City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland)BelgradeTED
Supervision of Works on Construction of Sewerage Network Phase II in the Municipality of Nikšić
*Short description: Scope of procurement is provision of supervision of works on sewerage network. Indicative scope of Works, which will be implemented in accordance to the FIDIC Conditions of Contract (Red Book – ed 1999), include: • Construction of a wastewater network for four settlements located at the North of the City centre (Dragov...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland)
- Published:
- August 11, 2026
- Deadline:
- Not specified
Tender description
Show full descriptionCollapse description
*Short description: Scope of procurement is provision of supervision of works on sewerage network. Indicative scope of Works, which will be implemented in accordance to the FIDIC Conditions of Contract (Red Book – ed 1999), include: • Construction of a wastewater network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža) for collection and transportation of the wastewater to WWTP. The total length of the network is app 41 km and consists of the PE pipes of following diameters and concrete manholes: • DN 300 mm, L=1,960 m - The main collector crosses the Bistrica River via an existing bridge. • DN 250 mm, L=3,750 m • DN 200 mm, L=30,510 m • House connections, DN 200 mm, L=5,000 m • Manholes, total 3,600 pcs • Construction of a new sewerage pumping station called "Cemenca" (Q=50 l/s; H=9 m, P=5 kW), and a pressure line diameter of DN200 mm with a length of 165 m. • Rehabilitation of the existing pumping station "Duklo (Q=72 l/s; P=30 kW). As major part of the rehabilitation efforts, the existing manual screen will be replaced with an automated one. The supervision of Works shall be implemented in compliance with the requirements of the Montenegrin legislation and relevant EU and EIB requirements. The Consultant must particularly consider licensing and permits requirements in the Law on Construction of Structures in Montenegro in force.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Supervision of Works for Improvement of the Water Supply System in the Old Royal Capital Cetinje, Montenegro
City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland)BelgradeIndicative scope of Works on the project “Supervision of Works for Improvement of the Water Supply System in the Old Royal Capital Cetinje, Montenegro” includes the following elements: • Construction of transmission and distribution mains of diameter DN32 to DN400, with approximate length of 92 km (to be implemented within 5 phases), incl. including house connections and installation of flow meters • Construction of the new reservoir Sandin vrh 1 and booster station Sandin vrh 2 (6th phase) • Reconstruction of the existing water supply network • Reconstruction of the transmission main from BC Lašor to the reservoir Zagrablje • Reconstruction of the pumping station Višnjica and the breaking chamber Velja Gora Works will be implemented according to FIDIC Red Book (1999 ed). The supervision of Works shall be implemented in compliance with the requirements of the Montenegrin legislation and relevant EU requirements. The Consultant must particularly consider licensing and permits requirements in the Law on Construction of Structures in Montenegro in force.Connection of Vinica to WWTP Kocani, including partial rehabilitation and extension of sewarage and stormwater systems in the Municipality of Vinica
Government of North MacedoniaMinistry of Finance, Central Financing and Contracting Department (CFCD)SkopjeDeadline: Sep 17-Construction of 18km collectors, energy efficient pumping station to connect approx 15,000 PE/ secondary sewerage networks to WWTP Kocani -Partial rehabilitation of 3,700m secondary sewerage network and extension of 3,600m stormwater network in Vinica -Construction of new outlet at WWTP Kocani (1,300m) Works of the sewerage network will be implemented under FIDIC conditions of contract ("Red Book, 1999 edition")Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Sep 01Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Aug 31Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Supervision of the Works for the reconstruction and expansion of Serbian port of Bogojevo
Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojDeadline: Sep 15Supervision services according to the FIDIC (The International Federation of Consulting Engineers) Contract Conditions (the FIDIC Engineer) and relevant national legislation for the reconstruction of the existing port area and quay of approx. 16 ha and 167 m respectively, and construction of a new part of the port terminal for bulk and general cargo of an area of approx. 30 ha and a quay length of approx. 230 m, as upstream extension of the existing port area. The Works to be supervised also include the access road and port infrastructure and utilities (e.g. internal roads and railways, sewerage, water, power supply). The existing port facilities shall be operational during the Works. The Contract will be managed according to the FIDIC Conditions of Contract for Construction for building and engineering works designed by Employer (FIDIC RED Book, First Edition 1999).Wastewater collection and treatment investment project in the Municipality of Stip
Government of North MacedoniaMinistry of Finance, Central Financing and Contracting Department (CFCD)SkopjeDeadline: Sep 17LOT 1: Design and construction of WWTP for 50,000 PE, with secondary treatment and Ph removal. Works will be implemented following FIDIC conditions of contract ("Yellow Book", 1999 edition) LOT 2: -Rehabilitation/replacement/reconstruction of approx 33 km network -Construction of 4 pumping stations -Procurement of sewer water cleaning equipment Works will be implemented following FIDIC conditions of contract ("Red Book", 1999 edition)Rehabilitation of water supply pipelines; construction of the Skrad public sewer system
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Sep 01The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Rehabilitation of water supply pipelines; construction of the Skrad public sewer system
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Aug 31The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Reconstruction of the Sanitary Sewer System of Kutaisi
LVL technologies GmbH & Co KGCrailsheimLot 1: KWWP Construction of Sewer System Phase 1/01: Construction of wastewater collection gravity lines with a length of 79.94 km and 3500 house connections; Lot 2: KWWP Construction of Sewer System Phase 1/02: Construction of wastewater collection gravity lines of 61.97 km and 6.67 km pressure lines, two pumping stations in the capacity of (1) Q=1.75 l/s, H=41m, and (2) Q=20l/s, H=47m, and 3300 house connections.Feasibility Study-Construction of Sewerage Network & Wastewater Treatment Plant
UNDPJordanDeadline: Sep 09The subject of these RFP is the preparation of a Feasibility Study for the construction of a sewerage network with a wastewater treatment plant in the Municipality of Zeta. By adopting the most economically and technically appropriate conceptual solution, the conditions will be created for the development of the sewerage network throughout the territory of the Municipality of Zeta. Please indicate whether you intend to submit a bid by creating a draft response without submitting directly in the system. This will enable the system to send notifications in case of amendments of the tender requirements. Should you require further clarifications, kindly communicate using the messaging functionality in the system. Offers must be submitted directly in the system following this link: http://supplier.quantum.partneragencies.org using the profile you may have in the portal. In case you have never registered before, you can register a profile using the registration link shared via the procurement notice and following the instructions in guides available in UNDP website: https://www.undp.org/procurement/business/resources-for-bidders. Do not create a new profile if you already have one. Use the forgotten password feature in case you do not remember the password or the username from previous registration.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.