Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
Pre-feasaibility study for Onshore Power Supply (OPS) Seychelles Inter-island port facilities Seychelles
Pre-feasaibility study for Onshore Power Supply (OPS) Seychelles - Inter-island port facilities Seychelles
Tiefbauplanung, Elektroplanung, TGA-Planung, Energieberatung, Wasserwirtschaft
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- Veröffentlicht:
- 08. Juli 2026
- Frist:
- Nicht angegeben
- Thema:
- Tiefbauplanung
Ausschreibungsbeschreibung
Pre-feasaibility study for Onshore Power Supply (OPS) Seychelles - Inter-island port facilities Seychelles
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
5 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten2 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Verfahrensdaten
Freischalten4 Angaben erfasstBekanntmachungsnummer · Verfahrensart · Auftragsart · Regelungsebene
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten2 Angaben erfasstBieter und Auftragnehmer · Anschrift
Ähnliche Bekanntmachungen
8Onshore Power Supply for Cruise (OPS)
Faxaflóahafnir sf.ReykjavíkFrist: 27. JuliThe Owner intends to install two (2) Onshore Power Supply (OPS) systems, each rated at 12 MVA. Power supply from grid supply at 33 kV, output from OPS shall be 11/6.6 kV and capable of operating at 50/60 Hz. The installation will comprise two connection zones, and each zone will have three (3) connection points serving a single cruise ship. The Owner is seeking modular solution-based on up to a maximum container size of 30-foot modules stackable to a maximum height of three. The design shall consider all applicable load conditions and seismic forces that the structure may be subjected to, according to specification in this document and other applicable specifications. The OPS containers assembly will be enclosed with a structure which will be built by Other. This tender is for the OPS power transformation system, and electrical engineering for shore side connection cabinets, and the overall testing of the systems. This is better described in document “101462-010-SPE-001 technical specification”.Purchase of a high-voltage shore connection (HVSC) including an onshore power system (OPS) and a cable management system (CMS) for the supply of electrical power to cruise ships in Port of Skagen.
Skagen HavnSkagenOn shore power for cruise ships shall be established at the cruise quay Krydstogtkajen in Port of Skagen, 9990 Skagen, Denmark. For this purpose, the Contractor shall deliver a high-voltage shore connection (HVSC) including an onshore power system (OPS) and a cable management system (CMS). The HVSC shall be able to deliver up till 16 MVA of high-voltage onshore power to at least one cruise ship at a time. The Deliverables include a complete converter station and a complete cable management solution from the OPS on to the quay front. The converter station shall be a container-based solution, where all components are to be placed inside containers, except coolers that shall be placed on the ground outside the building, which the Purchaser will build around the containers. The Contractor shall be responsible for groundwork for the CMS. The Contractor shall deliver all necessary documentation and perform training of the personnel who shall operate the HVSC upon Delivery. The HVSC shall be operational by 1st of November 2027. Definitions: High-voltage Shore Connection (HVSC): includes the Onshore Power System (OPS), the Cable Management System (CMS) and the high voltage cable distribution system from the OPS to the quay front. Onshore Power System (OPS): includes all the components necessary to transform, convert and monitor the power on shore, including, but not limited to, transformers, converters, switch gear, breakers and control, monitoring, interlocking and power management systems. Cable Management System (CMS): includes all work, cables and equipment needed from the OPS to the quay front for delivering power to the ships. This includes HV shore distribution systems (from the OPS), shore-to-ship connection and interface equipment and other items necessary for delivering power to the cruise ships. Maintenance: All maintenance necessary for the proper functioning of the HVSC shall be performed by the Contractor during the warranty period. The length of the warrantyEstudios de factibilidad de proyectos de movilidad urbana sostenible en ciudades del Ecuador
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDienstleistungen zur Förderung nachhaltiger urbaner Mobilität in Ecuador durch Entwicklung bankfähiger Projekte, Schaffung innovativer Finanzierungsinstrumente und Stärkung institutioneller Kapazitäten. Fokus auf fünf städtische Mobilitäts-Konzeptprojekte in Ambato, Ibarra, Loja, Riobamba und Rumiñahui (z.B. Elektrifizierung des öffentlichen Nahverkehrs, Radverkehrsnetze, Niedrigemissionszonen, multimodale Plattformen). Der Auftragnehmer führt Machbarkeitsstudien inkl. technischem Design, Nachfragemodellierung, Kosten-Nutzen-Analyse, Finanzstrukturierung, rechtlicher und regulatorischer Analyse, Risikobewertung sowie Umwelt- und Sozialverträglichkeit durch, um die Projekte zur Finanzierungsreife zu bringen. Parallel dazu Identifizierung und Entwicklung zusätzlicher Projekte aus dem Privatsektor (z.B. Elektrifizierung von Logistikflotten, betriebliche Mobilitätspläne). Zusammenarbeit mit GIZ, Ministerium für Infrastruktur und Verkehr (MIT), Banco de Desarrollo del Ecuador (BDE), Kommunen, privaten Finanzinstituten und zivilgesellschaftlichen Akteuren.202605083 Water as Leverage India - URMP Prayagraj
Ministerie van Economische ZakenDen HaagFrist: 01. Aug.The purpose of this market consultation is to gauge interest of qualified parties to provide these technical services. This entails participating in advancing the Urban River Management Plan (URMP) Prayagraj and collaborating with Indian government actors to achieve sustainable riverfront development, applying the Water as Leverage approach. Interrelated challenges such as fluctuating water levels, silt accumulation, untreated wastewater, and limited regulatory oversight will also need to be taken into account. To be determined10023997-Technical studies on DRE- Keralam ANERT
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 17. JuliTechnische Studien zu dezentraler erneuerbarer Energie und neuen Anwendungen erneuerbarer Energien in Keralam, siehe TOR für Details10000203 II - Consultancy on Drainage Water Reuse
