Trianel Flexibilitätsprojekte GmbH & Co. KGAachenTED
RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption
Preliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver...
Earthworks, Electrical Installation, Pipeline Construction, Industrial Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Trianel Flexibilitätsprojekte GmbH & Co. KG
- Published:
- July 23, 2026
- Deadline:
- August 24, 2026
- Topic:
- Earthworks
- Object:
- Photovoltaikanlage (PV)
Object classification
- Photovoltaikanlage (PV)Primary
Tender description
Show full descriptionCollapse description
Preliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver a power of 7.5 to a maximum of 10 MW and have a capacity of 2 to a maximum of 3 hours. The BESS should preferably be based on lithium-ion or sodium-ion battery technology and designed for commercial operation in the German electricity market. The possible lithium-ion technologies will be specified in more detail during the tender. The system is expected to support, among others, participation in Frequency Containment Reserve, Automatic Frequency Restoration Reserve, Day-Ahead and Intraday markets. The project site has already been secured and is currently used as agricultural land. The existing substation is located on the adjacent property, with an estimated cable route of less than 100 m. The site is located within Water Protection Zone III, which requires appropriate consideration of water protection, containment, drainage and environmental requirements. Planning permission for this project has not yet been granted. The project is intended to be tendered as a turnkey EPC project, including engineering, procurement, construction, installation, grid connection interface, testing, commissioning and handover of a fully operational BESS. The tender may also cover related maintenance services, which are subject to a Long-Term Service Agreement (LTSA). The contracting authorities reserve the right to set the term of this LTSA for up to 15 years. The companies have no legal right to conclude an LTSA with a specific term. The final technical requirements, interface definitions, contractual conditions and detailed scope of work will be specified during the subsequent RFP phase. Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock49 details capturedDocuments
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption
Trianel Flexibilitätsprojekte GmbH & Co. KGAachenPreliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver a power of 7.5 to a maximum of 10 MW and have a capacity of 2 to a maximum of 3 hours. The BESS should preferably be based on lithium-ion or sodium-ion battery technology and designed for commercial operation in the German electricity market. The possible lithium-ion technologies will be specified in more detail during the tender. The system is expected to support, among others, participation in Frequency Containment Reserve, Automatic Frequency Restoration Reserve, Day-Ahead and Intraday markets. The project site has already been secured and is currently used as agricultural land. The existing substation is located on the adjacent property, with an estimated cable route of less than 100 m. The site is located within Water Protection Zone III, which requires appropriate consideration of water protection, containment, drainage and environmental requirements. Planning permission for this project has not yet been granted. The project is intended to be tendered as a turnkey EPC project, including engineering, procurement, construction, installation, grid connection interface, testing, commissioning and handover of a fully operational BESS. The tender may also cover related maintenance services, which are subject to a Long-Term Service Agreement (LTSA). The contracting authorities reserve the right to set the term of this LTSA for up to 15 years. The companies have no legal right to conclude an LTSA with a specific term. The final technical requirements, interface definitions, contractual conditions and detailed scope of work will be specified during the subsequent RFP phase. Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition.RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption
Trianel Flexibilitätsprojekte GmbH & Co. KGAachenDeadline: Aug 24Preliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver a power of 7.5 to a maximum of 10 MW and have a capacity of 2 to a maximum of 3 hours. The BESS should preferably be based on lithium-ion or sodium-ion battery technology and designed for commercial operation in the German electricity market. The possible lithium-ion technologies will be specified in more detail during the tender. The system is expected to support, among others, participation in Frequency Containment Reserve, Automatic Frequency Restoration Reserve, Day-Ahead and Intraday markets. The project site has already been secured and is currently used as agricultural land. The existing substation is located on the adjacent property, with an estimated cable route of less than 100 m. The site is located within Water Protection Zone III, which requires appropriate consideration of water protection, containment, drainage and environmental requirements. Planning permission for this project has not yet been granted. The project is intended to be tendered as a turnkey EPC project, including engineering, procurement, construction, installation, grid connection interface, testing, commissioning and handover of a fully operational BESS. The tender may also cover related maintenance services, which are subject to a Long-Term Service Agreement (LTSA). The contracting authorities reserve the right to set the term of this LTSA for up to 15 years. The companies have no legal right to conclude an LTSA with a specific term. The final technical requirements, interface definitions, contractual conditions and detailed scope of work will be specified during the subsequent RFP phase. Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition.RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption
