Oulun yliopistoOULUTED
Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage (H2Go Invest Project)
This procurement is carried out as part of the H2Go Invest project, which aims to advance the hydrogen economy infrastructure in Northern Finland. The project and its investments are co-funded by the European Regional Development Fund (ERDF) by The Council of Oulu Region. The procured equipment will be used for research and piloting purpo...
Energy Storage, Hydrogen
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Oulun yliopisto
- Published:
- August 16, 2026
- Deadline:
- Not specified
- Topic:
- Energy Storage
Tender description
Show full descriptionCollapse description
This procurement is carried out as part of the H2Go Invest project, which aims to advance the hydrogen economy infrastructure in Northern Finland. The project and its investments are co-funded by the European Regional Development Fund (ERDF) by The Council of Oulu Region. The procured equipment will be used for research and piloting purposes to test hydrogen distribution, digital management systems, and material durability in cold climates. The investment framework operates in close cooperation with the H2Go Insight and H2Go Investigate research initiatives. Procurement of Relocatable filling and Hydrogen Production (electrolyser) device (designed for periodic relocation between sites, rather than a continuously mobile/wheeled vehicle) capable of operating reliably in demanding northern winter conditions with transportable hydrogen storage. It will be used to pilot hydrogen distribution in both rural and urban environments (such as Oulu and Utajärvi) for logistics companies, municipalities, and the Finnish Defence Forces. The container and its materials must be optimized and certified for structural durability in cold climates. The Contracting Authority has decided to suspend the procurement procedure. This is a contract award notice concerning the suspension of the procurement procedure. The Contracting Authority intends to re-launch the procurement through a new procurement procedure and a new call for tenders. Any amendments to the procurement requirements, procurement documents or other terms and conditions will be specified in the new call for tenders. Additional information: To this suspended procurement procedure contracting authority received also tender that was submitted after deadline (totally 4 tender was received).
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage (H2Go Invest Project)
Oulun yliopistoOULUDeadline: Sep 22This procurement is carried out as part of the H2Go Invest project, which aims to advance the hydrogen economy infrastructure in Northern Finland. The project and its investments are co-funded by the European Regional Development Fund (ERDF) by The Council of Oulu Region. The procured equipment will be used for research and piloting purposes to test hydrogen distribution, digital management systems, and material durability in cold climates. The investment framework operates in close cooperation with the H2Go Insight and H2Go Investigate research initiatives. Procurement of Relocatable filling and Hydrogen Production (electrolyser) device (designed for periodic relocation between sites, rather than a continuously mobile/wheeled vehicle) capable of operating reliably in demanding northern winter conditions with transportable hydrogen storage. It will be used to pilot hydrogen distribution in both rural and urban environments (such as Oulu and Utajärvi) for logistics companies, municipalities, and the Finnish Defence Forces. The container and its materials must be optimized and certified for structural durability in cold climates. Please note that maximum price for the Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage is 1 000 000 euros (without VAT). Procurement unit can not accept tenders exceeding this amount.Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Oct 01The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEXclassified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: An MV/LV transformer A thermal management system (dry cooler) A lowpressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for selfconsumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's cogenerators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from the cogenerators across current and future PV expansion scenariosPre-Market Consultation – 48-inch Valves for Offshore Hydrogen Pipeline
AquaDuctus Pipeline GmbH (a subsidiary of GASCADE Gastransport GmbH); supported by Worley Projects as appointed EPCM.KölnOur client is currently preparing the procurement strategy for a 48-inch offshore pipeline intended for the transportation of gaseous hydrogen in the North Sea. In this context, our client, supported by Worley Projects GmbH (acting as EPCm contractor for and on behalf of the client), hereby invites your organisation to participate in a non-binding pre-market consultation (Markterkundung) conducted in accordance with §26 of the German Sector Regulation (SektVO), as part of the applicable German legislation that implements European Union public tendering rules. This consultation is of a purely exploratory nature and serves exclusively to support the client’s internal preparation of a potential future procurement procedure. Any information exchanged in the context of this consultation is purely informative, non-binding, indicative only, and subject to change. Please note that this is not a request for quotation. This request does not constitute the launch of a procurement procedure and does not create any obligation for the contracting authority to procure, tender, award or contract any scope of supply. The contracting authority reserves the right to decide on