Vestland fylkeskommuneLEIKANGERTED
County road 49 Fossenbratte tunnel - upgrading of tunnels
The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It i...
Ingenieurbauwerke, Elektroinstallation, Kanalbau, Gebäudeautomation, Stahlbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Vestland fylkeskommune
- Veröffentlicht:
- 05. Juli 2026
- Frist:
- 16. September 2026
- Thema:
- Ingenieurbauwerke
- Bauobjekt:
- Tunnel / Unterführung
Bauobjekt-Klassifikation
- Tunnel / UnterführungHauptobjekt
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentation
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
5 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Ähnliche Bekanntmachungen
9County road 48 Fossenbratte tunnel - upgrading of tunnels
Vestland fylkeskommuneLEIKANGERFrist: 16. Sept.The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentationProcurement of tunnel washer and water extraction press for laudry.
Menova Arbeid og Inkludering ASHønefossFrist: 03. Sept.GENERAL DESCRIPTION The Contracting Authority Menova Arbeid og Inkludering AS is a competence and resource centre for work and welfare services in the Ringeriksregionen. Menova is the Ringeriksregionen ́s leading labour market company and has long and broad experience with bringing participants and employers together, so that people get to work. Our ambition is to be a strong, close and competent labour market company in the Ringerik region with NAV and our owner municipalities as prioritised customers. Menova Arbeid og Inkludering AS has a modern laundry located at Kilemoen industrial area in Hønefoss. The laundry was started in 2003 and delivers to all municipal nursing homes in Ringerike and Hole, as well as most hotels in the region. The objective of the procurement The contracting authority intends to procure new production equipment for the laundry as a part of upgrading and streamlining of the existing industrial laundry. The contract includes: - Tunnel washer - Water press - Sacks suitable for the system and the existing suspension track. - Control systems The delivery shall include project management design, disassembly, assembly, commissioning and training. A complete description is in Annex 1 - Technical Requirement Specifications. Sub-tenders Tenders cannot be submitted for parts of the delivery. The delivery shall be offered as a total system, as interaction between the components is seen as critical for the desired functionality. Delivery and assembly of tunnel washer and water press shall be carried out simultaneously. The suspension track upgrade can, as agreed, be carried out as a separate delivery. In order to maintain an efficient production at the laundry, a further determination of the date and progress for delivery and installation will be agreed with the tenderer after the contract has been signed. RULES FOR THE IMPLEMENTATION OF THE COMPETITION AND THE TENDER REQUIREMENTS Procurement procedure The procurement is implemented in accordance withHire of radar - Blåbærtinden's avalanche management facility - county road 87 Tamokdalen-Troms County.
Troms fylkeskommuneTromsøFrist: 04. Sept.Background and purpose Troms County (hereafter called the Contracting Authority) wants to secure an avalanche-prone point on county road 87 at Olsrud in Balsfjord municipality through the establishment of an avalanche warning system. This procurement is for the delivery of the actual avalanche detection system, based on radar technology. The SRO installations will be announced as a separate procurement. The Contracting Authority hereby invites tenderers to a tender offer on the delivery of avalanche monitoring for Flakstad along county road 87 in Balsfjord municipality. The monitoring system shall be able to detect avalanches and contribute to the warning and closure of the road by avalanche from Blåbærtinden, at the avalanche point Olsrud (see figure 1). The aim of the procurement is to reduce the risk of personal and material damage as a result of avalanches on roads.Invitation to a market dialogue and inspection 25.06.26 - County road 53 Årdal, Ljoteli II tunnel.
Vestland fylkeskommuneLEIKANGERFrist: 17. JuliVestland county invites relevant actors to a market dialogue and inspection in connection with the project County Road 53 Årdal, Ljoteli II tunnel, water and frost protection in Årdal municipality. Market dialogue and inspection is carried out in order to gain input from the market on project design, contract strategy etc. before the preparation of the tender documentation. Please be present Thursday 25.06.26, 10.00 at Årdalshallen for a presentation of the project and subsequent inspection at the tunnel site. Please consult the attached document for more information.Rehabilitation of 9 Tunnels on the Vrbnica–Bar Railway Line, Montenegro
Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojFrist: 24. Aug.Rehabilitation works on nine railway tunnels (T154, T156, T157, T165, T167, T169, T215, T218 and T247) along the Vrbnica–Bar railway line in Montenegro, with a combined length of approximately 2,921.5 metres. The works will be carried out whilst the line remains in commercial operation, in defined daily traffic intervals as set out in the Tender Documents. The Contract is co-financed by the European Investment Bank under the Western Balkans Investment Framework (WBIF) and and is governed by the FIDIC Conditions of Contract for Construction (Red Book), First Edition 1999.DoV Framework agreement Tunnel and rock protection 2026-2028
Statens vegvesenMossFrist: 14. Aug.The Norwegian Public Roads Administration Operations and Maintenance invites tenderers to a competition for the following contract work: Framework agreement for tunnel and rock protection for Trøndelag, Møre og Romsdal. The contract includes cleaning and bolting protection, establishing of new and improving existing water and frost protection in tunnels, clearing and bolt protection in cuttings, establishing different types of meshes (ice nets, erosion network etc.), improvements and establishment of new security measures in the open air on European and national roads. in Trøndelag, Møre og Romsdal. The measures will vary in extent. Outside of general processes, a couple of concrete projects are described to be carried out: TR01: E6 Kvam – clearing and work protection cutting. Modification of the existing network TR02: E6 Cleansed - clearing and work securing cutting. Assembly of an ice network. TR03: E39 Søvassdalen - clearing and work securing cutting. Assembly of an ice network. MR01:E39 Brusdalen – clearing and work securing cutting. MR03: E136 Sørnes tunnel – Rensk and securing, establishment of a new water-frost protection vault. Consideration shall be given to set timetables for public transport. Routines must be established. for emergency emergency services. All traffic deviations/driving vehicles in tunnels shall be carried out for work. passing must be clarified by the traffic conductor with work teams in the tunnel before emergency services are released. through. There will be a lot of focus on the contract work notification as the work is ongoing on the existing road network. The location of the traffic conductor shall always be risk assessed in the contractor ́s work warning plan. The contracting authority would like parallel framework agreements with up to 3 contractors per area, based on which tender is best in accordance with the award criteria.Framework agreement for the procurement of a MOM system for electro and tunnel.
Novari IKSPORSGRUNNFrist: 02. Sept.operation and maintenance) that covers the counties ́needs for the disciplines electro and tunnel. The system shall support work processes and legal requirements connected to the management of tunnels and electrical installations on the county road network, including requirements in the tunnel safety regulations.Maintenance contract, tunnels in the north
Statens vegvesenMossFrist: 17. Aug.The contract work includes maintenance work on national road tunnels in the North, Nordland, Troms and Finnmark counties. The extent of the work is mainly the closure of the recommended measures after the main geological inspection. The measures will mainly include; Rock protection in the form of rock and rock clearing, pigging and securing with shotcrete, as well as mounting bolts, handling any saws. Demolition of old water/frost protection (PE foam) with associated fastening material. Establishment of new water/frost protection and fire protection.Reconstruction of M2 Berane – tunnel “Lokve” - Rožaje
Digidentity B.V.Schenkkade 50The subject of this Contract is reconstruction of main road M-2, from Berane to Rožaje, in total length of 30.7km divided in two sections approximately of cca 15km length. Reconstruction includes reconstruction of the road, design and building of 4 existing tunnels, design and building of 1 bridge and remedial measures for 12 bridges, reconstruction/construction of 76 retaining walls.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 16. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Vestland fylkeskommune.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.