- Solar Installation
- Object:
- Photovoltaikanlage (PV)
Object classification
- Photovoltaikanlage (PV)Primary
Tender description
Provision of a Photovoltaic and Battery Energy Storage System at Dublin airport. As part of daa’s strategic commitment to enhancing energy resilience and advancing sustainability at Dublin Airport, this project seeks to deliver a large-scale Solar Photovoltaic (PV) installation integrated with a Battery Energy Storage System (BESS). This project will help support daa’s long-term vision of decarbonising airport operations and securing a reliable, self-sufficient energy supply. daa intent to establish a single supplier agreement for the provision of these works.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
6Grid-Forming Power Station for Battery Energy Storage System - PR1175273-3530-W
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. - Einkauf B12 - Vergabestelle BauMünchenDeadline: Aug 312 Stück. Grid-Forming Battery Energy Storage SystemThermal energy storage pressure vessels
N.V. Nederlandse GasunieGroningenN.V. Nederlandse Gasunie (hereinafter: Gasunie) is organizing a European tender based on a negotiated procedure with prior call for competition to award an agreement for the engineering and delivery of two thermal energy storage pressure vessels (further defined as TES). The engineering and delivery of two thermal energy storage pressure vessels.Battery pack with operational services and market optimisation.
Returkraft ASKRISTIANSAND SDeadline: Sep 01Returkraft would like to enter into a contract with a tenderer for engineering design services, delivery, installation, testing, commissioning and documentation of a complete battery based energy storage system on Returkraft ́s facility. The assignment is further described in point 2 of Appendix A - Requirement Specifications. The agreement shall have a duration of one (1) year, with an option for additional three (1+1+1) years, if Returkraft so wishes. Welcome to the competition!RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption
Trianel Flexibilitätsprojekte GmbH & Co. KGAachenPreliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver a power of 7.5 to a maximum of 10 MW and have a capacity of 2 to a maximum of 3 hours. The BESS should preferably be based on lithium-ion or sodium-ion battery technology and designed for commercial operation in the German electricity market. The possible lithium-ion technologies will be specified in more detail during the tender. The system is expected to support, among others, participation in Frequency Containment Reserve, Automatic Frequency Restoration Reserve, Day-Ahead and Intraday markets. The project site has already been secured and is currently used as agricultural land. The existing substation is located on the adjacent property, with an estimated cable route of less than 100 m. The site is located within Water Protection Zone III, which requires appropriate consideration of water protection, containment, drainage and environmental requirements. Planning permission for this project has not yet been granted. The project is intended to be tendered as a turnkey EPC project, including engineering, procurement, construction, installation, grid connection interface, testing, commissioning and handover of a fully operational BESS. The tender may also cover related maintenance services, which are subject to a Long-Term Service Agreement (LTSA). The contracting authorities reserve the right to set the term of this LTSA for up to 15 years. The companies have no legal right to conclude an LTSA with a specific term. The final technical requirements, interface definitions, contractual conditions and detailed scope of work will be specified during the subsequent RFP phase. Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition.EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg
Hamburger Energiewerke Energie Hub Moorburg GmbHHamburgDeadline: Jul 20Ziel des Vorhabens ist die Errichtung eines betriebsbereiten Batteriespeichers mit einer installierten Leistung von 200 MW und einer Speicherkapazität zwischen 400 und 800 MWh. Die Anlage ist als kommerziell betriebene Anlage konzipiert und vorrangig auf die Teilnahme am Stromgroßhandel (Day-Ahead und Intraday) sowie an den Regelenergiemärkten ausgerichtet und sie soll einen Beitrag zur Stabilisierung des Stromnetzes leisten, die Integration erneuerbarer Energien unterstützen und Flexibilität im Energiesystem bereitstellen. Die Realisierung erfolgt vollumfänglich über einen EPC-Vertrag. Der Auftragnehmer übernimmt die Gesamtverantwortung für Planung, Beschaffung, Errichtung, Inbetriebnahme und Übergabe der schlüsselfertigen Anlage. Die Liefer- und Leistungsgrenze bildet das Umspannwerk, an das der Speicher angeschlossen wird. Darüber hinaus umfasst die Ausschreibung den geordneten Übergang in den Betrieb sowie langfristige betriebliche Absicherungen. Hierzu zählen insbesondere ein mehrjähriger Betriebs- und Wartungsvertrag (O&M), Verfügbarkeits- und Leistungsgarantien einschließlich der Absicherung der Kapazität über die Lebensdauer (Degradation), erweiterte Gewährleistungs- und Langzeitgarantien sowie eine gesicherte Ersatzteilbevorratung. Ziel ist ein über den gesamten Lebenszyklus zuverlässiger und wirtschaftlicher Anlagenbetrieb. The objective of the project is the construction of an operational battery storage facility with an installed power of 200 MW and a storage capacity between 400 and 800 MWh. The plant is designed as a commercially operated facility and is primarily geared towards participation in the wholesale electricity market (day-ahead and intraday) and the balancing energy markets. It is intended to contribute to the stabilisation of the power grid, support the integration of renewable energies and provide flexibility within the energy system. The project is realised entirely under an EPC contract. The contractor assumes overall responsibility for the design, procurement, construction, commissioning and handover of the turnkey plant. The supply and performance boundary is formed by the substation to which the storage facility is connected. In addition, the tender covers the transition into operation as well as long-term operational safeguards. These include in particular a multi-year operation and maintenance contract (O&M), availability and performance guarantees including safeguarding of the capacity over the service life (degradation), extended warranty and long-term guarantees as well as a secured spare parts stock. The objective is reliable and economic plant operation throughout the entire life cycle.Electronic storage management system with storage fittings and scanners.
Innherred AnskaffelserInderøyDeadline: Aug 13Steinkjer municipality needs to procure a comprehensive system for electronic warehouse management of consumables across the municipality ́s entities and storage locations. The need comprises consumables broadly and is not limited to medical consumables. The procurement also includes options for Namsos and Grong municipalities.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 24. August 2026.
- Who is the contracting authority?
- The contracting authority is daa plc.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.