Fingrid Oyj has decided to build a new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission line will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the w...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Fingrid Oyj
- Published:
- August 06, 2026
- Deadline:
- Not specified
- Object:
- Stromnetz / Hochspannungsleitung
Object classification
- Stromnetz / HochspannungsleitungPrimary
Tender description
Fingrid Oyj has decided to build a new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission line will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 2 ( Anttula - Ranttila) is approx. 44km
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock2 details capturedBidders and contractors · Address
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8The construction of 2 x (400 kV + 110 kV) transmission line Toivila - Hikiä, part 3
Fingrid OyjHelsinkiFingrid Oyj baut neue 2 x (400 kV + 110 kV) Stromleitungen zwischen den Umspannwerken Toivila und Hikiä. Die neuen Leitungen ersetzen größtenteils bestehende 110-kV-Leitungen. Beide Leitungen erhalten 400-kV- und 110-kV-Strukturen. Auf der westlichen Leitung (Code 2055) werden nur 400-kV-Seile installiert, auf der östlichen (Codes 2084/2085) beide. Der Abschnitt 3 (Ranttila-Hikiä) ist ca. 46 km lang.Signing of contract – the construction of 132 kV power lines Fitjar and Tysnes.
FAGNE ASHAUGESUNDFagne has entered into a contract in the procurement that was previously announced on Doffin, with reference 2026-102558. The following description was given in the original notice: Fagne plans to build a approx. 7 km long 66 (132) kV connection between Fitjar and Tysnes in Vestland County. Fagne would, thus, like to enter into a contract with a tenderer for the procurement of materials as well as the construction of the overhead power line. The power line encompasses approx. 4 km of the total route of 7 km. The procurement also includes the dismantling of the existing cable end mast in Ersvika further north at Tysnes, as well as the purchase of materials and the construction of a new cable end mast, as well as modifications to the supporting mast, including line stringing. For a more detailed description of the estimated contract start, progress and deadlines, please refer to the contract documentation chapter E. Any negotiations can be carried out in several phases/negotiation rounds, where the Contracting Authority reserves the right to reduce the number of tenders to be negotiated. A first reduction of the number of tenders can occur already before the negotiations, cf. the Utilities Regulations § 19-12 (4).Works contracts – Section 3 Paraćin – Trupale – Medjurovo (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project
Serbian Railway Infrastructure JSCBelgradeDeadline: Oct 02The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across all Subsections 3.1, 3.3 and 3.4, works include reconstruction of the existing and construction of new overhead contact line (OCL) systems, as well as electrical power installations in stations, tunnels and tunnel entrances, energy facilities, relay stations, sectioning posts (including those with neutral sections), remote control systems for electric traction installations, transformer stations supplied from OCL, and lighting of grade-separated crossings and access roads. During the execution of signalling works in stations, automatic switching of turnouts and train routes will not be possible. Due to the shutdown of station signalling systems, operations will be adapted to a temporary mode. Inter-signal interlocking devices (UMZ) will be used, installed in temporary rooms for train dispatchers, with traffic managed within station areas. Some limited works on neighbouring sections may be included in the scope of the contract.Installation of pipes with horizontal directional drilling (HDD) under Guldborgsund and Roskilde Fjord - 23/03722
Energinet Eltransmission A/SFredericiaDeadline: Jul 10The Contracting Authority wants to purchase horizontal directional drilling activities including installation of PE-pipes for establishing two sets of cable crossings for new 145 kV cable sys-tems and fiber connections across Guldborgsund (two pipe sets, two cable systems, LOT 1) and Roskilde Fjord (one pipe set, one cable system, LOT 2). The underground power cables will be installed by another Contractor by means of Watucab by utilizing the smaller pipes inside a bigger pipe. The Fibre Optical Cables (FOC) will be installed in dedicated pipes for this purpose. This tender concerns all pipes involved – both the smaller pipes and the bigger pipe on the outside. For further details regarding the purchase, reference is made to the tender documents. The value of the contracts is expected to amount to total 147 Mio. DKK The tender is divided into the following lots: Lot 1: Cable crossings for new 145 kV cable systems and fiber connections across Guldborgsund. Two pipe sets, two power cable systems oPipe #1 from Falster to Lolland. Estimated length 1,254 m oPipe #2 from Falster to Lolland. Estimated length 1,207 m Lot 2: Cable crossings for new 145 kV cable systems and fiber connections across Roskilde Fjord: One pipe set, one power cable system oPipe #1 from Roskilde Fjord West – East landings. Estimated length 1,755 m Tenders can be submitted for one or all partial agreementsDesign and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)
Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojDeadline: Oct 14The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank, the Asian Development Bank, the European Bank for Reconstruction and Development, the Islamic Development Bank, and the OPEC Fund for International Development. The Project will finance the construction of a 127 km greenfield railway line designed to bypass the Istanbul Metropolitan Area and establish a high-capacity overland link across the Istanbul Strait (Bosphorus). The line will be double-tracked, electrified, fully signalized, and mixed-use, capable of carrying both passengers and freight, with a maximum freight carrying capacity of 50 million tons per year. The proposed railway line will originate at Çayrova station on the Asian side and terminate at Çatalca station on the European side, crossing the Istanbul Strait by utilizing the existing track space allocated on the Yavuz Sultan Selim Bridge (YSS Bridge), also known as the Third Bosphorus Bridge, located at the northern end of the Istanbul Strait. The Ministry intends to apply a portion of the loan proceeds toward payments under the contract(s) for the "Design and Construction of Infrastructure and Superstructure Works, including Electrification" subdivided into four Lots as listed below. The scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian Tunneling Method (NATM) tunnels totaling 23.3 km, 17 cut-and-cover tunnels totaling 3.7 km, two viaducts and 40 bridges totaling 22.1 km, Stations, etc. The scope of works covered under each lot is specified in the RFP document. The Telecommunication and Signalling Works are not included in this procurement package and will tendered separately. The Ministry now invites sealed Proposals from eligible Proposers for the Design and Construction of Infrastructure & Superstructure Works including Electrification subdivided into the four lots below. Proposers may submit Proposal for one or more lot(s): Lot 1 — Construction and Electrification Works for the Çayrova – Sabiha Gökçen Airport – Kurtdomu Corridor (28,49 km); Lot 2 — Construction and Electrification Works for the Kurtdomu – Alibahadr Corridor (25,76 km); Lot 3 — Construction and Electrification Works for the Alibahadr – YSS Bridge – Mithatpaa Corridor (32,14 km); Lot 4 — Construction and Electrification Works for the Mithatpaa – stanbul Airport – Çatalca Corridor (39,49 km).Provision of Multidisciplinary Consultancy Services for the Design and Construction Administration (RIBA Workstages 1-6) of a New Car Parking Project at the United Nations Office at Nairobi (UNON), Kenya
UN SecretariatKenyaDeadline: Sep 01Introduction UNON is seeking multidisciplinary professional consultancy services to undertake RIBA Workstages 1 to 6 for a New Car Parking Project at the UNON Complex, Gigiri, Nairobi Kenya, including a feasibility study to assess the most suitable development options. The multidisciplinary services shall include but not be limited to Architecture, Structural & Civil Engineering, Mechanical Engineering, Electrical Engineering (including expertise in Photovoltaic Systems), ICT Engineering, Fire Safety Engineering, Cost planning and Estimating services and Landscaping. Due to the multidisciplinary nature of the requirement, it is anticipated that the services will be provided based on: - A single consultancy which can offer all the disciplines from its in-house capabilities. - A single consultancy which is acting lead as consultant and is offering some of the disciplines on a sub-consultancy basis: in this instance, the lead consultant shall be providing the architectural discipline. - A consortium or joint venture arrangement: again, one company from the consortium or joint venture will be required to act as lead consultant, providing the architectural discipline. Project Scope The final project solution remains to be confirmed and shall be developed through the feasibility and design stages. The preferred solution may include one or more design solutions, but range from the provision of the following options: an open surface car park or carparks; an open two-storey car park structure; or a combined solution incorporating both open car parking and a two-storey car park structure. In all cases, the project will include all required vehicle and pedestrian connections to the existing adjacent site and infrastructure, with the potential to include solar photovoltaic canopies, which would cover the requirements for both parking spaces and renewable power. The project shall integrate all mentioned disciplines and shall cover all required services and infrastructure including the following: Mechanical (Plumbing, Cold Water System, Irrigation System, Wastewater Drainage System, Rainwater and Stormwater Management and Drainage System), Electrical (Power, Lighting, Photovoltaic System, ICT (Wi-Fi, Fiber optic), Security (CCTV, Access control), Public Address (PA) system (Fire Safety, Fire Suppression /Protection System, Smoke Detector System, Alarm System). Scope of Assignment The scope of the assignment comprises full consultancy services, including a feasibility study to assess and recommend the car parking solution best suited to UNON's operational, environmental, technical and cost requirements. The services shall also include but not be limited to site appraisal, preparation and brief, concept design, detailed design and spatial coordination, technical design, construction documents including drawings, specifications and bills of quantities sufficient for tender and construction purposes, services during the tender/ bid process and services during the construction, handover and close out of the construction contract works. It is expected that the various project stages will follow the RIBA plan of works and include the following -which, even if not exhaustive, are a guide to stage activities: - RIBA Workstage 1 (Preparation and Brief, including a feasibility study to assess and recommend the most suitable car parking solution through various options); - RIBA Workstage 2 (Concept Design); - RIBA Workstage 3 (Spatial Coordination); - RIBA Workstage 4 (Technical Design); - RIBA Workstage 5 (Manufacturing and Construction); - RIBA Workstage 6 (Handover and Close Out). The selected Multidisciplinary Consultancy Firm or Consortium is to have the core project team delivering each of the work stages based in Nairobi. The core project team's presence in Nairobi shall be for the duration of the contract and extend for at least one month past the end of the defect liability period. Resource Requirements For the services describeConstruction Utility Ring (Power/Communications/ Water/ Sewage)
