KD VODOVOD I KANALIZACIJA d. o. o.RijekaTED
Rehabilitation of water supply pipelines; construction of the Skrad public sewer system
The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supportin...
Pipeline Construction, Sewer Construction, Water Supply
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- KD VODOVOD I KANALIZACIJA d. o. o.
- Published:
- August 05, 2026
- Deadline:
- September 01, 2026
- Topic:
- Pipeline Construction
- Object:
- Kanalnetz / Abwasserkanal
Object classification
- Kanalnetz / AbwasserkanalPrimary
- Trinkwasserleitung / Versorgungsnetz
Tender description
The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock49 details capturedDocuments
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Rehabilitation of water supply pipelines; construction of the Skrad public sewer system
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Aug 31The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Aug 31Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Sep 01Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.Reconstruction of the Sanitary Sewer System of Kutaisi
LVL technologies GmbH & Co KGCrailsheimLot 1: KWWP Construction of Sewer System Phase 1/01: Construction of wastewater collection gravity lines with a length of 79.94 km and 3500 house connections; Lot 2: KWWP Construction of Sewer System Phase 1/02: Construction of wastewater collection gravity lines of 61.97 km and 6.67 km pressure lines, two pumping stations in the capacity of (1) Q=1.75 l/s, H=41m, and (2) Q=20l/s, H=47m, and 3300 house connections.Connection of Townawilly Group Water Scheme Co-Operative Society to the Public Water Supply
Donegal County Council_1193LiffordThis project involves upgrading and restructuring the water supply infrastructure in the Townawilly area. The aim is to improve water quality, ensure compliance with regulatory standards, and deliver a more efficient and reliable water network. The contract includes the design and construction of an interconnector water main to connect the existing scheme to the Public Water Supply Scheme (PWSS) operated by Uisce Éireann (UÉ), which will allow for the decommissioning of the Townawilly Group Water Scheme (GWS) Water Treatment Plant. The contract also involves key upgrades to UÉ infrastructure, including construction of new watermain connections and a new booster pump station (PS) at the Glencoagh Storage Reservoir (SR) site to serve both the Glencoagh and Eddrim Glebe networks. Additionally, the Eddrim Glebe PS will be upgraded with new pumps and a change in the pumping arrangement.The Connection of Letterbrick to the Public Water Supply
Donegal County Council_1193LiffordDeadline: Sep 09Donegal County Council wishes to appoint an Engineering Services Provider (ESP) for the design of interconnector watermains for households and private Group Water Schemes (GWSs) located in Letterbrick to the closest point on the Public Water Supply, or other suitable location as determined by UÉ. The service is to include for all Civil and Hydraulic Design services as required; any environmental / ecological evaluations required; preparation and submission of any planning applications required; preparation of construction tender docs, administration of tender process (publication, clarifications, evaluation, etc.); award and management of construction contract. The ESP will also be required to act as PSDP for the Project.Reserve water project Gjøvik‑Biri – Raw water pump station (V2)
Gjøvikregionen - AnskaffelserGJØVIKDeadline: Aug 21Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.The public enterprise was established to enable the integration of the primary and secondary networks, protection of Lake Ohrid, and regulation of water supply in one joint organization.
JP VODOVOD I KANALIZACIJA StrugaStrugaDeadline: Aug 24The public enterprise was established to enable the integration of the primary and secondary networks, protection of Lake Ohrid, and regulation of water supply in one joint organization.BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Gjøvikregionen - AnskaffelserGJØVIKGjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.PLC T 2024 04 - Tender for the Renovations of public convenience in Ġnien Madre Teresa ta’ Kalkutta, aiming to energy and environmental performance standards
Pembroke Local CouncilPEMBROKEThe subject of this tender is for renovations of public convenience in Ġnien Madre Teresa ta’ Kalkutta, aiming to energy and environmental performance standards. Works include: • Supply and install plumbing system • Supply and install foul water system • Supply and install sanitary ware and fittings • Supply and install HPL Partitions and Doors • Supply and install ceramic tiling
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 01. September 2026.
- Who is the contracting authority?
- The contracting authority is KD VODOVOD I KANALIZACIJA d. o. o..
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.