KD VODOVOD I KANALIZACIJA d. o. o.Rijeka
Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines
Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping...
Pipeline Construction, Sewer Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- KD VODOVOD I KANALIZACIJA d. o. o.
- Published:
- August 04, 2026
- Deadline:
- August 31, 2026
- Topic:
- Pipeline Construction
- Object:
- Kanalnetz / Abwasserkanal
Object classification
- Kanalnetz / AbwasserkanalPrimary
- Trinkwasserleitung / Versorgungsnetz
Tender description
Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
5 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock1 detail capturedDocuments
Buyer
Unlock3 details capturedBuyer · Address · Contact
Procedure data
Unlock4 details capturedPublication number · Procedure reference · Procedure type · Contract type
Performance locations
Unlock1 detail capturedPerformance locations
Publisher
Unlock2 details capturedPublisher · Address
Related tenders
10Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Sep 01Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Rehabilitation of water supply pipelines; construction of the Skrad public sewer system
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Aug 31The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Rehabilitation of water supply pipelines; construction of the Skrad public sewer system
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Sep 01The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Reconstruction of the Sanitary Sewer System of Kutaisi
LVL technologies GmbH & Co KGCrailsheimLot 1: KWWP Construction of Sewer System Phase 1/01: Construction of wastewater collection gravity lines with a length of 79.94 km and 3500 house connections; Lot 2: KWWP Construction of Sewer System Phase 1/02: Construction of wastewater collection gravity lines of 61.97 km and 6.67 km pressure lines, two pumping stations in the capacity of (1) Q=1.75 l/s, H=41m, and (2) Q=20l/s, H=47m, and 3300 house connections.The Connection of Letterbrick to the Public Water Supply
Donegal County Council_1193LiffordDeadline: Sep 09Donegal County Council wishes to appoint an Engineering Services Provider (ESP) for the design of interconnector watermains for households and private Group Water Schemes (GWSs) located in Letterbrick to the closest point on the Public Water Supply, or other suitable location as determined by UÉ. The service is to include for all Civil and Hydraulic Design services as required; any environmental / ecological evaluations required; preparation and submission of any planning applications required; preparation of construction tender docs, administration of tender process (publication, clarifications, evaluation, etc.); award and management of construction contract. The ESP will also be required to act as PSDP for the Project.WSC/T/039/2026 - SERVICE – FRAMEWORK FOR CCTV INSPECTION OF THE SEWER MAINS FOR THE WATER SERVICES CORPORATION
Water Services CorporationLuqaDeadline: Aug 10The subject of this framework tender is to provide the service of a close circuit television (CCTV) inspection of the sewer pipes of various diameters and lengths. The service will include the inspection of each sewer and to produce a written report complete with indexed photos and DVD. The work shall be done in accordance with the Contract Documents and to the satisfaction of the WSC.Connection of Townawilly Group Water Scheme Co-Operative Society to the Public Water Supply
Donegal County Council_1193LiffordThis project involves upgrading and restructuring the water supply infrastructure in the Townawilly area. The aim is to improve water quality, ensure compliance with regulatory standards, and deliver a more efficient and reliable water network. The contract includes the design and construction of an interconnector water main to connect the existing scheme to the Public Water Supply Scheme (PWSS) operated by Uisce Éireann (UÉ), which will allow for the decommissioning of the Townawilly Group Water Scheme (GWS) Water Treatment Plant. The contract also involves key upgrades to UÉ infrastructure, including construction of new watermain connections and a new booster pump station (PS) at the Glencoagh Storage Reservoir (SR) site to serve both the Glencoagh and Eddrim Glebe networks. Additionally, the Eddrim Glebe PS will be upgraded with new pumps and a change in the pumping arrangement.2026/23674 WATER AND SEWAGE JENSVOLL, BODØ KOMMMUNE
Bodø KommuneBODØDeadline: Sep 24The tender includes the design and construction of rehabilitation and renewal works for the water and wastewater infrastructure in Bodø Municipality, between Sørstrupen and the Jensvoll wastewater treatment plant/pumping station, with a total length of approximately 1,800 metres, of which approximately 400 metres are included as an option. The tender requires a lump-sum (fixed-price) offer for both the design and implementation of the project.The public enterprise was established to enable the integration of the primary and secondary networks, protection of Lake Ohrid, and regulation of water supply in one joint organization.
JP VODOVOD I KANALIZACIJA StrugaStrugaDeadline: Aug 24The public enterprise was established to enable the integration of the primary and secondary networks, protection of Lake Ohrid, and regulation of water supply in one joint organization.PLC T 2024 04 - Tender for the Renovations of public convenience in Ġnien Madre Teresa ta’ Kalkutta, aiming to energy and environmental performance standards
Pembroke Local CouncilPEMBROKEThe subject of this tender is for renovations of public convenience in Ġnien Madre Teresa ta’ Kalkutta, aiming to energy and environmental performance standards. Works include: • Supply and install plumbing system • Supply and install foul water system • Supply and install sanitary ware and fittings • Supply and install HPL Partitions and Doors • Supply and install ceramic tiling
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 31. August 2026.
- Who is the contracting authority?
- The contracting authority is KD VODOVOD I KANALIZACIJA d. o. o..
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.