CLG GhaothDobhairDerrybegTED
Integrated Design Team service for development of grass pitch and spectator stand for CLG Ghaoth Dobhair
Integrated Design Team service for the design, contractor procurement, construction management and supervision, and certification for the development of a new grass based pitch and spectator stand at the club’s existing facility at Machaire Gáthlan, Doirebeaga, Co. Dhún Na nGall. F92P866
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- CLG GhaothDobhair
- Veröffentlicht:
- 15. Juni 2026
- Frist:
- 10. Juli 2026
Ausschreibungsbeschreibung
Integrated Design Team service for the design, contractor procurement, construction management and supervision, and certification for the development of a new grass based pitch and spectator stand at the club’s existing facility at Machaire Gáthlan, Doirebeaga, Co. Dhún Na nGall. F92P866
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten49 Angaben erfasstUnterlagen
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10132-BYM-2025 Purchase and assembly of artificial grass for five artificial grass pitches
Oslo kommune, BymiljøetatenOsloOslo municipality shall purchase and assemble artificial grass for five artificial grass pitches: Haraløkka 2, Prinsdal 11er, Prinsdal 7er, Nordstrand 11er, and Tveita 7er. The procurement is part of a renovation plan to ensure good quality and increase capacity of existing surfaces.Establishment of a Single Party Framework Agreement for the Provision of Architect-Led Integrated Design Team Services for Public Realm, Regeneration and Building Projects
Tipperary County CouncilClonmel, NenaghFrist: 25. JuniSingle Party Framework Agreement for Architect-Led Integrated Design Team Services for public realm, regeneration and building projects. Initial project: Transformational Regeneration of Roscrea Town Centre including public realm enhancement and a multi-use community facility at the former Walsh Printers (Stages 0 to 2b).Tender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare
Clare County CouncilEnnisFrist: 05. JuniTender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare.PIN for Establishment of a multi-party Integrated Design Team Framework
Trinity College Dublin the University of Dublin_336DublinFrist: 22. JuliProvision of a multi-party Integrated Design Team Framework Trinity College Dublin (“Trinity” / “TCD”) Capital Programmes Office has a need to establish an Integrated Design Team (“IDT”) Framework Panel (the “Framework” / “Panel”) to support the organisation’s capital works programme. The Framework adopts a multi-disciplinary model in which one Principal Service Provider (“PSP”) shall be nominated as Lead Consultant for each Call-Off, assuming responsibility for coordination and delivery of the Integrated Design Team. The Framework will provide a compliant, efficient, and high quality mechanism for appointing multi-disciplinary design teams across multiple projects over a defined period. It will ensure consistency of design quality, value for money, and adherence to procurement regulations. The Framework shall operate within the scope of the Capital Works Management Frameworks (“CWMF”) and National and EU procurement regulations.Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services for Road Infrastructure and associated services at IDA Ballina
IDA IrelandDublinThe Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Planner, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover.Appointment of an Integrated Design Team for UCC Outdoor Sports Facilities - Phase 1
University College CorkCorkThis competition relates to the appointment of an Integrated Design Team for UCC Outdoor Sports Facilities Phase 1. The design team will be procured via an integrated design team approach, with the Civil and Structural Engineer acting as the integrated design team lead. The principal service providers required to form part of the integrated team are • Civil and Structural Engineering Services (CSE) • Architectural Services (AS). • Mechanical and Electrical Engineering Services (MEP). • Project Supervisor Design Process (PSDP). The first phase to be delivered under the developed master plan is to include the following works. • Mardyke Sports Grounds Facility o The resurfacing of the existing synthetic hockey pitch such that it will be converted into a recreational sporting facility, that can be sub-divided by netting. o New changing rooms adjacent the GAA pitch (circa 300m2) o New boat storage area (90m2) o Upgrading of the existing Floodlight lamp heads to LED. • Proposed UCC Sports Park o 2 synthetic soccer pitches, complete with floodlighting and perimeter fence, o 1 synthetic GAA pitch, complete with floodlighting, ball stop netting and perimeter fence, o 2 new water based synthetic hockey pitches, complete with floodlighting and perimeter fence, o Standalone equipment (90m2) and maintenance stores area (90m2), o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2) o All associated site infrastructure, including roads, paths, parking, drainage utilities, biodiversity spaces etc. • The Curraheen Sports Grounds (The Farm). o Installation of new LED floodlights to three pitches, o Upgrading of the existing Floodlight lamp heads to LED to three pitches; and o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2)FCC/120/19 Multiparty framework for Architect led Integrated Conservation Design Team Services with initial projects
Fingal County Council_371DublinEstablish a multiparty framework for Architect led Integrated Conservation Design Team Services related to heritage buildings, monuments, buildings, structures and landscapes including public buildings within the County. The initial commission will be for condition reporting, feasibility, design, planning and management of heritage related works at three sites; 1)Bremore Castle, 2)Skerries Mills 3) The Seamus Ennis Arts Centre The Multi Party Framework will be made available for use by Dun Laoghaire Rathdown County Council, South Dublin County Council, Dublin City Council and Wicklow County Council also.Appointment of an Integrated Design Team service for the detailed design, procurement, supervision, construction management and certification for the Refurbishment of Ballyragget Community Hall
Ballyragget Enterprise and Community Hub CLGKilkennyFrist: 19. JuniDesign Team service for the upgrade and refurbishment of Ballyragget Community Hall, Bridge Street, Ballyragget, Co. Kilkenny.Multi-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots
Údarás Na Gaeltachta_289GalwayEstablishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally comprise of the following disciplines: - Architectural Services (lead for Architect Led IDT Services) and associated specialist skills, - Civil and Structural Engineering Services (lead for Engineering Led IDT Services) and associated specialist skills, - Building Services (Mechanical and Electrical) Engineering Services and - Quantity Surveying Services. The extent of other consultancy services and specialist skills service providers required for call-off commissions throughout the course of a Framework may vary depending on the range of services required. Call-off commissions may typically range from extension, refurbishment, repair, upgrade, new build, infrastructure and other type projects as required by the Contracting Authority within Gaeltacht regions. Scope of design services may extend from initial feasibility, through statutory approvals, full design to implementation and handover/close-out, and other technical services as may be required over the framework term. Each framework will be established for a period of three (3) years with the option to extend by one further year. Please refer to the enclosed documents for further particulars and requirements. A Prior Information Notice (PIN) was issued in respect of the above, reference: OJ S 94/2024 15/05/2024.Engineer Led Integrated Design Team Consultancy Services for three (3) Aircraft Hangar Projects at Casement Aerodrome, Baldonnel, Co. Dublin
Department of Further and Higher Education Research Innovation and ScienceDublinEngineer Led Integrated Design Team Consultancy Services for three (3) Aircraft Hangar Projects at Casement Aerodrome, Baldonnel, Co. Dublin
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 10. Juli 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist CLG GhaothDobhair.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.