any further steps. Should a procurement need be identified following the completion of the pre-market consultation, a formal procurement procedure will be initiated, provided the relevant conditions are met. Your feedback within the scope of this pre-market consultation is non-binding and will not affect your chances in any potential future procurement procedure. The purpose of this market consultation is to obtain non‑binding, high‑level information from potential market participants in order to: • Connect with the market to prepare our execution strategy, • Assess the technical feasibility and understand technical limitations of supplying 48-inch valves for connecting the line pipe suitable for hydrogen service in compliance with the minimum requirements of API 6D Annex M, • Understand manufacturing routes, quProcurement of archive system Nordland fylkeskommune - Prequalification
Nordland fylkeskommuneBODØDeadline: Aug 12Nordland county hereby invites tenderers to prequalification for the procurement of a new case archive system. The procurement will be implemented in accordance with the negotiated procedure after a prior notice. The contract will be signed in accordance with the Government Standard Terms and Conditions for ongoing service contracts SSA-L.Procurement - Transport and treatment of wood, 2026
Attvin Produksjon ASÅlesundDeadline: Aug 11The contracting authority would like to use this procurement to enter into a framework agreement with one tenderer. The objective of the agreement is to cover the customers ́needs for collection, transportation and treatment of milled wood from Attvin Produksjon AS. The contracting authority would like as much wood as possible to be used for a certified treatment facility, for recycling. The remaining amounts shall be for energy recovery at certified incineration plants. Comments on the contract: Treatment of treated wood (defined as hazardous waste) is not a part of the agreement. •If the tenderer is not carrying out the obligations in accordance with the above, the customer has the right to. order transport and final treatment for other approved incineration plants with recycling or energy recovery at the tenderer's expense.Market Consultation Markterkundung with §26 of the German Sector Regulation (SektVO
AquaDuctus Pipeline GmbHKasselOur client is currently preparing the procurement strategy for a large diameter offshore pipeline intended for the transportation of gaseous hydrogen in the North Sea. In this context, our client, supported by Worley Projects GmbH (acting as EPCm contractor for and on behalf of the client), hereby invites your organisation to participate in a non-binding pre market consultation (Markterkundung) conducted in accordance with §26 of the German Sector Regulation (SektVO), as part of the applicable German legislation that implements European Union public tendering rules. This consultation is of a purely exploratory nature and serves exclusively to support the client’s internal preparation of a potential future procurement procedure. Any information exchanged in the context of this consultation is purely informative, non binding, indicative only, and subject to change. Please note that this is not a request for quotation. This request does not constitute the launch of a procurement procedure and does not create any obligation for the contracting authority to procure, tender, award or contract any scope of supply. The contracting authority reserves the right to decide on any further steps. Should a procurement need be identified following the completion of the pre market consultation, a formal procurement procedure will be initiated, provided the relevant conditions are met. Your feedback within the scope of this pre market consultation is non binding and will not affect your chances in any potential future procurement procedure. The purpose of this market consultation is to obtain non‑binding, high‑level information from potential market participants in order to: • Connect with the market to prepare our execution strategy, • Assess the technical feasibility of supplying large‑diameter subsea line pipe suitable for hydrogen service, • Understand manufacturing routes, qualification approaches and constraints, • Identify indicative capacities and lead times, and • Support the preparation of transparent, competition‑neutral tender documentation for a potential future procurement procedure. We are currently evaluating our sourcing needs and participants will be invited to provide input on topics such as: • Manufacturing capability for large diameter line pipe • Experience with hydrogen • Material grades and qualification considerations (e.g. fracture toughness, testing regimes) • External corrosion coating and concrete weight coating feasibility • Quality assurance, inspection and traceability practices • Indicative production capacities and order of magnitude lead times • Key technical or supply chain risks relevant to this type of project Should you be interested in participating, please confirm your interest by contacting the Single point of Contact mentioned above. Please note that first a non-disclosure agreement (NDA) needs to be signed to protect the confidentiality of the client’s information. The NDA must be completed, stamped and signed. Once the NDA has been received and deemed complete, your organisation may be added as a registered participant in the market consultation process. Upon confirmation and signing of the NDA, you will receive: • the consultation questionnaire (including supporting documentation, and • further practical details regarding the process and timeline.Events Organisation and Meeting Management services
