Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojTED
Design and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)
The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank...
Engineering Structures, Electrical Installation, Foundation Engineering, Shell Construction, Railway Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska
- Published:
- August 20, 2026
- Deadline:
- October 14, 2026
- Topic:
- Engineering Structures
- Object:
- Bahngleis / Schienenstrecke
Object classification
- Bahngleis / SchienenstreckePrimary
Tender description
Show full descriptionCollapse description
The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank, the Asian Development Bank, the European Bank for Reconstruction and Development, the Islamic Development Bank, and the OPEC Fund for International Development. The Project will finance the construction of a 127 km greenfield railway line designed to bypass the Istanbul Metropolitan Area and establish a high-capacity overland link across the Istanbul Strait (Bosphorus). The line will be double-tracked, electrified, fully signalized, and mixed-use, capable of carrying both passengers and freight, with a maximum freight carrying capacity of 50 million tons per year. The proposed railway line will originate at Çayrova station on the Asian side and terminate at Çatalca station on the European side, crossing the Istanbul Strait by utilizing the existing track space allocated on the Yavuz Sultan Selim Bridge (YSS Bridge), also known as the Third Bosphorus Bridge, located at the northern end of the Istanbul Strait. The Ministry intends to apply a portion of the loan proceeds toward payments under the contract(s) for the "Design and Construction of Infrastructure and Superstructure Works, including Electrification" subdivided into four Lots as listed below. The scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian Tunneling Method (NATM) tunnels totaling 23.3 km, 17 cut-and-cover tunnels totaling 3.7 km, two viaducts and 40 bridges totaling 22.1 km, Stations, etc. The scope of works covered under each lot is specified in the RFP document. The Telecommunication and Signalling Works are not included in this procurement package and will tendered separately. The Ministry now invites sealed Proposals from eligible Proposers for the Design and Construction of Infrastructure & Superstructure Works including Electrification subdivided into the four lots below. Proposers may submit Proposal for one or more lot(s): Lot 1 — Construction and Electrification Works for the Çayrova – Sabiha Gökçen Airport – Kurtdomu Corridor (28,49 km); Lot 2 — Construction and Electrification Works for the Kurtdomu – Alibahadr Corridor (25,76 km); Lot 3 — Construction and Electrification Works for the Alibahadr – YSS Bridge – Mithatpaa Corridor (32,14 km); Lot 4 — Construction and Electrification Works for the Mithatpaa – stanbul Airport – Çatalca Corridor (39,49 km).
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock4 details capturedLots LOT-0001 · Lots LOT-0002 · Lots LOT-0003 · Lots LOT-0004
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project
Serbian Railway Infrastructure JSCBelgradeDeadline: Sep 24The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract for Subsection 3.2 has been signed as Lot 2; following the termination of the Lot 1 Works Contract, the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment. The installation of ERTMS is planned under a third Works Contract; ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services. The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract financed project shall not violate or have violated any intellectual property rights. A services provider or providers will be selected in accordance with the EIB Guide to Procurement of July 2024.Works contracts – Section 3 Paraćin – Trupale – Medjurovo (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project
Serbian Railway Infrastructure JSCBelgradeDeadline: Oct 02The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across all Subsections 3.1, 3.3 and 3.4, works include reconstruction of the existing and construction of new overhead contact line (OCL) systems, as well as electrical power installations in stations, tunnels and tunnel entrances, energy facilities, relay stations, sectioning posts (including those with neutral sections), remote control systems for electric traction installations, transformer stations supplied from OCL, and lighting of grade-separated crossings and access roads. During the execution of signalling works in stations, automatic switching of turnouts and train routes will not be possible. Due to the shutdown of station signalling systems, operations will be adapted to a temporary mode. Inter-signal interlocking devices (UMZ) will be used, installed in temporary rooms for train dispatchers, with traffic managed within station areas. Some limited works on neighbouring sections may be included in the scope of the contract.Construction and Rehabilitation of Community Infrastructure and Public Facilities in Karachi and Peshawar, Pakistan (4 Lots)
UN SecretariatKenyaDeadline: Aug 28The United Nations Office at Nairobi (UNON), on behalf of the United Nations Human Settlements Programme (UN-Habitat), invites qualified, experienced, and reputable consultancy firms with demonstrated experience to submit Expressions of Interest (EOI) for participation in the upcoming Invitation to Bid (ITB) for the below 4 Projects in multiple locations in Karachi and Peshawar, Pakistan. Background: The targeted informal settlements in Karachi and Peshawar face significant deficiencies in water supply, sewerage, drainage, roads, educational facilities and safe, inclusive public spaces. Existing infrastructure is frequently deteriorated, undersized or poorly maintained, limiting reliable access to basic services and affecting public health, safety, mobility and community well-being. To address these challenges, the United Nations Human Settlements Programme (UN-Habitat) is