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄGdanskDeadline: Sep 13Experienced and qualified Companies are invited to provide procurement and construction of temporary power, communications, potable water, raw water, and sewage networks. These works are required to support the construction of the Poland Nuclear Power Plant. The scope of work covers the procurement and construction of temporary networks to support the construction of the nuclear power plant located on the Baltic Sea coast. As a result, temporary solutions will be developed for electrical power distribution, communications, raw and potable water, and sewage networks, which will supply utilities to temporary buildings and installations during the construction period. Detailed design will be provided by Bechtel. The scope of work includes, but is not limited to: Preparation of submittals for approval of proposed materials, and of construction means and methods. Procurement of required materials for construction of the utility ring power, communications, raw water, potable water, and sewage networks. The estimated quantities of materials specified in the design: Installation of 15 kV MV cable line 12/20 kV cables, including earthworks – quantity: 18 500 m Construction of cable duct system 2 x HDPE Ø40 – quantity: 7000 m Construction of a water pipeline made of PE100 – quantity: 5000 m Construction of a pressure pipeline with a diameter from 110x6.6 mm to 250x14.8, installed by open trench excavation, including all associated earthworks – quantity: 2000 m Construction of the utility ring power, communications, raw water, potable water, and sewage networks in the field in accordance with: Bechtel’s requirements for subcontractors performing work on the project site, including the project safety plan and requirements regarding work hours Coordination with other subcontractors performing work at the project site. Construction work will require survey-layout of the work, and the other requirements as established by the work scope in the tender package, e.g. conformance with the site plan for construction stormwater/erosion-sediment control. Construction of the utility ring networks includes providing all required tools, equipment, labor, supervision, technical and professional services, materials, consumables, and supplies required to complete the installation. The detailed scope of work will be outlined in the tender package documents, including technical specifications, geotechnical data for use in design, and other contractual materials provided to the Company. Details such as environmental controls/requirements/restrictions, site access, laydown space, construction water/power, job trailer accommodation will be addressed in the tender package. Interested parties shall have documented, proven experience in successful construction work on large projects in difficult ground conditions. Subcontractors that will be considered must demonstrate ability to provide equipment and crews of sufficient type and number; and proven experience with all required quality, safety and execution documentation related to completion of the work. Bechtel notes that previous proven work of similar scale and complexity (which includes completion of comparable installations) will be mandatory. Pre-qualification will include evaluation of bidders’ comparable experience on previous similar projects. Interested Companies must register/update their Contractor's information in Bechtel's iSupplier portal at https://supplier.becpsn.com link and select commodity code UB00 as their specialty. If Contractor has any questions or intends to express interest in bidding this requirement, the Company shall notify Bechtel’s Contact Person. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire which Company would complete with response to Bechtel for review. The prequalification questionnaire includes a list of questions required to be considered as prequalified, and examples to include demonstration of (i) experience in providing the works in the past or current projects, (ii) safety record and compliance to quality requirements (see section 8), (iii) compliance to certification of legally mandatory requirements (including anti-corruption and sanctions), (iv) financial standing (solvency), and (v) organizational capabilities Upon Bechtel’s evaluation of your response to the Poland Prequalification Questionnaire, Bechtel will notify if your Company meets, conditionally meets, or does not meet the prequalification requirements that closely match the requirements. A Company's submission of Prequalification Questionnaire does not automatically qualify your Company to be prequalified. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. Each prequalified Company will be required to execute a Non-Disclosure Agreement (NDA). Companies meeting the prequalification criteria and who have executed the NDA will be invited to submit proposals for Construction Utility Ring construction. The Request for Quotation (RFQ) shall include the award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. The Company is required to have: ISO 9001 or equivalent ISO 45001 and ISO 14001 Seller’s activities will need to comply with Polish Law and National Standards. Proposal may be provided in EURO, PLN, USD. Furthermore, the proposals will be requested as firm fixed unit rates.Market survey for the publication of a licence period for renting small electric vehicles on public ground in Oslo municipality.
