Fingal County Council_371DublinTED
FCC/120/19 Multiparty framework for Architect led Integrated Conservation Design Team Services with initial projects
Establish a multiparty framework for Architect led Integrated Conservation Design Team Services related to heritage buildings, monuments, buildings, structures and landscapes including public buildings within the County. The initial commission will be for condition reporting, feasibility, design, planning and management of heritage relate...
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Fingal County Council_371
- Veröffentlicht:
- 16. Juni 2026
- Frist:
- Nicht angegeben
Ausschreibungsbeschreibung
Establish a multiparty framework for Architect led Integrated Conservation Design Team Services related to heritage buildings, monuments, buildings, structures and landscapes including public buildings within the County. The initial commission will be for condition reporting, feasibility, design, planning and management of heritage related works at three sites; 1)Bremore Castle, 2)Skerries Mills 3) The Seamus Ennis Arts Centre The Multi Party Framework will be made available for use by Dun Laoghaire Rathdown County Council, South Dublin County Council, Dublin City Council and Wicklow County Council also.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten15 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Multi-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots
Údarás Na Gaeltachta_289GalwayEstablishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally comprise of the following disciplines: - Architectural Services (lead for Architect Led IDT Services) and associated specialist skills, - Civil and Structural Engineering Services (lead for Engineering Led IDT Services) and associated specialist skills, - Building Services (Mechanical and Electrical) Engineering Services and - Quantity Surveying Services. The extent of other consultancy services and specialist skills service providers required for call-off commissions throughout the course of a Framework may vary depending on the range of services required. Call-off commissions may typically range from extension, refurbishment, repair, upgrade, new build, infrastructure and other type projects as required by the Contracting Authority within Gaeltacht regions. Scope of design services may extend from initial feasibility, through statutory approvals, full design to implementation and handover/close-out, and other technical services as may be required over the framework term. Each framework will be established for a period of three (3) years with the option to extend by one further year. Please refer to the enclosed documents for further particulars and requirements. A Prior Information Notice (PIN) was issued in respect of the above, reference: OJ S 94/2024 15/05/2024.FCC/372/23 - Single Party Framework for the design, installation, operation and maintenance of rooftop Solar PV within Fingal County Council's Administrative Area with an Initial for three (3) Public
Fingal County Council_371DublinSingle Party Framework for the design, installation, operation and maintenance of rooftop Solar PV within Fingal County Council's Administrative Area with an Initial for three (3) Public BuildingsGrade 3 Conservation Architect-led Integrated Design Team Consultancy Services for Conservation and Mixed-Use Redevelopment Project at J.D. Daly’s, Abbeyfeale, Co. Limerick
Limerick City and County Council_103432Limerick.Procurement of a Grade 3 Conservation Architect-led Integrated Design Team for conservation and mixed-use redevelopment of J.D. Daly’s, Abbeyfeale, Co. Limerick. Services from Stage i to v under the Capital Works Management Framework. Mixed-use: commercial ground floor, residential first/second floors. Collateral warranties required from sub-consultants.Establishment of a Single Party Framework Agreement for the Provision of Architect-Led Integrated Design Team Services for Public Realm, Regeneration and Building Projects
Tipperary County CouncilClonmel, NenaghFrist: 25. JuniSingle Party Framework Agreement for Architect-Led Integrated Design Team Services for public realm, regeneration and building projects. Initial project: Transformational Regeneration of Roscrea Town Centre including public realm enhancement and a multi-use community facility at the former Walsh Printers (Stages 0 to 2b).Architect led Integrated Multidisciplinary Design Team Services including PSDP and QS for a new fire station in Finner, Ballyshannon, Co. Donegal. Along with an extension to Letterkenny Fire Station.
Donegal County Council_1193LiffordFrist: 30. JuliDonegal County Council are seeking an architect-led design team to provide consultancy services for the design and construction of a new 3-bay fire station in Finner, Ballyshannon, Co. Donegal, along with a standalone extension at Fire Brigade Headquarters in Letterkenny, Co. Donegal.Tender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare
Clare County CouncilEnnisFrist: 05. JuniTender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare.Multi-Party Framework Agreement for HSE Design Team Services 2025 - Major Capital Works DSE project value €50m - €400m excl. VAT - Independent Project Supervisor Design Process (PSDP) Services
Health Service Executive (HSE)KildareRegional Framework Agreement for HSE Design Team Services 2025 for Major Capital Works with project values between €50m and €400m excl. VAT in the HSE Dublin and South East health region (excluding St Vincent’s University Hospital and St Michael’s Hospital). The Framework is for Independent Project Supervisor Design Process (PSDP) Services. HSE Dublin and South-East provides health and social care services to South-East Dublin, Carlow, Kilkenny, South Tipperary, Waterford, Wexford and most areas of Wicklow.Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services for Road Infrastructure and associated services at IDA Ballina
IDA IrelandDublinThe Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Planner, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover.Multi-Party Framework Agreement for HSE Design Team Services 2025 - Major Capital Works DSE project value €50m - €400m excl. VAT - Energy Efficient Designer Services
Health Service Executive (HSE)KildareRegional Framework Agreement for HSE Design Team Services 2025 for Major Capital Works with project values between €50m and €400m excl. VAT in the HSE Dublin and South East health region (excluding St Vincent’s University Hospital and St Michael’s Hospital). The Framework is for Energy Efficient Designer Services. HSE Dublin and South-East provides health and social care services to South-East Dublin, Carlow, Kilkenny, South Tipperary, Waterford, Wexford and most areas of Wicklow.Integrated Architect or Engineer led Design Team for The THRIVE funded Refurbishment and Adaptive Reuse of the former Bank of Ireland, Court place Carlow
Carlow County CouncilCarlowFrist: 12. JuniTHRIVE ERDF funded exemplar project: Integrated Architect or Engineer led Design Team for refurbishment and adaptive reuse of former Bank of Ireland premises, Court Place, Carlow. Carlow County Council seeks innovative consortiums to deliver this prestigious project.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Fingal County Council_371.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.