implementing a series of infrastructure and basic service improvement projects. These interventions were identified and prioritized by the target communities through a participatory settlement planning process, during which communities developed Strategic Settlement Plans (SSPs) to comprehensively address their development needs and challenges. The objective is to complete, test, commission and hand over all contracted works under each awarded lot in accordance with the approved drawings, technical specifications, BoQ, safeguards requirements and approved work programme, thereby improving the safety, resilience and living conditions of vulnerable urban communities in Karachi and Peshawar through reliable basic services and inclusive community infrastructure. Lot 1: Karachi (CE09) a) - Rehabilitation of Damaged Sewerage Line through Cleaning and RCC Pipe Replacement b) - Replacement of Existing Water Supply Line c) - Rehabilitation of Damaged Sewerage Line through Cleaning and RCC Pipe Replacement Lot 2: Karachi (CE09) a) Rehabilitation of Existing Water Supply Line b) Rehabilitation of Damaged Sewerage Line through Cleaning and RCC Pipe Replacement c) Rehabilitation of Damaged Sewerage Line through Cleaning and RCC Pipe Replacement d) Solarization of Existing Water Pump and Upgradation of Secondary Water Supply Pipeline e) Rehabilitation of Damaged Sewerage Line through Cleaning and RCC Pipe Replacement f) Rehabilitation of Damaged Sewerage Line through Cleaning and RCC Pipe Replacement. Niazi Colony g) Rehabilitation of Damaged Sewerage Line through Cleaning and RCC Pipe Replacement h) Rehabilitation of Damaged Sewerage Line through Cleaning and RCC Pipe Replacement Lot 3: Karachi (CE10) a) Rehabilitation of Existing Building for School b) Upgradation of Graveyard Boundary Wall with Integrated Urban Street Nook (Shaded Seating and Stepped Platforms) c) Development of Community Recreational Park and connecting street Lot 4: Peshawar (CE01) a) Rehabilitation of the Main Tajabad Asphalt Road, approximately 1,100 metres long b) Construction of the Main Asphalt Road from Park Side to Salfi Masjid, approximately 800 metres long c) Rehabilitation of Existing Open Drain, approximately 5,000 RFT long Works will be implemented under a multi-lot procurement arrangement, with each lot corresponding to a distinct project site. Submission of an Expression of Interest (EOI) does not constitute a commitment to submit a bid under the subsequent solicitation. Bidders will have the option, under the ITB, to submit bids for one or more lots, subject to demonstrating the requisite technical capacity, relevant experience, and availability of resources for each lot for which a bid is submitted. Specific Requirements/Information IMPORTANT: This is not a request for submission of bids/proposals. Further details of the technical requirements, scope of work, specifictions, evaluation criteria will be provided under the solicitation stage at a later date. Interested vendors must posses the necessary technical expertise and capacity to proEngineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project
Serbian Railway Infrastructure JSCBelgradeDeadline: Sep 24The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract for Subsection 3.2 has been signed as Lot 2; following the termination of the Lot 1 Works Contract, the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment. The installation of ERTMS is planned under a third Works Contract; ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services. The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract financed project shall not violate or have violated any intellectual property rights. A services provider or providers will be selected in accordance with the EIB Guide to Procurement of July 2024.Supervision of Works on Construction of Sewerage Network Phase II in the Municipality of Nikšić
City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland)Belgrade*Short description: Scope of procurement is provision of supervision of works on sewerage network. Indicative scope of Works, which will be implemented in accordance to the FIDIC Conditions of Contract (Red Book – ed 1999), include: • Construction of a wastewater network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža) for collection and transportation of the wastewater to WWTP. The total length of the network is app 41 km and consists of the PE pipes of following diameters and concrete manholes: • DN 300 mm, L=1,960 m - The main collector crosses the Bistrica River via an existing bridge. • DN 250 mm, L=3,750 m • DN 200 mm, L=30,510 m • House connections, DN 200 mm, L=5,000 m • Manholes, total 3,600 pcs • Construction of a new sewerage pumping station called "Cemenca" (Q=50 l/s; H=9 m, P=5 kW), and a pressure line diameter of DN200 mm with a length of 165 m. • Rehabilitation of the existing pumping station "Duklo (Q=72 l/s; P=30 kW). As major part of the rehabilitation efforts, the existing manual screen will be replaced with an automated one. The supervision of Works shall be implemented in compliance with the requirements of the Montenegrin legislation and relevant EU and EIB requirements. The Consultant must particularly consider licensing and permits requirements in the Law on Construction of Structures in Montenegro in force.Rehabilitation of 9 Tunnels on the Vrbnica–Bar Railway Line, Montenegro
Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojDeadline: Aug 24Rehabilitation works on nine railway tunnels (T154, T156, T157, T165, T167, T169, T215, T218 and T247) along the Vrbnica–Bar railway line in Montenegro, with a combined length of approximately 2,921.5 metres. The works will be carried out whilst the line remains in commercial operation, in defined daily traffic intervals as set out in the Tender Documents. The Contract is co-financed by the European Investment Bank under the Western Balkans Investment Framework (WBIF) and and is governed by the FIDIC Conditions of Contract for Construction (Red Book), First Edition 1999.CT2385/2025 - TENDER FOR THE CONSTRUCTION AND FINISHING IN AN ENVIRONMENTALLY FRIENDLY MANNER OF AN AMENITY BUILDING AND A NUMBER OF KENNELS WITHIN THE EXISTING CUSTOMS CANINE UNIT AT ĦAL FAR, INCLUDING MECHANICAL, ELECTRICAL AND LANDSCAPING WORKS
