Works contracts – Section 3 Paraćin – Trupale – Medjurovo (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project
The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Tru...
Railway Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Serbian Railway Infrastructure JSC
- Published:
- August 03, 2026
- Deadline:
- October 02, 2026
- Topic:
- Railway Construction
- Object:
- Bahngleis / Schienenstrecke
Object classification
- Bahngleis / SchienenstreckePrimary
Tender description
Show full descriptionCollapse description
The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across all Subsections 3.1, 3.3 and 3.4, works include reconstruction of the existing and construction of new overhead contact line (OCL) systems, as well as electrical power installations in stations, tunnels and tunnel entrances, energy facilities, relay stations, sectioning posts (including those with neutral sections), remote control systems for electric traction installations, transformer stations supplied from OCL, and lighting of grade-separated crossings and access roads. During the execution of signalling works in stations, automatic switching of turnouts and train routes will not be possible. Due to the shutdown of station signalling systems, operations will be adapted to a temporary mode. Inter-signal interlocking devices (UMZ) will be used, installed in temporary rooms for train dispatchers, with traffic managed within station areas. Some limited works on neighbouring sections may be included in the scope of the contract.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project
Serbian Railway Infrastructure JSCBelgradeDeadline: Sep 24The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract for Subsection 3.2 has been signed as Lot 2; following the termination of the Lot 1 Works Contract, the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment. The installation of ERTMS is planned under a third Works Contract; ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services. The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract financed project shall not violate or have violated any intellectual property rights. A services provider or providers will be selected in accordance with the EIB Guide to Procurement of July 2024.Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project
Serbian Railway Infrastructure JSCBelgradeDeadline: Sep 24The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract for Subsection 3.2 has been signed as Lot 2; following the termination of the Lot 1 Works Contract, the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment. The installation of ERTMS is planned under a third Works Contract; ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services. The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract financed project shall not violate or have violated any intellectual property rights. A services provider or providers will be selected in accordance with the EIB Guide to Procurement of July 2024.Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
Iarnród Eireann-Irish RailDublinDeadline: Aug 25This is a call to competition by IE for the procurement of a Contractor for the Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. As part of the Glasnevin MetroLink Enabling Works Programme, a specialist Civils and Structures contractor is being procured to undertake both the detailed design and construction of key enabling works. The appointed contractor will play a key role in delivering the enabling works package, which will be undertaken in advance of, or in parallel with, the main MetroLink M100, M401 and M500 contracts and are critical to reducing programme risk, minimising disruption to existing rail services, and protecting the DART+ Programme.9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
Iarnród Eireann-Irish RailDublinDeadline: Aug 04This is a call to competition by IE for the procurement of a Contractor for the Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. As part of the Glasnevin MetroLink Enabling Works Programme, a specialist Civils and Structures contractor is being procured to undertake both the detailed design and construction of key enabling works. The appointed contractor will play a key role in delivering the enabling works package, which will be undertaken in advance of, or in parallel with, the main MetroLink M100, M401 and M500 contracts and are critical to reducing programme risk, minimising disruption to existing rail services, and protecting the DART+ Programme.Employers representative, technical advisory and assigned certifier services for the Project Barrow Social Housing Design and Build Contract
National Treasury Management Agency (NTMA)DublinDeadline: Aug 27The National Treasury Management Agency (describing itself as the National Development Finance Agency) (“NDFA”), as agent for and on behalf Dublin City Council (“DCC”) and Kildare County Council (“KCC”) gives notice of its intention to award a contract(s) for the services to support the construction stage of the Project Barrow Social Housing Design and Build Contract (“Project Barrow”). The services required include Employer’s Representative (ER) and Technical Advisory (TA) services (“ER/TA Services”) and Assigned Certifier (AC) services (”AC Services”) for Project Barrow. It is proposed to award two separate contracts for ER/TA services (Lot 1) and, AC services (Lot 2). The Estimated Value figure is an estimate only and the value of any services contracted may be lower or higher than the estimated figure. A list of the sites is included with the documentation accompanying this contract notice, however this may be subject to change. All sites within the project have full planning permission, fire and disability access certification. The “Projects” section of the NDFA website www.ndfa.ie/projects will be updated from time to time so prospective participants are advised to visit it regularly. The NDFA intends that the successful tenderer(s) be awarded a contract for each Lot in the form of the Capital Works Management Framework (Standard Conditions of Engagement for Consultancy Services (COE1)) available at https://constructionprocurement.gov.ie. Please note that the information outlined above is indicative only. The NDFA reserves the right to amend, alter or vary the information contained within this notice.Single Supplier Framework Agreement for Design and Build Civil and Structural Contractor for DART+
Iarnród Eireann-Irish RailDublinDeadline: Oct 24This is a call to competition by IE for the procurement of a Design and Build Civil and Structural Contractor by way of a single supplier Framework Agreement, one Contractor will be the sole supplier. DART+ is a transformative programme of projects that aims to modernise and improve existing rail services in the Greater Dublin Area (GDA). The DART network will increase from 50 kilometres to 150 kilometres transforming commuter train travel in the Greater Dublin Area. It will provide a sustainable, electrified, reliable and more frequent rail service improving capacity in all rail corridors serving Dublin, bringing DART travel with all its benefits to new and existing communities. The provision of a new electrified fleet will improve capacity and reduce greenhouse gas emissions.Procurement of services within project management and work management in tree plant projects.