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 11. Aug.The objective of this assignment is to support the Ministry of Water Resources in identifying and prioritising technically, environmentally, and economically feasible options for the reuse of drainage water in the Hillah River System and to prepare a concept for two pilot projects that can serve as a demonstration for future replication. The contractor is responsible for providing the following work packages and for achieving the corresponding milestones: Work package 1: Assessment of irrigation practices and drainage-water generation The contractor is responsible for conducting a comprehensive assessment of current irrigation systems and their relationship to drainage-water generation in the Hillah River System. This includes reviewing existing irrigation methods such as surface, sprinkler, and drip irrigation including the (efficient) use of fertilizer; quantifying irrigation efficiency and related drainage-water volumes and qualities; and analysing the institutional management of irrigation operations. The contractor shall perform a scenario analysis comparing current and improved irrigation and fertilizing practices and quantify how increased irrigation efficiency and better use of fertilizer would affect the volume and quality of drainage water. The analysis shall include different scenarios for climate adaptation measures. The results shall be visualised in maps and datasets to be included in the (designed) Information System with the Hillah River Information System (Outcome Indicator). Work package 2: Identification and prioritisation of reuse options and treatment technologies GIZ shall provide the contractor with a baseline assessment identifying feasible end-uses for treated drainage water, including agricultural reuse, aquaculture, industrial applications, landscape irrigation, and groundwater recharge. The baseline assessment will also include a review of relevant international and regional experiences (e.g. Jordan, Egypt, Iran, and FAO"s WaPOR programme) and initial lessons learned applicable to the Iraqi context. The contractor shall build upon and complete the baseline assessment provided by GIZ by validating and further developing the identified drainage water reuse options relevant to the Iraqi context. This includes assessing a range of conventional treatment technologies as well as nature-based solutions (NbS) suitable for high-salinity and contaminated drainage water in arid environments, using a multi-criteria approach that considers technical feasibility, operational requirements, costs, environmental risks, and institutional capacities. Different potential options (managerial, biological, physical, non-physical) should be discussed and presented in an "option report". The contractor shall ensure that MoWR and key institutions are engaged throughout the assessment process as part of a structured capacity development approach. As part of this process, the contractor shall facilitate targeted learning and exchange activities. These include the organisation of a study tour for MoWR to visit relevant international or regional good practices, as well as an international seminar or conference in Baghdad in which international and regional actors present their experiences and discuss their applicability to the Iraqi context. The contractor shall prepare a bilingual publication summarising these experiences and the insights obtained. In addition, the contractor shall design and deliver two training courses in close cooperation with the MoWR Training Center: (i) a foundational training course on treatment technologies for drainage water reuse, covering technical principles, performance, and operational aspects; and (ii) an advanced training course focusing specifically on drainage water reuse concepts and Nature-based Solutions (NbS), including design considerations, applicability in arid environments, and integration into water management planning. The consultant together with the GIZ team will support the MoWR in identifying 2 pilot projects to be implemented in the Hilla River area. Work package 3: Preparation of pilot project concepts Building on the findings of the previous work packages, the contractor shall support the development of a pre-fesibility (PFS) and a definitive feasibility study (DFS) for two pilot demonstration solutions. This task includes together with the GIZ team and the counterpart identifying suitable pilot locations based on hydrological, land-use, and environmental criteria; proposing a treatment and reuse scheme; and estimating costs and requirements, and potential financing options. The contractor shall analyze the financing criteria, eligibility requirements, and procedural steps of BMZ and EU co-financing instruments relevant to the implementation of pilot projects on drainage water reuse. Based on this analysis, the contractor shall develop and assess two distinct pilot project options: - a small-scale pilot project designed to comply with BMZ funding criteria, with an indicative financing volume of up to EUR 1 million (up to feasibility level); and - a larger-scale pilot project designed to comply with EU financing criteria, with an indicative financing volume of up to EUR 25 million (up to pre-feasibility level). For the implementation of these tasks, the tenderer is required to provide 4 core experts (1 team leader and 3 technical experts with a total of 330 expert days).Technische Studien zu dezentraler erneuerbarer Energie (DRE) und aufkommenden Anwendungen in Kerala
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 17. JuliTechnical studies on Decentralized Renewable Energy & Emerging RE Applications in Keralam. Scope: see TOR.Development and Implementation of a Water Allocation Model in the Hillah River System, Iraq
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 20. Aug.Art der Leistung Das Beratungsprojekt soll die Wasserressourcenplanung und -verteilung im Hillah-Flusssystem verbessern. Durch präzisere Daten und den Einsatz des aktuellen Ribasim-Modells (Version 2026) sollen Entscheidungsprozesse des irakischen Wasserministeriums (MoWR) optimiert und Wissenslücken geschlossen werden. Umfang der Leistung Training & Kapazitätsaufbau Konzeption: Entwicklung eines maßgeschneiderten Lehrplans für das Ribasim-Modell (inklusive Niederschlags-Abfluss-Modellen und der Erstellung eines kalibrierten Modell-Grundgerüsts für das Hillah-System). Durchführung: Organisation und Leitung eines 5-tägigen Praxis-Workshops für das Ministerium (MoWR) und lokale Partner. Arbeitspaket 2: Unterstützung bei der Ergebnisanalyse Hilfestellung für das MoWR-Personal bei der Auswertung und Interpretation der Modellergebnisse. Erstellung des abschließenden technischen Berichts (inkl. Szenarienanalysen und Hauptergebnissen). Arbeitspaket 3: Laufender technischer Support
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.