Trianel Flexibilitätsprojekte GmbH & Co. KGAachenPreliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver a power of 7.5 to a maximum of 10 MW and have a capacity of 2 to a maximum of 3 hours. The BESS should preferably be based on lithium-ion or sodium-ion battery technology and designed for commercial operation in the German electricity market. The possible lithium-ion technologies will be specified in more detail during the tender. The system is expected to support, among others, participation in Frequency Containment Reserve, Automatic Frequency Restoration Reserve, Day-Ahead and Intraday markets. The project site has already been secured and is currently used as agricultural land. The existing substation is located on the adjacent property, with an estimated cable route of less than 100 m. The site is located within Water Protection Zone III, which requires appropriate consideration of water protection, containment, drainage and environmental requirements. Planning permission for this project has not yet been granted. The project is intended to be tendered as a turnkey EPC project, including engineering, procurement, construction, installation, grid connection interface, testing, commissioning and handover of a fully operational BESS. The tender may also cover related maintenance services, which are subject to a Long-Term Service Agreement (LTSA). The contracting authorities reserve the right to set the term of this LTSA for up to 15 years. The companies have no legal right to conclude an LTSA with a specific term. The final technical requirements, interface definitions, contractual conditions and detailed scope of work will be specified during the subsequent RFP phase. Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition.RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption
Trianel Flexibilitätsprojekte GmbH & Co. KGAachenDeadline: Aug 24Preliminary Scope of Work: The project comprises the implementation of a turnkey 10 MW / 20 MWh AC-coupled Battery Energy Storage System (BESS) connected to the public grid via an existing 20 kV grid connection point at an adjacent MV/HV substation in 74821 Mosbach, Germany. At the grid connection point, the storage is supposed to deliver a power of 7.5 to a maximum of 10 MW and have a capacity of 2 to a maximum of 3 hours. The BESS should preferably be based on lithium-ion or sodium-ion battery technology and designed for commercial operation in the German electricity market. The possible lithium-ion technologies will be specified in more detail during the tender. The system is expected to support, among others, participation in Frequency Containment Reserve, Automatic Frequency Restoration Reserve, Day-Ahead and Intraday markets. The project site has already been secured and is currently used as agricultural land. The existing substation is located on the adjacent property, with an estimated cable route of less than 100 m. The site is located within Water Protection Zone III, which requires appropriate consideration of water protection, containment, drainage and environmental requirements. Planning permission for this project has not yet been granted. The project is intended to be tendered as a turnkey EPC project, including engineering, procurement, construction, installation, grid connection interface, testing, commissioning and handover of a fully operational BESS. The tender may also cover related maintenance services, which are subject to a Long-Term Service Agreement (LTSA). The contracting authorities reserve the right to set the term of this LTSA for up to 15 years. The companies have no legal right to conclude an LTSA with a specific term. The final technical requirements, interface definitions, contractual conditions and detailed scope of work will be specified during the subsequent RFP phase. Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition.EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg
Hamburger Energiewerke Energie Hub Moorburg GmbHHamburgDeadline: Jul 20Ziel des Vorhabens ist die Errichtung eines betriebsbereiten Batteriespeichers mit einer installierten Leistung von 200 MW und einer Speicherkapazität zwischen 400 und 800 MWh. Die Anlage ist als kommerziell betriebene Anlage konzipiert und vorrangig auf die Teilnahme am Stromgroßhandel (Day-Ahead und Intraday) sowie an den Regelenergiemärkten ausgerichtet und sie soll einen Beitrag zur Stabilisierung des Stromnetzes leisten, die Integration erneuerbarer Energien unterstützen und Flexibilität im Energiesystem bereitstellen. Die Realisierung erfolgt vollumfänglich über einen EPC-Vertrag. Der Auftragnehmer übernimmt die Gesamtverantwortung für Planung, Beschaffung, Errichtung, Inbetriebnahme und Übergabe der schlüsselfertigen Anlage. Die Liefer- und Leistungsgrenze bildet das Umspannwerk, an das der Speicher angeschlossen wird. Darüber hinaus umfasst die Ausschreibung den geordneten Übergang in den Betrieb sowie langfristige betriebliche Absicherungen. Hierzu zählen insbesondere ein mehrjähriger Betriebs- und Wartungsvertrag (O&M), Verfügbarkeits- und Leistungsgarantien einschließlich der Absicherung der Kapazität über die Lebensdauer (Degradation), erweiterte Gewährleistungs- und Langzeitgarantien sowie eine gesicherte Ersatzteilbevorratung. Ziel ist ein über den gesamten Lebenszyklus zuverlässiger und wirtschaftlicher Anlagenbetrieb. The objective of the project is the construction of an operational battery storage facility with an installed power of 200 MW and a storage capacity between 400 and 800 MWh. The plant is designed as a commercially operated facility and is primarily geared towards participation in the wholesale electricity market (day-ahead and intraday) and the balancing energy markets. It is intended to contribute to the stabilisation of the power grid, support the integration of renewable energies and provide flexibility within the energy system. The project is realised entirely under an EPC contract. The contractor assumes overall responsibility for the design, procurement, construction, commissioning and handover of the turnkey plant. The supply and performance boundary is formed by the substation to which the storage facility is connected. In addition, the tender covers the transition into operation as well as long-term operational safeguards. These include in particular a multi-year operation and maintenance contract (O&M), availability and performance guarantees including safeguarding of the capacity over the service life (degradation), extended warranty and long-term guarantees as well as a secured spare parts stock. The objective is reliable and economic plant operation throughout the entire life cycle.EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg
Hamburger Energiewerke Energie Hub Moorburg GmbHHamburgZiel des Vorhabens ist die Errichtung eines betriebsbereiten Batteriespeichers mit einer installierten Leistung von 200 MW und einer Speicherkapazität zwischen 400 und 800 MWh. Die Anlage ist als kommerziell betriebene Anlage konzipiert und vorrangig auf die Teilnahme am Stromgroßhandel (Day-Ahead und Intraday) sowie an den Regelenergiemärkten ausgerichtet und sie soll einen Beitrag zur Stabilisierung des Stromnetzes leisten, die Integration erneuerbarer Energien unterstützen und Flexibilität im Energiesystem bereitstellen. Die Realisierung erfolgt vollumfänglich über einen EPC-Vertrag. Der Auftragnehmer übernimmt die Gesamtverantwortung für Planung, Beschaffung, Errichtung, Inbetriebnahme und Übergabe der schlüsselfertigen Anlage. Die Liefer- und Leistungsgrenze bildet das Umspannwerk, an das der Speicher angeschlossen wird. Darüber hinaus umfasst die Ausschreibung den geordneten Übergang in den Betrieb sowie langfristige betriebliche Absicherungen. Hierzu zählen insbesondere ein mehrjähriger Betriebs- und Wartungsvertrag (O&M), Verfügbarkeits- und Leistungsgarantien einschließlich der Absicherung der Kapazität über die Lebensdauer (Degradation), erweiterte Gewährleistungs- und Langzeitgarantien sowie eine gesicherte Ersatzteilbevorratung. Ziel ist ein über den gesamten Lebenszyklus zuverlässiger und wirtschaftlicher Anlagenbetrieb. The objective of the project is the construction of an operational battery storage facility with an installed power of 200 MW and a storage capacity between 400 and 800 MWh. The plant is designed as a commercially operated facility and is primarily geared towards participation in the wholesale electricity market (day-ahead and intraday) and the balancing energy markets. It is intended to contribute to the stabilisation of the power grid, support the integration of renewable energies and provide flexibility within the energy system. The project is realised entirely under an EPC contract. The contractor assumes overall responsibility for the design, procurement, construction, commissioning and handover of the turnkey plant. The supply and performance boundary is formed by the substation to which the storage facility is connected. In addition, the tender covers the transition into operation as well as long-term operational safeguards. These include in particular a multi-year operation and maintenance contract (O&M), availability and performance guarantees including safeguarding of the capacity over the service life (degradation), extended warranty and long-term guarantees as well as a secured spare parts stock. The objective is reliable and economic plant operation throughout the entire life cycle.Framework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
