European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsTED
Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 bar...
Photovoltaics, Energy Storage, Hydrogen
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs
- Published:
- August 23, 2026
- Deadline:
- October 01, 2026
- Topic:
- Photovoltaics
Tender description
Show full descriptionCollapse description
The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEXclassified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: An MV/LV transformer A thermal management system (dry cooler) A lowpressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for selfconsumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's cogenerators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from the cogenerators across current and future PV expansion scenarios
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
5 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage (H2Go Invest Project)
Oulun yliopistoOULUThis procurement is carried out as part of the H2Go Invest project, which aims to advance the hydrogen economy infrastructure in Northern Finland. The project and its investments are co-funded by the European Regional Development Fund (ERDF) by The Council of Oulu Region. The procured equipment will be used for research and piloting purposes to test hydrogen distribution, digital management systems, and material durability in cold climates. The investment framework operates in close cooperation with the H2Go Insight and H2Go Investigate research initiatives. Procurement of Relocatable filling and Hydrogen Production (electrolyser) device (designed for periodic relocation between sites, rather than a continuously mobile/wheeled vehicle) capable of operating reliably in demanding northern winter conditions with transportable hydrogen storage. It will be used to pilot hydrogen distribution in both rural and urban environments (such as Oulu and Utajärvi) for logistics companies, municipalities, and the Finnish Defence Forces. The container and its materials must be optimized and certified for structural durability in cold climates. The Contracting Authority has decided to suspend the procurement procedure. This is a contract award notice concerning the suspension of the procurement procedure. The Contracting Authority intends to re-launch the procurement through a new procurement procedure and a new call for tenders. Any amendments to the procurement requirements, procurement documents or other terms and conditions will be specified in the new call for tenders. Additional information: To this suspended procurement procedure contracting authority received also tender that was submitted after deadline (totally 4 tender was received).Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage (H2Go Invest Project)
Oulun yliopistoOULUDeadline: Sep 22This procurement is carried out as part of the H2Go Invest project, which aims to advance the hydrogen economy infrastructure in Northern Finland. The project and its investments are co-funded by the European Regional Development Fund (ERDF) by The Council of Oulu Region. The procured equipment will be used for research and piloting purposes to test hydrogen distribution, digital management systems, and material durability in cold climates. The investment framework operates in close cooperation with the H2Go Insight and H2Go Investigate research initiatives. Procurement of Relocatable filling and Hydrogen Production (electrolyser) device (designed for periodic relocation between sites, rather than a continuously mobile/wheeled vehicle) capable of operating reliably in demanding northern winter conditions with transportable hydrogen storage. It will be used to pilot hydrogen distribution in both rural and urban environments (such as Oulu and Utajärvi) for logistics companies, municipalities, and the Finnish Defence Forces. The container and its materials must be optimized and certified for structural durability in cold climates. Please note that maximum price for the Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage is 1 000 000 euros (without VAT). Procurement unit can not accept tenders exceeding this amount.NL-Petten: New gas detection system and maintenance services for GASTEF
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Aug 17The JRC would like to procure a new gas detection system, consisting of oxygen and hydrogen detectors (approx. 12 oxygen detectors and approx. 4 hydrogen detectors, exact numbers depending on the technology used), and a central control unit, for its High-Pressure Gas Testing Facility (GASTEF) to replace an outdated one. The GASTEF facility is used for the experimental assessment of safety and performance of systems and components under pressurised hydrogen, and the gas detection system has a safety purpose for the facility. Some of the detectors will need to be able to operate in an inert atmosphere, i.e. nitrogen, and be compliant to ATEX zone 2 (Hydrogen) requirements. The procurement will need to include the supply of the gas detection system equipment, its installation and commissioning at the GASTEF facility, and preventive and corrective maintenances for a period of 8 years.European public tender H2Cast Procurement & transport of Hydrogen for the benefit of Gasunie Energy Development
N.V. Nederlandse GasunieGroningenThis tender includes the procurement and delivery of Hydrogen for the H2Cast Project. H2CAST is an acronym and stands for H2 CAvern Storage Transition, i.e. the conversion of existing caverns and facilities. The H2CAST pilot project is intended to a). demonstrate the feasibility of large scale underground hydrogen storage (UHS) and to prove the suitability of the salt caverns in Etzel for hydrogen storage and b). to research the hydrogen storage operation including purification and compression. Once successfully completed the pilot project will pave the way for converting (re-purposing) and expanding the existing cavern field, including above ground processing facilities and the pipeline infrastructure to comply with the expected growing hydrogen storage demand to support the Northwest Europe region. The required quantity of hydrogen is 44.500 kilogram (KG). This hydrogen needs to be transported and delivered to Storag Etzel GmbH at the Etzel location. Delivery must be completed between April 1, 2025, and August 1, 2025, in total 110 working days.Supply of engineering services for the design ISS and WDS
