New: market reports on German public procurement Read the report

Tipperary County CouncilClonmel, NenaghTED

Single Party Framework Agreement for Engineering Consultancy Led, Single Point, Multi-Disciplinary Design Team for the Lisbunny Link Road

Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties o...

Submission deadline: October 08, 2026Type: Tender

Civil Engineering Design, Geotechnical Surveys, Surveying, Health & Safety Coordination (SiGeKo), Traffic Planning

Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
Tipperary County Council
Published:
September 02, 2026
Deadline:
October 08, 2026
Topic:
Civil Engineering Design

Tender description

Show full description

Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211. The proposed new extension is approximately 350 metres in length. Options for the upgrade of the existing L5146 are to be examined and designed within the brief also. The length of existing road potentially to be upgraded is approximately 550 metres. This tender is for the establishment of a Single Party Framework Agreement and the initial contract being for CWMF Stages (i) to (iii). Subsequent Stages may be called off from the Framework. See Service Requirements for further details .

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

7 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

10

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 08. Oktober 2026.
Who is the contracting authority?
The contracting authority is Tipperary County Council.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Next step

Get full access to this tender

Access all documents for "Single Party Framework Agreement for Engineering Consultancy Led, Single Point, Multi-Disciplinary Design Team for the Lisbunny Link Road" from Tipperary County Council and keep track of deadlines and submission guidelines.

Deadline tracked until October 08, 2026No credit card required