Offaly County Council_448TullamoreTED
Proposed R441 Road Re-Alignment Works at Monasteroris, Edenderry, County Offaly
Re-alignment and widening of existing carriageway and the construction of new footpath and cycle track. Installation of new public lighting, ducting and drainage works. Accommodation works including the diversion of existing services. Installation of road markings and traffic signs.
Straßenbau, Kanalbau, Pflasterarbeiten
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Offaly County Council_448
- Veröffentlicht:
- 01. Juli 2026
- Frist:
- 16. Juli 2026
- Thema:
- Straßenbau
- Bauobjekt:
- Straße / Fahrbahn
Bauobjekt-Klassifikation
- Straße / FahrbahnHauptobjekt
Ausschreibungsbeschreibung
Re-alignment and widening of existing carriageway and the construction of new footpath and cycle track. Installation of new public lighting, ducting and drainage works. Accommodation works including the diversion of existing services. Installation of road markings and traffic signs.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9Civil Remediation Works at IDA Parkmore West Business and Technology Park, Co. Galway
IDA IrelandDublinThe proposed works include remedial works to the road network, installation of new footpaths, installation of new road surfaces and some areas, replace existing services with new, fencing and all landscaping and ancillary works as specified in tender documentation and drawings.Lighting Upgrade Works - IDA Business and Technology Park, Letterkenny, Co. Donegal
IDA IrelandDublinDecommissioning and removal of existing lighting fixtures and columns as per drawings. Installation and commissioning of new lighting fixtures and columns and associated civils works at the IDA Business and Technology Park Letterkenny, Co. DonegalDublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme
Dublin City CouncilDublinFrist: 27. Aug.Dublin City Council aims to enhance the quality of life for its residents by developing an integrated Active Travel Network. This comprehensive network is designed to foster connections among individuals via pedestrian pathways, segregated cycle provision, and other environmentally friendly transportation alternatives. The enhancement of accessibility and interconnectivity for people walking, wheeling and cycling within this network is anticipated to play a pivotal role in mitigating carbon emissions originating from transport activities. The council’s objective is to augment the existing 40km network into a seamlessly connected 314km network spanning the entire city. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme is one of the projects identified under this initiative. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme extends along Milltown Road between Dodder walk and Dundrum Road for a length of 1.2km. The Scheme includes the provision of segregated cycle facilities, improved pedestrian facilities (footpath and junction upgrades), ducting, resurfacing etc. the scheme also includes the upgrade of two signal-controlled junctions to improve pedestrian and cyclist facilities, the two junctions are: Milltown Rd and Churchtown Rd junction and Milltown Rd and Dundrum Rd junction. The Scheme comprises: - Re-configuration of existing carriageway for inclusion of cycle provision - Site Clearance - Pavement works - Kerbs and Footways - Traffic Islands - Public lighting - Traffic signs and road markings - Drainage works - Traffic signals and Ducting - Utilities upgrades - Landscaping and Urban Realm Works - Bus Shelters (foundation only) - Bike Stands - Temporary Traffic Management Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8702210County road 49 Fossenbratte tunnel - upgrading of tunnels
Vestland fylkeskommuneLEIKANGERFrist: 16. Sept.The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentationCounty road 48 Fossenbratte tunnel - upgrading of tunnels
Vestland fylkeskommuneLEIKANGERFrist: 16. Sept.The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentationRefurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí
Údarás Na Gaeltachta_289GalwayThe proposed works will include internal modification, the construction of an extension (10m2), a glazed entrance lobby and a covered outdoor area, replacement of the existing wastewater treatment system and percolation area with a packaged Wastewater Treatment System and all associated works.Contractor Framework for Various Roads, Bridges, Public Realm and Sustainable Transportation Infrastructural Projects 2026 - 2030, €5M to €14M
Cork City CouncilCorkFrist: 04. Sept.Prequalification of a panel of Contractors to form a Framework, for various Roads, Bridges, Public Realm and Sustainable Transportation Infrastructural Projects throughout Cork City for the period 2026-2030. The projects will typically consist of street improvements/ public realm renewals, road realignments, sustainable transport projects and other relevant construction works. These include paving, road construction, drainage and ducting, street furniture, public lighting, traffic signals, and other necessary works.Reconstruction of the Bridge at km 41+040 of the Public Road of National Importance M-15 Odesa - Reni (to Bucharest), Odesa region
State Agency for Restoration and Development of Infrastructure of UkraineKyivFrist: 10. Sept.The Client seeks the execution of the Works described below to reconstruct the bridge at km 41+040 of the public road of national importance M-15 Odesa–Reni (toward Bucharest), located in Odesa region The design documentation provides for the rehabilitation and strengthening of the road embankment under terrain of complexity of Category I-b and II, with a total length of 742.86 m (right carriageway). The designed total length of the bridge is 216.65 m. This section is located in the village of Mayaki, Mayaki Territorial Community, Odesa district of Odesa region on the route to the Ukrainian-Moldavian border. The public road of national importance M-15 Odesa–Reni (toward Bucharest), with a total length of approximately 295 km, is designated as an international road in accordance with the Resolution of the Cabinet of Ministers of Ukraine of 30 January 2019. The M-15 forms an integral part of Pan-European Transport Corridor IX and the international TRACECA corridor, constituting a key transport axis facilitating international freight and passenger movement between Ukraine, the Republic of Moldova and Romania (the EU).Islandbridge Commemorative Bridge- Main Contractor
IDA IrelandDublinIt has been agreed with the Heritage properties to undertake works to the Commemorative bridge at Island Bridge, Dublin 8. The proposed pedestrian/cycle bridge comprises: • A new pedestrian and cycle bridge which will span the River Liffey and connect to an existing cycle way running along Chapelizod Road; • A formal entrance at Chapelizod Road; • An open plaza linking the entrance and bridge, to be located at the National Wat Memorial Gardens and at lands to north of River Liffey, Chapelizod Road, Islandbridge, Dublin 8. In order to ensure the safe passage of pedestrians and cyclists across the Chapelizod Road to and from the proposed open plaza, a new pedestrian crossing will be required The Irish National War Memorial Gardens are located at a place of great Historical, Cultural and Geographic importance.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 16. Juli 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Offaly County Council_448.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.