Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojTED
Supervision of the Works for the reconstruction and expansion of Serbian port of Bogojevo
Supervision services according to the FIDIC (The International Federation of Consulting Engineers) Contract Conditions (the FIDIC Engineer) and relevant national legislation for the reconstruction of the existing port area and quay of approx. 16 ha and 167 m respectively, and construction of a new part of the port terminal for bulk and ge...
Tiefbauplanung, TGA-Planung, Bauüberwachung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska
- Veröffentlicht:
- 30. Juli 2026
- Frist:
- 15. September 2026
- Thema:
- Tiefbauplanung
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
Supervision services according to the FIDIC (The International Federation of Consulting Engineers) Contract Conditions (the FIDIC Engineer) and relevant national legislation for the reconstruction of the existing port area and quay of approx. 16 ha and 167 m respectively, and construction of a new part of the port terminal for bulk and general cargo of an area of approx. 30 ha and a quay length of approx. 230 m, as upstream extension of the existing port area. The Works to be supervised also include the access road and port infrastructure and utilities (e.g. internal roads and railways, sewerage, water, power supply). The existing port facilities shall be operational during the Works. The Contract will be managed according to the FIDIC Conditions of Contract for Construction for building and engineering works designed by Employer (FIDIC RED Book, First Edition 1999).
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten6 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Connection of Vinica to WWTP Kocani, including partial rehabilitation and extension of sewarage and stormwater systems in the Municipality of Vinica
Government of North MacedoniaMinistry of Finance, Central Financing and Contracting Department (CFCD)SkopjeFrist: 17. Sept.-Construction of 18km collectors, energy efficient pumping station to connect approx 15,000 PE/ secondary sewerage networks to WWTP Kocani -Partial rehabilitation of 3,700m secondary sewerage network and extension of 3,600m stormwater network in Vinica -Construction of new outlet at WWTP Kocani (1,300m) Works of the sewerage network will be implemented under FIDIC conditions of contract ("Red Book, 1999 edition")Wastewater collection and treatment investment project in the Municipality of Stip
Government of North MacedoniaMinistry of Finance, Central Financing and Contracting Department (CFCD)SkopjeFrist: 17. Sept.LOT 1: Design and construction of WWTP for 50,000 PE, with secondary treatment and Ph removal. Works will be implemented following FIDIC conditions of contract ("Yellow Book", 1999 edition) LOT 2: -Rehabilitation/replacement/reconstruction of approx 33 km network -Construction of 4 pumping stations -Procurement of sewer water cleaning equipment Works will be implemented following FIDIC conditions of contract ("Red Book", 1999 edition)Reconstruction of M2 Berane – tunnel “Lokve” - Rožaje
Digidentity B.V.Schenkkade 50The subject of this Contract is reconstruction of main road M-2, from Berane to Rožaje, in total length of 30.7km divided in two sections approximately of cca 15km length. Reconstruction includes reconstruction of the road, design and building of 4 existing tunnels, design and building of 1 bridge and remedial measures for 12 bridges, reconstruction/construction of 76 retaining walls.Consulting Services for Supervision of rehabilitation works under Rehabilitation of M5 Border with Ukraine - Criva - Balti - Chisinau - Tiraspol- Border with Ukraine Road, km 103+750 - km 133+000
S.A. “Administratia Nationala a Drumurilor” (National Roads Administration)ChisinauFrist: 27. JuliThe “Consultant” will be required to undertake the role of the “Engineer” as defined in the Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (“Red book”) Second edition 2017, reprinted 2022 with Amendments” published by the Federation Internationale Des Ingenieurs – Conseils (FIDIC), called “FIDIC” in this document from hereon. The Services to be provided by the Consultant will last about 64 months, which includes 1 month for pre-Commencement activities, 36 months of works supervision, 24 months covering Defects Notification Period and 3 months for project closure tasks including the Performance Certificate Final Certificate and other required tasks.Consulting Services for Supervision of rehabilitation works under Rehabilitation of M5 Border with Ukraine - Criva - Balti - Chisinau - Tiraspol- Border with Ukraine Road, km 103+750 - km 133+000
S.A. “Administratia Nationala a Drumurilor” (National Roads Administration)ChisinauFrist: 20. Aug.The “Consultant” will be required to undertake the role of the “Engineer” as defined in the Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (“Red book”) Second edition 2017, reprinted 2022 with Amendments” published by the Federation Internationale Des Ingenieurs – Conseils (FIDIC), called “FIDIC” in this document from hereon. The Services to be provided by the Consultant will last about 64 months, which includes 1 month for pre-Commencement activities, 36 months of works supervision, 24 months covering Defects Notification Period and 3 months for project closure tasks including the Performance Certificate Final Certificate and other required tasks.Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project
Serbian Railway Infrastructure JSCBelgradeFrist: 24. Sept.The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract for Subsection 3.2 has been signed as Lot 2; following the termination of the Lot 1 Works Contract, the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment. The installation of ERTMS is planned under a third Works Contract; ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services. The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract financed project shall not violate or have violated any intellectual property rights. A services provider or providers will be selected in accordance with the EIB Guide to Procurement of July 2024.Road and Path Reconstruction and ancillary works, Ashtown Demesne, Phoenix Park, Dublin 8.