Trianel Energieprojekte GmbH & Co. KGAachenTEP is looking for up to six framework agreement partners as suitable suppliers for the supply of the core components consisting in particular of battery storage, battery inverter, transformer station and battery management system (BMS) and power plant controller. The supplier is also responsible for the commissioning of the components it supplies. In addition, a long-term service contract is to be awarded, which includes warranty extensions and is intended to ensure the performance of the system. After successful participation in the participant competition, selected companies will be invited to submit bids on the basis of a project profile including performance requirements and a term sheet. During the bidding phase (following the conclusion of the prequalification process), bidders are required to provide cost estimates for two specific projects. TEP intends to award these specific projects directly to the best bidder(s) upon awarding the framework agreement. However, TEP also reserves the right not to award the projects to be costed, but rather to use them solely as a basis for selection when awarding up to six framework agreements, based on the award criteria. Consequently, there is no entitlement to be awarded a contract. Project No. 1 is located in Mecklenburg-Western Pomerania with a volume of 100 MW / 400 MWh. Project No. 2 is located in North Rhine-Westphalia with a volume of 20 MW / 40 MWh. TEP reserves the right to transfer call-offs or individual orders placed under the framework agreements to affiliated legal entities. This means that TEP will not necessarily be the contracting party for the individual orders placed under the framework agreements. This applies to subsidiaries of Trianel GmbH, of Trianel Flexibilitätsprojekte GmbH & Co. KG or Trianel Energieprojekte GmbH & Co. KG that are yet to be established, as well as the following companies affiliated with TEP: - TEP Amphitrite GmbH & Co. KG - TEP Arkas GmbH & Co. KG - TEP AT GmbH - TEP Bellona GmbH & Co. KG - TEP Epsilon GmbH & Co. KG - TEP Eunomia GmbH & Co. KG - TEP Fortuna GmbH & Co. KG - TEP Irene GmbH & Co. KG - TEP Kalliope GmbH & Co. KG - TEP Lutetia GmbH & Co. KG - TEP Massalia GmbH & Co. KG - TEP Netze GmbH & Co. KG - TEP Thalia GmbH & Co. KG - TEP Themis GmbH & Co. KG - TEP Vesta GmbH & Co. KG - TEP Victoria GmbH & Co. KG - Infrastruktur Kamerland GmbH & Co. KG - TAP Windprojekte GmbH & Co. KG Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition. The actual demand-or the scale of the framework agreements to be awarded-is difficult to forecast, particularly due to the unpredictability of the required battery storage capacity. Based on the estimated demand volumes, the total volume under the framework agreement is estimated to be approximately 8 GWh over the contract term of up to eight years. The maximum volume applicable under the framework agreement is 10 GWh.Framework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
Trianel Energieprojekte GmbH & Co. KGAachenDeadline: Sep 14TEP is looking for up to six framework agreement partners as suitable suppliers for the supply of the core components consisting in particular of battery storage, battery inverter, transformer station and battery management system (BMS) and power plant controller. The supplier is also responsible for the commissioning of the components it supplies. In addition, a long-term service contract is to be awarded, which includes warranty extensions and is intended to ensure the performance of the system. After successful participation in the participant competition, selected companies will be invited to submit bids on the basis of a project profile including performance requirements and a term sheet. During the bidding phase (following the conclusion of the prequalification process), bidders are required to provide cost estimates for two specific projects. TEP intends to award these specific projects directly to the best bidder(s) upon awarding the framework agreement. However, TEP also reserves the right not to award the projects to be costed, but rather to use them solely as a basis for selection when awarding up to six framework agreements, based on the award criteria. Consequently, there is no entitlement to be awarded a contract. Project No. 1 is located in Mecklenburg-Western Pomerania with a volume of 100 MW / 400 MWh. Project No. 2 is located in North Rhine-Westphalia with a volume of 20 MW / 40 MWh. TEP reserves the right to transfer call-offs or individual orders placed under the framework agreements to affiliated legal entities. This means that TEP will not necessarily be the contracting party for the individual orders placed under the framework agreements. This applies to subsidiaries of Trianel GmbH, of Trianel Flexibilitätsprojekte GmbH & Co. KG or Trianel Energieprojekte GmbH & Co. KG that are yet to be established, as well as the following companies affiliated with TEP: - TEP Amphitrite GmbH & Co. KG - TEP Arkas GmbH & Co. KG - TEP AT GmbH - TEP Bellona GmbH & Co. KG - TEP Epsilon GmbH & Co. KG - TEP Eunomia GmbH & Co. KG - TEP Fortuna GmbH & Co. KG - TEP Irene GmbH & Co. KG - TEP Kalliope GmbH & Co. KG - TEP Lutetia GmbH & Co. KG - TEP Massalia GmbH & Co. KG - TEP Netze GmbH & Co. KG - TEP Thalia GmbH & Co. KG - TEP Themis GmbH & Co. KG - TEP Vesta GmbH & Co. KG - TEP Victoria GmbH & Co. KG - Infrastruktur Kamerland GmbH & Co. KG - TAP Windprojekte GmbH & Co. KG Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition. The actual demand-or the scale of the framework agreements to be awarded-is difficult to forecast, particularly due to the unpredictability of the required battery storage capacity. Based on the estimated demand volumes, the total volume under the framework agreement is estimated to be approximately 8 GWh over the contract term of up to eight years. The maximum volume applicable under the framework agreement is 10 GWh.Framework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