The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')BarcelonaThe services of the envisaged contract concern the supply of engineering services for the design of the ITER Isotope Separation System (ISS) and Water Detritiation System (WDS). The two systems can be described as chemical plants processing tritiated water and hydrogen isotope gas streams from the ITER machine. The detritiation of the water is done by WDS and the separation and purification of the hydrogen isotope gas streams is handled by ISS. Deliveries cover final design work on both systems to prepare their manufacturing, along with other tasks like qualification of components and support to the owner. The scope covers also qualification testing of components of ISS, WDS and the REMS the Radiological Environmental Monitoring System and prototyping tasks for some components of the tritium fuel cycle.CFT - 260187 Supply, Delivery (unloaded and positioned at the point of use), Installation, Commissioning, Training, Warranty and Maintenance of a GC\MS System for Analysis of Evolved Gases and Combustion Products from Solid Fuels - PEACEPLUS Funded
Finance Directorate - Queen's University BelfastBelfastDeadline: Aug 12The School of Chemistry and Chemical Engineering requires the procurement of a Gas Chromatography–Mass Spectrometry (GC/MS) system to support the analysis of volatile and semi-volatile compounds generated from the thermal decomposition and combustion of solid fuels and related materials. The system will form part of an integrated analytical capability under the PEACEPLUS Clean Air project, supporting research, method development, and future accredited testing activity. The primary function of the GC/MS system is to enable qualitative and quantitative analysis of evolved gases and combustion products, including volatile organic compounds, oxygenated species, and other trace emissions relevant to air quality and fuel characterisation. The system must be capable of operating as a standalone analytical platform and must also be compatible with a separately procured thermogravimetric analysis (TGA) system for evolved gas analysis workflows. The specification therefore includes requirements for interfacing, gas transfer, and handling of low-concentration, transient species.Mechanical and Electrical Consultancy Services for a Photovoltaic (PV) System at Joinersfolly, Kilkenny
Kilkenny and Carlow ETBKilkennyRequest for Tenders to establish a Mechanical and Electrical-led Design Team to manage the design and installation of a PV System for Kilkenny and Carlow Education and Training Board (KCETB). The system will be located in Joinersfolly, Kilkenny and within the site boundary of the The College of the Future.All risks insurance contract for direct physical loss or damage at the JRC sites.
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Jul 09The JRC intends to sign five insurance contracts covering fire, natural and industrial hazards and material damage to nuclear and non-nuclear installations at five JRC research sites (Ispra, Geel, Petten, Karlsruhe, Seville). The insurance must cover the buildings (nuclear reactors, nuclear laboratories, offices, welfare services, non-nuclear laboratories) and their content (machinery and equipment, laboratory instruments and consumables, fissionable material, furniture and other goods). There is one lot for each JRC site. The premium is calculated with the "replacement cost value", the current cost to replace an item or structure as new. . Each tenderer can submit an offer for one or more lots.CTF – 260188 Supply, Delivery (unloaded and positioned at the point of use), Installation, Commissioning, Training, Warranty and Maintenance of a TGA for Solid Fuel Characterisation and Evolved Gas Analysis Coupling
Finance Directorate - Queen's University BelfastBelfastDeadline: Aug 13The School of Chemistry and Chemical Engineering requires the procurement of a thermogrimetric analysis system to support the characterisation of solid fuels and related materials within the PEACEPLUS Clean Air project. The primary purpose of the equipment is to measure thermal decomposition behaviour, mass loss profiles, ash-related behaviour, and combustion characteristics of solid fuel samples under controlled atmospheres. The equipment will support research, method development, and future accredited testing activity associated with solid fuel assessment and emissions-related investigations. The required system must also include provision for coupling to a separately procured gas chromatography–mass spectrometry system for evolved gas analysis. This requirement is intended to establish a robust analytical platform aligned, where applicable, to relevant ISO and ASTM approaches for fuel and thermal analysis.Procurement of a service contract for gas installations.
NTNUTrondheimNTNU shall enter into a framework agreement for the inspection and maintenance of gas installations for NTNU ́s buildings in Trondheim. The delivery and place of work for the deliveries will be NTNU in Trondheim. The gas installations included in this agreement are located in a total of 15 different buildings in Trondheim. The buildings are mainly located at Gløshaugen in addition to a small number on Brattøra and Øya. The service contract is administered by the property department at NTNU, but the gas installations are owned by different institutes and the work shall be invoiced directly to each individual institute/site owner, total 23 units. The facilities currently include approx. 269 gas centrals with a total of 1,484 call-offs. The contracting authority is different departments and faculty at NTNU, Rise PFI AS and Sintef, each of which is the owner and orderer for their plants. The contract shall be a complete service agreement that includes: • Annual systematic condition checks • Improvements, including maintenance and repairs, as well as minor expansions and changes in the existing installations, as needed. • Re-opening and shut-off of systems and components as needed, a complete description of the delivery is in the requirement specifications.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 01. Oktober 2026.
- Who is the contracting authority?
- The contracting authority is European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.