New: market reports on German public procurement Read the report

Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojTED

Design and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)

The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank...

Submission deadline: October 14, 2026Type: Tender

Engineering Structures, Electrical Installation, Foundation Engineering, Shell Construction, Railway Construction

Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska
Published:
August 20, 2026
Deadline:
October 14, 2026
Topic:
Engineering Structures
Object:
Bahngleis / Schienenstrecke

Object classification

  • Bahngleis / SchienenstreckePrimary

Tender description

Show full description

The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank, the Asian Development Bank, the European Bank for Reconstruction and Development, the Islamic Development Bank, and the OPEC Fund for International Development. The Project will finance the construction of a 127 km greenfield railway line designed to bypass the Istanbul Metropolitan Area and establish a high-capacity overland link across the Istanbul Strait (Bosphorus). The line will be double-tracked, electrified, fully signalized, and mixed-use, capable of carrying both passengers and freight, with a maximum freight carrying capacity of 50 million tons per year. The proposed railway line will originate at Çayrova station on the Asian side and terminate at Çatalca station on the European side, crossing the Istanbul Strait by utilizing the existing track space allocated on the Yavuz Sultan Selim Bridge (YSS Bridge), also known as the Third Bosphorus Bridge, located at the northern end of the Istanbul Strait. The Ministry intends to apply a portion of the loan proceeds toward payments under the contract(s) for the "Design and Construction of Infrastructure and Superstructure Works, including Electrification" subdivided into four Lots as listed below. The scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian Tunneling Method (NATM) tunnels totaling 23.3 km, 17 cut-and-cover tunnels totaling 3.7 km, two viaducts and 40 bridges totaling 22.1 km, Stations, etc. The scope of works covered under each lot is specified in the RFP document. The Telecommunication and Signalling Works are not included in this procurement package and will tendered separately. The Ministry now invites sealed Proposals from eligible Proposers for the Design and Construction of Infrastructure & Superstructure Works including Electrification subdivided into the four lots below. Proposers may submit Proposal for one or more lot(s): Lot 1 — Construction and Electrification Works for the Çayrova – Sabiha Gökçen Airport – Kurtdomu Corridor (28,49 km); Lot 2 — Construction and Electrification Works for the Kurtdomu – Alibahadr Corridor (25,76 km); Lot 3 — Construction and Electrification Works for the Alibahadr – YSS Bridge – Mithatpaa Corridor (32,14 km); Lot 4 — Construction and Electrification Works for the Mithatpaa – stanbul Airport – Çatalca Corridor (39,49 km).

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

6 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

10

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 14. Oktober 2026.
Who is the contracting authority?
The contracting authority is Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Next step

Get full access to this tender

Access all documents for "Design and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)" from Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska and keep track of deadlines and submission guidelines.

Deadline tracked until October 14, 2026No credit card required