Oslo kommune v/ Plan- og bygningsetatenOsloOslo municipality c/o the Agency for Planning and Building Invites tenderers to an open tender contest. The aim of the competition is to enter into a contract for the procurement of services in connection with the execution of wood plant suction in Oslo wood. The wood plant suction work Oslo trees is a project where youths working for Oslo municipality ́s districts participate in tree plant projects. The main delivery shall be consultancy services in the form of project management in tree plant projects and work management for youths at work. Oslo municipality is one of Norway's largest employers with approx. 50,000 employees and an annual budget of approx. The Planning and Building Agency is responsible for the execution of the municipality ́s area management. In 2024, the agency carried out procurements for approx.Contract award: Plumbing and HVAC and sanitation services for Helse Stavanger HF
SYKEHUSINNKJØP HFVADSØContract award: Helse Stavanger HF would like to enter into a framework agreement with a plumbing company for installation and maintenance work within plumbing and HVAC for the institutions in the health company. Helse Stavanger HF would like tenders for an hourly rate and mark-up materials for installation and maintenance work. The framework agreement is intended to cover the Contracting Authority's continual need for services in the discipline. Tenderers shall be able to carry out most types of plumbing work in connection with alterations, operations and maintenance in Helse Stavanger HF ́s buildings. The locations at Ullandhaug and Våland will mainly be involved. The work assignments can be both short-term and long-term. In addition to normal operation and maintenance work, Helse Stavanger HF shall implement the "interim phase project". The middle phase project is one project for alterations and adaptations of the existing buildings at Våland to outpatient operations and day treatment. This will start after all wards and emergency functions move to New SUS at Ullandhaug on November 16 this year.Framework agreement for the purchase of traffic registration equipment for motor vehicles at fixed stations.
Statens vegvesenMossDeadline: Aug 31The contracting authority would like tenders for a framework agreement for the purchase of traffic registration equipment for motor vehicles at fixed stations. The Norwegian Public Roads Administration is responsible for collecting road traffic data (further called traffic data) on most european and all national roads in Norway. Nye veier, the counties and municipalities are responsible for collecting traffic data for the other roads. Traffic data will be used, among other things, for traffic management, operation and planning of roads. The Norwegian Public Roads Administration has developed a separate system called the 'Traffic Data System' for the collection, processing and publication of traffic data. Depending on the type of traffic registration equipment (desktop or mobile), data is collected in different ways. Data loggers that are at fixed stations with continuous registration, are connected directly to the traffic data system in a closed network. The communication between the data loggers and the traffic data system takes place over OPCUA. Data from stationary continual stations is retrieved with just a few seconds delay.Framework contract for interior design and the delivery of furniture at the JRC Geel and Petten site.
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Aug 06The JRC Geel and Petten wants to conclude an interior design and furniture contract for the future equipment of its offices and working spaces. The interior design part should allow for working spaces that are in line with the vision of the JRC being compliance with New European Bauhaus and flexible working spaces. Delivery shall be foreseen in Petten as well as in Geel.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 02. Oktober 2026.
- Who is the contracting authority?
- The contracting authority is Serbian Railway Infrastructure JSC.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.