European Union Agency for Cybersecurity (ENISA)AthensDeadline: Sep 17This call for tenders is being launched as an interagency procurement, under the lead of the European Union Agency for Cybersecurity (lead contracting authority) with the participation of ECCC (participating entity) hereinafter collectively referred to as “the Contracting Authority”. By means of this Call for Tenders the Contracting Authority seeks to conclude a single framework contract with a qualified economic operator able to provide a wide range of services to both Agencies in order to support events organisation and meeting management.European public tender H2Cast Procurement & transport of Hydrogen for the benefit of Gasunie Energy Development
N.V. Nederlandse GasunieGroningenThis tender includes the procurement and delivery of Hydrogen for the H2Cast Project. H2CAST is an acronym and stands for H2 CAvern Storage Transition, i.e. the conversion of existing caverns and facilities. The H2CAST pilot project is intended to a). demonstrate the feasibility of large scale underground hydrogen storage (UHS) and to prove the suitability of the salt caverns in Etzel for hydrogen storage and b). to research the hydrogen storage operation including purification and compression. Once successfully completed the pilot project will pave the way for converting (re-purposing) and expanding the existing cavern field, including above ground processing facilities and the pipeline infrastructure to comply with the expected growing hydrogen storage demand to support the Northwest Europe region. The required quantity of hydrogen is 44.500 kilogram (KG). This hydrogen needs to be transported and delivered to Storag Etzel GmbH at the Etzel location. Delivery must be completed between April 1, 2025, and August 1, 2025, in total 110 working days.Procurement of geotechnical drilling rigs.
Statens vegvesenMossThe contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment involves delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.Pre-Market Consultation – 48-inch Valves for Offshore Hydrogen Pipeline
AquaDuctus Pipeline GmbH (a subsidiary of GASCADE Gastransport GmbH); supported by Worley Projects as appointed EPCM.KölnOur client is currently preparing the procurement strategy for a 48-inch offshore pipeline intended for the transportation of gaseous hydrogen in the North Sea. In this context, our client, supported by Worley Projects GmbH (acting as EPCm contractor for and on behalf of the client), hereby invites your organisation to participate in a non-binding pre-market consultation (Markterkundung) conducted in accordance with §26 of the German Sector Regulation (SektVO), as part of the applicable German legislation that implements European Union public tendering rules. This consultation is of a purely exploratory nature and serves exclusively to support the client’s internal preparation of a potential future procurement procedure. Any information exchanged in the context of this consultation is purely informative, non-binding, indicative only, and subject to change. Please note that this is not a request for quotation. This request does not constitute the launch of a procurement procedure and does not create any obligation for the contracting authority to procure, tender, award or contract any scope of supply. The contracting authority reserves the right to decide on any further steps. Should a procurement need be identified following the completion of the pre-market consultation, a formal procurement procedure will be initiated, provided the relevant conditions are met. Your feedback within the scope of this pre-market consultation is non-binding and will not affect your chances in any potential future procurement procedure. The purpose of this market consultation is to obtain non‑binding, high‑level information from potential market participants in order to: • Connect with the market to prepare our execution strategy, • Assess the technical feasibility and understand technical limitations of supplying 48-inch valves for connecting the line pipe suitable for hydrogen service in compliance with the minimum requirements of API 6D Annex M, • Understand manufacturing routes, qualification approaches and constraints, • Identify indicative capacities and lead times, and • Support the preparation of transparent, competition‑neutral tender documentation for a potential future procurement procedure. We are currently evaluating our sourcing needs and participants are invited to provide non-binding and purely informative input on topics such as: • Design, Manufacture, and Testing capability for 48-inch valves • General experience with supply of valves in hydrogen service • Experience with supply of valves in compliance with API 6D Annex M, Specification Level for Hydrogen (SLH1, SLH2, SLH3, SLH4) • Experience with supply of valves in compliance with API 6D Annex I; QSL3G and QSL4G • Indicative production capacities and order of magnitude lead times • Key technical or supply chain risks relevant to this type of project Should you be interested in participating, please confirm your interest by contacting the Single point of Contact mentioned above. Please note that first a non-disclosure agreement (NDA) needs to be signed to protect the confidentiality of the client’s information. The NDA must be completed, stamped and signed. Once the NDA has been received and deemed complete, your organization may be added as a registered participant in the market consultation process. Upon confirmation and signing of the NDA, you will receive: • the consultation questionnaire (including supporting documentation), and • further practical details regarding the process and timeline.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Oulun yliopisto.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.