City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland)BelgradeTED
Supervision of Works on Construction of Sewerage Network Phase II in the Municipality of Nikšić
*Short description: Scope of procurement is provision of supervision of works on sewerage network. Indicative scope of Works, which will be implemented in accordance to the FIDIC Conditions of Contract (Red Book – ed 1999), include: • Construction of a wastewater network for four settlements located at the North of the City centre (Dragov...
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland)
- Veröffentlicht:
- 11. August 2026
- Frist:
- Nicht angegeben
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
*Short description: Scope of procurement is provision of supervision of works on sewerage network. Indicative scope of Works, which will be implemented in accordance to the FIDIC Conditions of Contract (Red Book – ed 1999), include: • Construction of a wastewater network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža) for collection and transportation of the wastewater to WWTP. The total length of the network is app 41 km and consists of the PE pipes of following diameters and concrete manholes: • DN 300 mm, L=1,960 m - The main collector crosses the Bistrica River via an existing bridge. • DN 250 mm, L=3,750 m • DN 200 mm, L=30,510 m • House connections, DN 200 mm, L=5,000 m • Manholes, total 3,600 pcs • Construction of a new sewerage pumping station called "Cemenca" (Q=50 l/s; H=9 m, P=5 kW), and a pressure line diameter of DN200 mm with a length of 165 m. • Rehabilitation of the existing pumping station "Duklo (Q=72 l/s; P=30 kW). As major part of the rehabilitation efforts, the existing manual screen will be replaced with an automated one. The supervision of Works shall be implemented in compliance with the requirements of the Montenegrin legislation and relevant EU and EIB requirements. The Consultant must particularly consider licensing and permits requirements in the Law on Construction of Structures in Montenegro in force.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten6 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Supervision of Works for Improvement of the Water Supply System in the Old Royal Capital Cetinje, Montenegro
City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland)BelgradeIndicative scope of Works on the project “Supervision of Works for Improvement of the Water Supply System in the Old Royal Capital Cetinje, Montenegro” includes the following elements: • Construction of transmission and distribution mains of diameter DN32 to DN400, with approximate length of 92 km (to be implemented within 5 phases), incl. including house connections and installation of flow meters • Construction of the new reservoir Sandin vrh 1 and booster station Sandin vrh 2 (6th phase) • Reconstruction of the existing water supply network • Reconstruction of the transmission main from BC Lašor to the reservoir Zagrablje • Reconstruction of the pumping station Višnjica and the breaking chamber Velja Gora Works will be implemented according to FIDIC Red Book (1999 ed). The supervision of Works shall be implemented in compliance with the requirements of the Montenegrin legislation and relevant EU requirements. The Consultant must particularly consider licensing and permits requirements in the Law on Construction of Structures in Montenegro in force.Connection of Vinica to WWTP Kocani, including partial rehabilitation and extension of sewarage and stormwater systems in the Municipality of Vinica
Government of North MacedoniaMinistry of Finance, Central Financing and Contracting Department (CFCD)SkopjeFrist: 17. Sept.-Construction of 18km collectors, energy efficient pumping station to connect approx 15,000 PE/ secondary sewerage networks to WWTP Kocani -Partial rehabilitation of 3,700m secondary sewerage network and extension of 3,600m stormwater network in Vinica -Construction of new outlet at WWTP Kocani (1,300m) Works of the sewerage network will be implemented under FIDIC conditions of contract ("Red Book, 1999 edition")Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines
KD VODOVOD I KANALIZACIJA d. o. o.RijekaFrist: 01. Sept.Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines
KD VODOVOD I KANALIZACIJA d. o. o.RijekaFrist: 31. Aug.Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Supervision of the Works for the reconstruction and expansion of Serbian port of Bogojevo
Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojFrist: 15. Sept.Supervision services according to the FIDIC (The International Federation of Consulting Engineers) Contract Conditions (the FIDIC Engineer) and relevant national legislation for the reconstruction of the existing port area and quay of approx. 16 ha and 167 m respectively, and construction of a new part of the port terminal for bulk and general cargo of an area of approx. 30 ha and a quay length of approx. 230 m, as upstream extension of the existing port area. The Works to be supervised also include the access road and port infrastructure and utilities (e.g. internal roads and railways, sewerage, water, power supply). The existing port facilities shall be operational during the Works. The Contract will be managed according to the FIDIC Conditions of Contract for Construction for building and engineering works designed by Employer (FIDIC RED Book, First Edition 1999).Wastewater collection and treatment investment project in the Municipality of Stip
Government of North MacedoniaMinistry of Finance, Central Financing and Contracting Department (CFCD)SkopjeFrist: 17. Sept.LOT 1: Design and construction of WWTP for 50,000 PE, with secondary treatment and Ph removal. Works will be implemented following FIDIC conditions of contract ("Yellow Book", 1999 edition) LOT 2: -Rehabilitation/replacement/reconstruction of approx 33 km network -Construction of 4 pumping stations -Procurement of sewer water cleaning equipment Works will be implemented following FIDIC conditions of contract ("Red Book", 1999 edition)Reconstruction of the Sanitary Sewer System of Kutaisi
LVL technologies GmbH & Co KGCrailsheimLot 1: KWWP Construction of Sewer System Phase 1/01: Construction of wastewater collection gravity lines with a length of 79.94 km and 3500 house connections; Lot 2: KWWP Construction of Sewer System Phase 1/02: Construction of wastewater collection gravity lines of 61.97 km and 6.67 km pressure lines, two pumping stations in the capacity of (1) Q=1.75 l/s, H=41m, and (2) Q=20l/s, H=47m, and 3300 house connections.Rehabilitation of water supply pipelines; construction of the Skrad public sewer system
KD VODOVOD I KANALIZACIJA d. o. o.RijekaFrist: 31. Aug.The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Rehabilitation of water supply pipelines; construction of the Skrad public sewer system
KD VODOVOD I KANALIZACIJA d. o. o.RijekaFrist: 01. Sept.The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.2026/23674 WATER AND SEWAGE JENSVOLL, BODØ KOMMMUNE
Bodø KommuneBODØFrist: 24. Sept.The tender includes the design and construction of rehabilitation and renewal works for the water and wastewater infrastructure in Bodø Municipality, between Sørstrupen and the Jensvoll wastewater treatment plant/pumping station, with a total length of approximately 1,800 metres, of which approximately 400 metres are included as an option. The tender requires a lump-sum (fixed-price) offer for both the design and implementation of the project.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.