University College CorkCorkTED
Appointment of an Integrated Design Team for UCC Outdoor Sports Facilities - Phase 1
This competition relates to the appointment of an Integrated Design Team for UCC Outdoor Sports Facilities Phase 1. The design team will be procured via an integrated design team approach, with the Civil and Structural Engineer acting as the integrated design team lead. The principal service providers required to form part of the integrat...
Architektur, Tiefbauplanung, Elektroplanung, TGA-Planung, SiGeKo
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- University College Cork
- Veröffentlicht:
- 26. Mai 2026
- Frist:
- Nicht angegeben
- Thema:
- Architektur
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
This competition relates to the appointment of an Integrated Design Team for UCC Outdoor Sports Facilities Phase 1. The design team will be procured via an integrated design team approach, with the Civil and Structural Engineer acting as the integrated design team lead. The principal service providers required to form part of the integrated team are • Civil and Structural Engineering Services (CSE) • Architectural Services (AS). • Mechanical and Electrical Engineering Services (MEP). • Project Supervisor Design Process (PSDP). The first phase to be delivered under the developed master plan is to include the following works. • Mardyke Sports Grounds Facility o The resurfacing of the existing synthetic hockey pitch such that it will be converted into a recreational sporting facility, that can be sub-divided by netting. o New changing rooms adjacent the GAA pitch (circa 300m2) o New boat storage area (90m2) o Upgrading of the existing Floodlight lamp heads to LED. • Proposed UCC Sports Park o 2 synthetic soccer pitches, complete with floodlighting and perimeter fence, o 1 synthetic GAA pitch, complete with floodlighting, ball stop netting and perimeter fence, o 2 new water based synthetic hockey pitches, complete with floodlighting and perimeter fence, o Standalone equipment (90m2) and maintenance stores area (90m2), o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2) o All associated site infrastructure, including roads, paths, parking, drainage utilities, biodiversity spaces etc. • The Curraheen Sports Grounds (The Farm). o Installation of new LED floodlights to three pitches, o Upgrading of the existing Floodlight lamp heads to LED to three pitches; and o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2)
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9Quantity Surveying Services for UCC Outdoor Sports Facility Phase 1
University College CorkCorkThis Tender is to procure Quantity Surveying Services, with a carbon co-ordinator as specialist skills provider. The successful supplier shall form part of an overall design team for which UCC is separately seeking the services of integrated design team which is part of a separate competition. The successful supplier will be required to assist the Integrated Design Team in developing a masterplan for the upgrading of facilities at the Mardyke Sports Grounds, fully developing the proposed UCC Sports Park and undertaking minor improvements to the Curraheen Sports Grounds (The Farm) in the short-term. In tandem to developing the overall masterplan, the successful supplier will be required to deliver full services (stages 2 - 5) for the first phase of development comprising of • Mardyke Sports Grounds Facility o The resurfacing of the existing synthetic hockey pitch such that it will be converted into a recreational sporting facility, that can be sub-divided by netting. o New changing rooms adjacent the GAA pitch (circa 300m2) o New boat storage area (90m2) o Upgrading of the existing Floodlight lamp heads to LED. • Proposed UCC Sports Park o 2 synthetic soccer pitches, complete with floodlighting and perimeter fence, o 1 synthetic GAA pitch, complete with floodlighting, ball stop netting and perimeter fence, o 2 new water based synthetic hockey pitches, complete with floodlighting and perimeter fence, o Standalone equipment store (90m2) and maintenance stores area (90m2), o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2) o All associated site infrastructure, including roads, paths, parking, drainage utilities, biodiversity spaces etc. • The Curraheen Sports Grounds (The Farm). o Installation of new LED floodlights to three pitches, o Upgrading of the existing Floodlight lamp heads to LED to three pitches; and o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2)Integrated Design Team service for development of grass pitch and spectator stand for CLG Ghaoth Dobhair
CLG GhaothDobhairDerrybegFrist: 10. JuliIntegrated Design Team service for the design, contractor procurement, construction management and supervision, and certification for the development of a new grass based pitch and spectator stand at the club’s existing facility at Machaire Gáthlan, Doirebeaga, Co. Dhún Na nGall. F92P866PIN for Establishment of a multi-party Integrated Design Team Framework
