IDA IrelandDublinTED
Islandbridge Commemorative Bridge- Main Contractor
It has been agreed with the Heritage properties to undertake works to the Commemorative bridge at Island Bridge, Dublin 8. The proposed pedestrian/cycle bridge comprises: • A new pedestrian and cycle bridge which will span the River Liffey and connect to an existing cycle way running along Chapelizod Road; • A formal entrance at Chapelizo...
Straßenbau, Ingenieurbauwerke, Elektroinstallation, Pflasterarbeiten, Fenster & Türen
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- IDA Ireland
- Veröffentlicht:
- 09. Juli 2026
- Frist:
- Nicht angegeben
- Thema:
- Straßenbau
- Bauobjekt:
- Fußgänger- / Radwegbrücke
Bauobjekt-Klassifikation
- Fußgänger- / RadwegbrückeHauptobjekt
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
It has been agreed with the Heritage properties to undertake works to the Commemorative bridge at Island Bridge, Dublin 8. The proposed pedestrian/cycle bridge comprises: • A new pedestrian and cycle bridge which will span the River Liffey and connect to an existing cycle way running along Chapelizod Road; • A formal entrance at Chapelizod Road; • An open plaza linking the entrance and bridge, to be located at the National Wat Memorial Gardens and at lands to north of River Liffey, Chapelizod Road, Islandbridge, Dublin 8. In order to ensure the safe passage of pedestrians and cyclists across the Chapelizod Road to and from the proposed open plaza, a new pedestrian crossing will be required The Irish National War Memorial Gardens are located at a place of great Historical, Cultural and Geographic importance.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten6 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Contractor Framework for Various Roads, Bridges, Public Realm and Sustainable Transportation Infrastructural Projects 2026 - 2030, €5M to €14M
Cork City CouncilCorkFrist: 04. Sept.Prequalification of a panel of Contractors to form a Framework, for various Roads, Bridges, Public Realm and Sustainable Transportation Infrastructural Projects throughout Cork City for the period 2026-2030. The projects will typically consist of street improvements/ public realm renewals, road realignments, sustainable transport projects and other relevant construction works. These include paving, road construction, drainage and ducting, street furniture, public lighting, traffic signals, and other necessary works.Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme
Dublin City CouncilDublinFrist: 27. Aug.Dublin City Council aims to enhance the quality of life for its residents by developing an integrated Active Travel Network. This comprehensive network is designed to foster connections among individuals via pedestrian pathways, segregated cycle provision, and other environmentally friendly transportation alternatives. The enhancement of accessibility and interconnectivity for people walking, wheeling and cycling within this network is anticipated to play a pivotal role in mitigating carbon emissions originating from transport activities. The council’s objective is to augment the existing 40km network into a seamlessly connected 314km network spanning the entire city. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme is one of the projects identified under this initiative. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme extends along Milltown Road between Dodder walk and Dundrum Road for a length of 1.2km. The Scheme includes the provision of segregated cycle facilities, improved pedestrian facilities (footpath and junction upgrades), ducting, resurfacing etc. the scheme also includes the upgrade of two signal-controlled junctions to improve pedestrian and cyclist facilities, the two junctions are: Milltown Rd and Churchtown Rd junction and Milltown Rd and Dundrum Rd junction. The Scheme comprises: - Re-configuration of existing carriageway for inclusion of cycle provision - Site Clearance - Pavement works - Kerbs and Footways - Traffic Islands - Public lighting - Traffic signs and road markings - Drainage works - Traffic signals and Ducting - Utilities upgrades - Landscaping and Urban Realm Works - Bus Shelters (foundation only) - Bike Stands - Temporary Traffic Management Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8702210Reconstruction of the Bridge at km 41+040 of the Public Road of National Importance M-15 Odesa - Reni (to Bucharest), Odesa region
State Agency for Restoration and Development of Infrastructure of UkraineKyivFrist: 10. Sept.The Client seeks the execution of the Works described below to reconstruct the bridge at km 41+040 of the public road of national importance M-15 Odesa–Reni (toward Bucharest), located in Odesa region The design documentation provides for the rehabilitation and strengthening of the road embankment under terrain of complexity of Category I-b and II, with a total length of 742.86 m (right carriageway). The designed total length of the bridge is 216.65 m. This section is located in the village of Mayaki, Mayaki Territorial Community, Odesa district of Odesa region on the route to the Ukrainian-Moldavian border. The public road of national importance M-15 Odesa–Reni (toward Bucharest), with a total length of approximately 295 km, is designated as an international road in accordance with the Resolution of the Cabinet of Ministers of Ukraine of 30 January 2019. The M-15 forms an integral part of Pan-European Transport Corridor IX and the international TRACECA corridor, constituting a key transport axis facilitating international freight and passenger movement between Ukraine, the Republic of Moldova and Romania (the EU).VA Sletteveien-Karstensens vei AN2221