Trianel Energieprojekte GmbH & Co. KGAachenDeadline: Sep 14TEP is looking for up to six framework agreement partners as suitable suppliers for the supply of the core components consisting in particular of battery storage, battery inverter, transformer station and battery management system (BMS) and power plant controller. The supplier is also responsible for the commissioning of the components it supplies. In addition, a long-term service contract is to be awarded, which includes warranty extensions and is intended to ensure the performance of the system. After successful participation in the participant competition, selected companies will be invited to submit bids on the basis of a project profile including performance requirements and a term sheet. During the bidding phase (following the conclusion of the prequalification process), bidders are required to provide cost estimates for two specific projects. TEP intends to award these specific projects directly to the best bidder(s) upon awarding the framework agreement. However, TEP also reserves the right not to award the projects to be costed, but rather to use them solely as a basis for selection when awarding up to six framework agreements, based on the award criteria. Consequently, there is no entitlement to be awarded a contract. Project No. 1 is located in Mecklenburg-Western Pomerania with a volume of 100 MW / 400 MWh. Project No. 2 is located in North Rhine-Westphalia with a volume of 20 MW / 40 MWh. TEP reserves the right to transfer call-offs or individual orders placed under the framework agreements to affiliated legal entities. This means that TEP will not necessarily be the contracting party for the individual orders placed under the framework agreements. This applies to subsidiaries of Trianel GmbH, of Trianel Flexibilitätsprojekte GmbH & Co. KG or Trianel Energieprojekte GmbH & Co. KG that are yet to be established, as well as the following companies affiliated with TEP: - TEP Amphitrite GmbH & Co. KG - TEP Arkas GmbH & Co. KG - TEP AT GmbH - TEP Bellona GmbH & Co. KG - TEP Epsilon GmbH & Co. KG - TEP Eunomia GmbH & Co. KG - TEP Fortuna GmbH & Co. KG - TEP Irene GmbH & Co. KG - TEP Kalliope GmbH & Co. KG - TEP Lutetia GmbH & Co. KG - TEP Massalia GmbH & Co. KG - TEP Netze GmbH & Co. KG - TEP Thalia GmbH & Co. KG - TEP Themis GmbH & Co. KG - TEP Vesta GmbH & Co. KG - TEP Victoria GmbH & Co. KG - Infrastruktur Kamerland GmbH & Co. KG - TAP Windprojekte GmbH & Co. KG Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition. The actual demand-or the scale of the framework agreements to be awarded-is difficult to forecast, particularly due to the unpredictability of the required battery storage capacity. Based on the estimated demand volumes, the total volume under the framework agreement is estimated to be approximately 8 GWh over the contract term of up to eight years. The maximum volume applicable under the framework agreement is 10 GWh.UNITED HEAT Wastewater Heat Pump - EPC-Contractor - Detailed Engineering and Construction
Stadtwerke Görlitz AGGörlitzDeadline: Aug 23Description of the Scope of Services Project: The United Heat project will connect the existing district heating systems of Görlitz and Zgor-zelec to create a shared cross-border heat network. The German and Polish networks will be thermal-ly interconnected, enabling heat transfer in both directions. Further information on the planned en-ergy mix and generation concept is available at: https://united-heat.com/de/. Purpose of this Prior Information Notice: This notice informs suitable companies at an early stage about the planned procurement of the work packages described below. It serves as an initial market approach and allows interested companies to prepare in good time. Binding requirements will be set out only in the subsequent procurement documents. Description: The generation and interconnection site at "Klärwerk Nord" is a key element of United Heat. Its objective is to provide climate-neutral district heating and establish, in the longer term, a cross-border thermal link between the district heating systems. • WP 12 covers the connection to a separate cross-border district heating pipeline to be con-nected at a later stage, including pipeline installation and civil works. • WP 20 covers the large-scale wastewater heat pump, including water abstraction and return, the energy centre, electrical, instrumentation and control systems, and integration into the district heating network. The two work packages will be considered together to combine technical optimisation, permitting feasibility, security of supply, construction sequencing and the operating concept within one inte-grated approach. The contract is intended to be awarded to a general contractor or capable consorti-um. • Design and optimisation: Review and further development of the reference design, detailed engineering and optimisation within the functional requirements. • Plant and infrastructure delivery: Construction of the heat pump energy centre, heat ex-changers, piping, route sections, power sup
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 24. August 2026.
- Who is the contracting authority?
- The contracting authority is Trianel Flexibilitätsprojekte GmbH & Co. KG.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.