Neu: Marktberichte zur öffentlichen Vergabe in Deutschland Bericht ansehen

Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojTED

Design and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)

The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank...

Angebotsfrist: 14. Oktober 2026Typ: Ausschreibung

Ingenieurbauwerke, Elektroinstallation, Spezialtiefbau, Rohbauarbeiten, Gleisbau

Dokumente kostenlos freischalten

Ohne Kreditkarte · Sofortiger Zugang

Inhalt auf einen Blick

Ausschreibungstyp:
Ausschreibung
Auftraggeber:
Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska
Veröffentlicht:
20. August 2026
Frist:
14. Oktober 2026
Thema:
Ingenieurbauwerke
Bauobjekt:
Bahngleis / Schienenstrecke

Bauobjekt-Klassifikation

  • Bahngleis / SchienenstreckeHauptobjekt

Ausschreibungsbeschreibung

Vollständige Beschreibung anzeigen

The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank, the Asian Development Bank, the European Bank for Reconstruction and Development, the Islamic Development Bank, and the OPEC Fund for International Development. The Project will finance the construction of a 127 km greenfield railway line designed to bypass the Istanbul Metropolitan Area and establish a high-capacity overland link across the Istanbul Strait (Bosphorus). The line will be double-tracked, electrified, fully signalized, and mixed-use, capable of carrying both passengers and freight, with a maximum freight carrying capacity of 50 million tons per year. The proposed railway line will originate at Çayrova station on the Asian side and terminate at Çatalca station on the European side, crossing the Istanbul Strait by utilizing the existing track space allocated on the Yavuz Sultan Selim Bridge (YSS Bridge), also known as the Third Bosphorus Bridge, located at the northern end of the Istanbul Strait. The Ministry intends to apply a portion of the loan proceeds toward payments under the contract(s) for the "Design and Construction of Infrastructure and Superstructure Works, including Electrification" subdivided into four Lots as listed below. The scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian Tunneling Method (NATM) tunnels totaling 23.3 km, 17 cut-and-cover tunnels totaling 3.7 km, two viaducts and 40 bridges totaling 22.1 km, Stations, etc. The scope of works covered under each lot is specified in the RFP document. The Telecommunication and Signalling Works are not included in this procurement package and will tendered separately. The Ministry now invites sealed Proposals from eligible Proposers for the Design and Construction of Infrastructure & Superstructure Works including Electrification subdivided into the four lots below. Proposers may submit Proposal for one or more lot(s): Lot 1 — Construction and Electrification Works for the Çayrova – Sabiha Gökçen Airport – Kurtdomu Corridor (28,49 km); Lot 2 — Construction and Electrification Works for the Kurtdomu – Alibahadr Corridor (25,76 km); Lot 3 — Construction and Electrification Works for the Alibahadr – YSS Bridge – Mithatpaa Corridor (32,14 km); Lot 4 — Construction and Electrification Works for the Mithatpaa – stanbul Airport – Çatalca Corridor (39,49 km).

Weiterführende Details

Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.

  • Kernanforderungen der Ausschreibung priorisiert aufbereitet
  • Fristen, Eignungskriterien und Unterlagen in einem Ablauf
  • Hinweise zur strukturierten Angebotsvorbereitung
  • Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos freischalten

30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar

Alle Vergabedetails

Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.

6 Datenbereiche verfügbar

30 Tage kostenlos freischalten

30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar

Ähnliche Bekanntmachungen

10

Häufige Fragen zu dieser Ausschreibung

Wie kann ich mich auf diese Ausschreibung bewerben?
Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
Bis wann läuft die Angebotsfrist?
Die Angebotsfrist endet am 14. Oktober 2026.
Wer ist der Auftraggeber?
Der Auftraggeber ist Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska.
Welche Unterlagen sind für den Start relevant?
In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.
1.200+ Unternehmen10.000+ aktive AusschreibungenDSGVO-konforme Plattform

Nächster Schritt

Vollzugang für diese ausschreibung sichern

Erhalten Sie alle Dokumente zu "Design and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)" von Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska und behalten Sie Fristen und Einreichungshinweise im Blick.

Frist im Blick bis 14. Oktober 2026Ohne Kreditkarte startbar