Fredrikstad kommuneFREDRIKSTADFrist: 21. Sept.The contracting authority hereby invites tenderers to a competition for a contract for a water and sewage project for Sletteveien-Karstensens vei. The procurement includes approx. 2,200 metres pipeline ditch (separation) and a new pumping station for sewage on residential streets at Lisleby. The project also includes re-establishment of road lighting installations on parts of the stretch (Karstensens vei) and upgrade of the sidewalk in Lislebyveien. The project will be carried out as an execution contract in accordance with NS8405. A comprehensive description of the delivery is in the annexes to the tender documentation.S1055 - CFT 7589192 - Main Contractor (also assuming PSCS role) for a Sports Facilities Development Project at Colaiste Dun Iascaigh, Cashel Road, Cahir, Co. Tipperary, Eircode E21 NV38
Tipperary Education and Training Board_1284NenaghMain Contractor (also assuming PSCS role) for a Sports Facilities Development Project at Colaiste Dun Iascaigh, Cashel Road, Cahir, Co. Tipperary, Eircode E21 NV38Framework agreement avalanche protection 2026-2028
Statens vegvesenMossThis framework agreement shall be a part of the stand-by for the Norwegian Public Roads Administration for avalanche protection, in Vestland and Rogaland counties. The contract can be used when the Norwegian Public Roads Administration needs to carry out minor and major avalanche protection measures, which are not announced as separate competitions.Civil Remediation Works at IDA Parkmore West Business and Technology Park, Co. Galway
IDA IrelandDublinThe proposed works include remedial works to the road network, installation of new footpaths, installation of new road surfaces and some areas, replace existing services with new, fencing and all landscaping and ancillary works as specified in tender documentation and drawings.Contract award - 260737 Vollabakken road and water and sewage.
Trondheim kommuneTRONDHEIMTrondheim municipality, hereafter called the contracting authority, invites tenderers to an open competition for a contract in the project Contract Vollabakken Road and Water and Sewage. The municipality would like tenders from tenderers with the professional, technical and economic basis necessary for fulfilment of the contract. The competition will be carried out via the municipality ́s tender implementation tool Mercell. All communication and tender submissions will be via Mercell.County road 48 Fossenbratte tunnel - upgrading of tunnels
Vestland fylkeskommuneLEIKANGERFrist: 16. Sept.The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentationDoV Framework agreement Tunnel and rock protection 2026-2028
Statens vegvesenMossFrist: 14. Aug.The Norwegian Public Roads Administration Operations and Maintenance invites tenderers to a competition for the following contract work: Framework agreement for tunnel and rock protection for Trøndelag, Møre og Romsdal. The contract includes cleaning and bolting protection, establishing of new and improving existing water and frost protection in tunnels, clearing and bolt protection in cuttings, establishing different types of meshes (ice nets, erosion network etc.), improvements and establishment of new security measures in the open air on European and national roads. in Trøndelag, Møre og Romsdal. The measures will vary in extent. Outside of general processes, a couple of concrete projects are described to be carried out: TR01: E6 Kvam – clearing and work protection cutting. Modification of the existing network TR02: E6 Cleansed - clearing and work securing cutting. Assembly of an ice network. TR03: E39 Søvassdalen - clearing and work securing cutting. Assembly of an ice network. MR01:E39 Brusdalen – clearing and work securing cutting. MR03: E136 Sørnes tunnel – Rensk and securing, establishment of a new water-frost protection vault. Consideration shall be given to set timetables for public transport. Routines must be established. for emergency emergency services. All traffic deviations/driving vehicles in tunnels shall be carried out for work. passing must be clarified by the traffic conductor with work teams in the tunnel before emergency services are released. through. There will be a lot of focus on the contract work notification as the work is ongoing on the existing road network. The location of the traffic conductor shall always be risk assessed in the contractor ́s work warning plan. The contracting authority would like parallel framework agreements with up to 3 contractors per area, based on which tender is best in accordance with the award criteria.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist IDA Ireland.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.