Trinity College Dublin the University of Dublin_336DublinFrist: 22. JuliProvision of a multi-party Integrated Design Team Framework Trinity College Dublin (“Trinity” / “TCD”) Capital Programmes Office has a need to establish an Integrated Design Team (“IDT”) Framework Panel (the “Framework” / “Panel”) to support the organisation’s capital works programme. The Framework adopts a multi-disciplinary model in which one Principal Service Provider (“PSP”) shall be nominated as Lead Consultant for each Call-Off, assuming responsibility for coordination and delivery of the Integrated Design Team. The Framework will provide a compliant, efficient, and high quality mechanism for appointing multi-disciplinary design teams across multiple projects over a defined period. It will ensure consistency of design quality, value for money, and adherence to procurement regulations. The Framework shall operate within the scope of the Capital Works Management Frameworks (“CWMF”) and National and EU procurement regulations.Integrated Design Team for childcare building at Baile Ghib (Gibbstown), Co. na Mí
Atlantic Technological UniversityLetterkennyFrist: 13. JuliNaíonra Bhaile Ghib wish to appoint an Integrated Design Team service for the design, contractor procurement, construction management and supervision, and certification of a new naíonra (pre-school facility) for Naíonra Bhaile Ghib, Halla Bhaile Ghib, An Uaimh, Co, na Mí . Eircode: C15 VK499Appointment of an Integrated Design Team service for the detailed design, procurement, supervision, construction management and certification for the Refurbishment of Ballyragget Community Hall
Ballyragget Enterprise and Community Hub CLGKilkennyFrist: 19. JuniDesign Team service for the upgrade and refurbishment of Ballyragget Community Hall, Bridge Street, Ballyragget, Co. Kilkenny.Procurement of Integrated Design Team Services for the Development of Donegal Green Lab
Donegal County Council_1193LiffordFrist: 02. JuniDonegal County Council on behalf of Donegal Green Lab is seeking an Integrated Design Team for a new three-storey 19,800 sq ft facility providing enterprise, incubation, training, laboratory, collaboration space, parking, and associated site works.Tender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare
Clare County CouncilEnnisFrist: 02. JuniTender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare.Establishment of a Single Supplier Framework of MEP Led Design Team for Small and Minor Work Process Projects at Tyndall National Institute, UCC
University College CorkCorkThis Tender is to establish a Single Supplier Framework of MEP Led Design Team for Small and Minor Process Works Projects at Tyndall National Institute, UCC to whom specific tasks will be awarded on an exclusive basis based on the terms of a framework agreement, a copy of which will be issued with the tender documents. The team will comprise the following services. • Mechanical, Electrical and Process Engineering Services (MEP); • Employers Representative • Project Supervisor Design Process The Framework Agreement will be established on foot of competitive tenders received for the above services based on Notional Hours and rates for various disciplines as detailed in the Pricing Document Typically, projects will range in construction value from €5k to €3M however there may be exceptions whereby the construction value may be outside this range. The following are the higher value projects scheduled for coming years that the MEP Led Design Team may be assigned to: • Silicon Fab - Block A Scrubber Replacement • Silicon Fab - Old Training Fab conversion to Cleanroom • Silicon Fab - Refurbishment including demolition of room in subfab • Block C and Silicon Fab - Process Tool Hook Up • Old Boiler house Upgrade including Gas Stores • Waste Water TreatmentMulti-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots
Údarás Na Gaeltachta_289GalwayEstablishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally comprise of the following disciplines: - Architectural Services (lead for Architect Led IDT Services) and associated specialist skills, - Civil and Structural Engineering Services (lead for Engineering Led IDT Services) and associated specialist skills, - Building Services (Mechanical and Electrical) Engineering Services and - Quantity Surveying Services. The extent of other consultancy services and specialist skills service providers required for call-off commissions throughout the course of a Framework may vary depending on the range of services required. Call-off commissions may typically range from extension, refurbishment, repair, upgrade, new build, infrastructure and other type projects as required by the Contracting Authority within Gaeltacht regions. Scope of design services may extend from initial feasibility, through statutory approvals, full design to implementation and handover/close-out, and other technical services as may be required over the framework term. Each framework will be established for a period of three (3) years with the option to extend by one further year. Please refer to the enclosed documents for further particulars and requirements. A Prior Information Notice (PIN) was issued in respect of the above, reference: OJ S 94/2024 15/05/2024.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist University College Cork.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.