Department of ContractsFlorianaCT2385/2025 - TENDER FOR THE CONSTRUCTION AND FINISHING IN AN ENVIRONMENTALLY FRIENDLY MANNER OF AN AMENITY BUILDING AND A NUMBER OF KENNELS WITHIN THE EXISTING CUSTOMS CANINE UNIT AT ĦAL FAR, INCLUDING MECHANICAL, ELECTRICAL AND LANDSCAPING WORKS“Construction works for the Basic project for the Upgrade of the Markova Noga Police Station on construction plot 1.1.3 of the Urban Design for Buildings of State importance for the Border Crossing “Markova Noga-Lemos” 2nd phase of the implementation of the Basic Project for the construction of the facility “Border Crossing Markova Noga - Lemos” with technical number 0308-661-777/2022 of 11.2022”
Ministry of internal affairsSkopjeDeadline: Sep 21Short description of the contract: Works contract involves the reconstruction and upgrade of the existing Border Police facility located near Markova Noga, in the village of Dolno Dupeni, adjacent to the Greek border. The current structure, originally built in the mid-20th century and previously used by the JNA, consists of three connected modules of varying construction types. Following inspections and structural assessments, the design proposes retaining the left and right modules while demolishing the central section to create a new entrance hall, stairway, and access points. The renovation will include a new roof, upgraded structural elements, and a covered courtyard serving as the main entry and parking area. The interior layout is planned to support the station’s operational needs, including offices, storage, reception, and duty areas, while the new upper floor will house administrative offices, staff facilities, restrooms, and a communal space with a kitchen and terrace. Additionally, a covered walkway will connect this building with the nearby Border Crossing (BC) complex used by both the Border Police and Customs. Parking provisions include one nearby public space and four official spaces within the plot. Works will be implemented following the PRAG Conditions of Contract. Type of procedure: Open“Construction works for the Basic project for the Upgrade of the Markova Noga Police Station on construction plot 1.1.3 of the Urban Design for Buildings of State importance for the Border Crossing “Markova Noga-Lemos” 2nd phase of the implementation of the Basic Project for the construction of the facility “Border Crossing Markova Noga - Lemos” with technical number 0308-661-777/2022 of 11.2022”
Ministry of internal affairsSkopjeDeadline: Sep 21Short description of the contract: Works contract involves the reconstruction and upgrade of the existing Border Police facility located near Markova Noga, in the village of Dolno Dupeni, adjacent to the Greek border. The current structure, originally built in the mid-20th century and previously used by the JNA, consists of three connected modules of varying construction types. Following inspections and structural assessments, the design proposes retaining the left and right modules while demolishing the central section to create a new entrance hall, stairway, and access points. The renovation will include a new roof, upgraded structural elements, and a covered courtyard serving as the main entry and parking area. The interior layout is planned to support the station’s operational needs, including offices, storage, reception, and duty areas, while the new upper floor will house administrative offices, staff facilities, restrooms, and a communal space with a kitchen and terrace. Additionally, a covered walkway will connect this building with the nearby Border Crossing (BC) complex used by both the Border Police and Customs. Parking provisions include one nearby public space and four official spaces within the plot. Works will be implemented following the PRAG Conditions of Contract. Type of procedure: Open26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve
Gas Networks IrelandCorkDeadline: Jul 25Gas Networks Ireland (GNI) is establishing a Qualification System for the provision of Engineering, Procurement, Construction (EPC) works and services (Lot 1) and Operation and Maintenance (O&M) services (Lot 2) for the Strategic Gas Emergency Reserve (SGER). Lot 1 is for the engineering, procurement, and construction works and services to complete infrastructure assets including but not limited the jetty, trestle, topside structures, pipelines, above ground installation (AGI), integration with FSRU, onshore terminal systems, related ancillary and enabling utilities to site and the management of nominated subcontractor(s). Lot 2 is for operation and maintenance services in relation to jetty, trestle, topside structures, pipelines, integration with FSRU, onshore terminal systems that may be required from time to time to facilitate the operation of the SGER. The Lot 2 contractor will be novated to the Lot 1 contractor for the duration of the EPC period, commissioning and defects correction period, with a subsequent three-year operation and maintenance period commencing from completion of commissioning. A further O&M period of up to five years is anticipated following completion of the initial period. Applicants may apply for and qualify in one or more Lots. GNI has immediate requirements which may be tendered in the near future, through an Initial Competition. Applicants who are interested in participating in the Initial Competition must submit their QSQ responses through the eTenders system by 12.00hrs (Irish time) 18th September 2026, unless amended.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 14. Oktober 2026.
- Who is the contracting authority?
- The contracting authority is Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of Srpska.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.