Oslo kommune v/ BymiljøetatenOsloDeadline: Aug 15The Agency for Urban Environment would like to invite market participants who rent "free flow" shared electric bicycles and electric scooters to a market survey. The aim of the invitation is to gain general insight about the interest and the possibility the market has to offer electric bicycles in combination with electric scooters to ensure that the criteria in the next notice are in line with what the market can offer and the city wants. We would particularly like concrete feedback on free floating e-cycles that are not offered in Oslo in the current period. Currently Oslo offers two different offers of micromobility; the permission scheme for small electric vehicles (electric scooters and electric bicycles) and a separate contract with Oslo bysykkel. The licence scheme is a free flow scheme with 2 years duration and is open for companies with permission to have both electric bikes and electric scooters. In the current period, only electric scooters are offered from the companies that have permission in Oslo. Oslo Bysykkel offers fixed installations of electric bicycles and regular bicycles within ring 3 and is a contract that lasts until 2030. The current permit for small electric vehicles allows companies to place a total of 16,000 vehicles that are distributed equally between three companies. There are 5,334 vehicles for each company. The distribution of vehicles will be distributed in 4 zones that are regulated in the local regulations. In zones 1, 2 and 3, the companies have the possibility to deploy 8,000 vehicles (inner town), the remaining 8,000 can be placed in zone 4 (outer town). Of the 8,000 vehicles that can be placed within zone 3, there is a maximum of 3,200 vehicles in zone 3, 3,200 vehicles in zone 2, and 1,200 vehicles in zone 1. In 2025, more than 20 million trips were carried out, and a further increase is expected by the end of 2026. On average, the trips last with electric scooters in Oslo about 7 minutes, which makes up a distance of about 2 kilometres in the airline. The Agency for Urban Environment would like the tender to be developed in a safe and good way with the city ́s needs and that as many people as possible use the offer in the city. We would therefore like the market to give feedback on the following questions: 1. There should be some concrete changes in the design of questions from the previous notice period 2025-27 (see the annex). 2. Should the next notice also include electric bicycles and which segments can electric bicycles attract that do not electric scooters hit? 3. Previous experience gave electric bikes challenges in the urban area. Are the current e-cycles offered by the market small enough and adapted to confined urban spaces? 4. What does the market think about requirements for the size and length of the bicycles (wheel size in inches, length in cm)? 5. If a limit shall be set on the size of the e-cycles. What is the smallest size of e-cycles in the market and what size is recommended in Oslo? 6. Should there be a minimum and maximum number of e-cycles and how should it be distributed in the zones? 7. Fees have been preventive in order to avoid repeated parking errors. The municipality has no way of doing the same with electric bikes. How do companies solve the parking challenges that arise with electric bikes? 8. What is the market ́s attitude in general to forced parking in the city centre and forced parking only for electric bikes in other local centres and areas with high use? 9. What type of new technology can the market offer that contributes to safer urban transport with many walking, especially on pavements, parks, public urban areas etc.? Give examples. 10. Do you have anything else you would like to comment on or give feedback on? The Agency for Urban Environment reserves the right to select feedback and the right to not take into account input that is not relevant for the pending announcement. This is done in order to avoid disproportionate work with the received inputs. The Agency for Urban Environment selects relevant input from the feedback based on capacity, need, wants and professional assessment. Due to staff holidays, questions asked from interested parties will not be answered until after 3 August. A deadline is set for 18 August to ask questions to the market dialogue, and questions received after this cannot be answered. The deadline for submitting feedback and replying to the questions posed in the market dialogue is set at 25 August. A summary of the received input will be prepared. Input that the Agency for Urban Environment does not consider relevant for the pending announcement will not be included in the summary.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Fingrid Oyj.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.