Office of Public Works (OPW)TrimThe Works require the removal and disposal of existing road structure and pedestrians paths, new road and pedestrian path construction, new granite channel kerbing installation, taking up and storing on site (OPW compound) existing granite setts, and ancillary works to Ashtown Demesne, Phoenix Park, Dublin 8.Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project
Serbian Railway Infrastructure JSCBelgradeFrist: 24. Sept.The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract for Subsection 3.2 has been signed as Lot 2; following the termination of the Lot 1 Works Contract, the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment. The installation of ERTMS is planned under a third Works Contract; ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services. The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract financed project shall not violate or have violated any intellectual property rights. A services provider or providers will be selected in accordance with the EIB Guide to Procurement of July 2024.Provision of design and supervision services for the reconstruction works of kindergarten in Zabjelo, Podgorica, Kotor and Momisici, Podgorica.
Ministry of Education, Science and InnovationPodgoricaFrist: 07. Sept.The Borrower, Montenegro, represented by the Minister of Finance on behalf of the Government, has applied for and obtained financing from the European Investment Bank (EIB) under the following agreements: Contract Number (Fl N°) 89406 and Contract Number (Fl N°) 99442 Each contract provides a loan of up to EUR 18,000,000. The Borrower intends to allocate a portion of these funds to eligible payments under the contract(s) for which this Contract Notice is issued. Additional funding will be provided by the WBIF grant. The procurement procedure will be conducted in accordance with the EIB Guide to Procurement (GtP) for projects financed by the EIB. The guide is available at: https://www.eib.org/en/publications/20240132-guide-to-procurement-for-projects-financed-by-the-eib The purpose of this tender is procurement of supervision services on reconstruction of kindergarten in Zabjelo, Municipality of Podgorica. The Consultant must meet specific Qualification Criteria demonstrating: • Legal Capability • Financial Capability • Experience and Technical Capacity Detailed requirements are provided in the tender document. Firms from all countries are eligible to submit tenders for service contracts. However, individuals or firms may be excluded in accordance with GtP Section 1.4 on Ethical Conduct. Additional information: • Alternative proposals will not be considered. • Joint ventures (JV) may include a maximum of three (3) members. • Proposals must be submitted in physical form; electronic submissions will not be accepted. Total available budget for this assignment is as follows: Contract estimate excluding VAT for Lot 1: EUR 189,201.00 The bid price (excluding VAT) exceeding the contract estimates given above will be rejected.Entrance Road Reconstruction and Ancillary Works, Whitefields Depot, Phoenix Park
Office of Public Works (OPW)TrimThe Works involve the removal and disposal of the existing road structure, with reuse of bitumen material on site, construction of a new road surface, new concrete kerbing, and of ancillary improvements, including the refurbishment and relaying of dilapidated cast iron toe rails, taking up and relaying of granite thresholds at the entrance gate, and the taking up and relaying of cobble kerb lines along designated sections of roadway on the Entrance Road serving Whitefields Depot within Phoenix Park, Dublin 8. Whitefields entrance road works to occur out of hours on weekends to facilitate the continued operational use of the OPW Whitefields compound during normal daily work hours. Pricing, programme and traffic management plan are to reflect this.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 15. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.