N-ERGIE AktiengesellschaftNürnberg
Seismic Measurements According To The Project: Deep Geothermal Energy Nuremberg
The Contractor must acquire a 110 km 2D seismic survey in the Nuremberg license area, including planning, surveying, permitting support, a wireless nodal system, and Vibroseis or explosive sources while providing qualified personnel and full survey, vibrator, drilling, and recording equipment. They are required to ensure high‑quality data...
Geotechnical Surveys, Surveying, Water Resource Management
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- N-ERGIE Aktiengesellschaft
- Published:
- July 30, 2026
- Deadline:
- Not specified
- Topic:
- Geotechnical Surveys
Tender description
Show full descriptionCollapse description
The Contractor must acquire a 110 km 2D seismic survey in the Nuremberg license area, including planning, surveying, permitting support, a wireless nodal system, and Vibroseis or explosive sources while providing qualified personnel and full survey, vibrator, drilling, and recording equipment. They are required to ensure high‑quality data acquisition through daily QC, in‑field processing, instrument testing, SEG‑Y compliance, strict adherence to HSE and environmental regulations, and proper maintenance of all systems without causing damage to infrastructure or protected areas. The performance objective is to deliver complete, accurate raw and processed seismic data sets—including SPS, PPV, maps, auxiliary files, and a final report—with all positioning, processing, and formats fully aligned with Company specifications and industry standards.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
4 data areas available
30 days free · no credit card · cancel anytime
Related tenders
10Seismic Measurements According To The Project: Deep Geothermal Energy Nuremberg
N-ERGIE AktiengesellschaftNürnbergThe Contractor is tasked with acquiring a 2D seismic survey of approximately 110 km to support deep geothermal exploration within the Nuremberg license area. This includes planning, surveying, permitting support, deployment of a wireless nodal recording system, and the use of Vibroseis and explosive sources where required. The Contractor must ensure high‑quality seismic data acquisition, including daily QC, in‑field processing, instrument tests, and compliance with SEG-Y data standards. All operations must follow strict HSE, environmental, and vehicle regulations and must avoid damage to infrastructure, property, and protected areas. The Contractor shall provide qualified personnel, full equipment (survey, vibrator, drilling, recording systems), and maintain all systems according to manufacturer specifications. The performance objective is to deliver complete, accurate, and high-quality seismic data sets (raw and processed), including SPS files, PPV data, maps, and a comprehensive final report. All positioning, processing, and data formats must meet the technical specifications defined by the Company and industry standards, ensuring comparability and reliability of results.Seismic Measurements According To The Project: Deep Geothermal Energy Nuremberg
N-ERGIE AktiengesellschaftNürnbergThe Contractor is tasked with acquiring a 2D seismic survey of approximately 110 km to support deep geothermal exploration within the Nuremberg license area. This includes planning, surveying, permitting support, deployment of a wireless nodal recording system, and the use of Vibroseis and explosive sources where required. The Contractor must ensure high‑quality seismic data acquisition, including daily QC, in‑field processing, instrument tests, and compliance with SEG-Y data standards. All operations must follow strict HSE, environmental, and vehicle regulations and must avoid damage to infrastructure, property, and protected areas. The Contractor shall provide qualified personnel, full equipment (survey, vibrator, drilling, recording systems), and maintain all systems according to manufacturer specifications. The performance objective is to deliver complete, accurate, and high-quality seismic data sets (raw and processed), including SPS files, PPV data, maps, and a comprehensive final report. All positioning, processing, and data formats must meet the technical specifications defined by the Company and industry standards, ensuring comparability and reliability of results.Provision of an airborne geophysical survey of the Rift Valley Basin in Ethiopia
Aarhus UniversitetAarhus CAarhus University seeks a contractor to carry out a large-scale airborne geophysical survey of the Rift Valley Basin in Ethiopia in early 2026, using a helicopter-based slung-load transient electromagnetic (TEM) system and magnetic instruments to map shallow and deep hydrogeological structures. Conducted in close partnership with the Ministry of Water and Energy of Ethiopia and Addis Ababa University, the survey aims to improve understanding of the Basin’s hydrogeological settings under different geological and environmental conditions. The contractor must collect high-resolution TEM and magnetic data, capable of imaging layers as thin as 3 meters near the surface and achieving penetration depths of up to 500 meters, while meeting strict technical, calibration, safety, and data-delivery requirements. The project includes joint flight-line planning, rigorous system testing and documentation, and delivery of data ready for processing in Aarhus Workbench, all within a maximum budget of 5,000,000 DKK.Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 07Art der Leistung 10037842-Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva Umfang der Leistung The contractor is tasked with delivering three key work packages, each with specific objectives and timelines: 1. Inception Report: The first deliverable will be an inception report that outlines the methodology and planning for the surveys. This report is aimed at establishing a clear framework for survey approaches, data collection, analysis as well as Midline and Endline report structure. Work on this report is set to commence in August 2026, ensuring adequate preparation and planning for the subsequent phases of the project. Regarding the qualitative data collection approach, the contracts should specify a qualitative method applicable to the indicators. The proposed methods may include Key Informant Interviews (KIIs), Focus Group Discussions (FGDs), and direct observation during site visits - are deployed in sequence across the three phases of data collection. Data is analysed thematically and triangulated with quantitative findings before results are finalised Moreover, the contractor will establish a comprehensive, verified, and evidence-based data collection that accurately measures employment, local value addition, export market performance, sustainability certification, MSME processing capacity and IAF service improvement across all targeted indicators. 2. Midline Assessment Report: The second deliverable will be a comprehensive mid-term assessment report, which will evaluate the progress and indicators achievement of the project to date. This report is expected to be finalized and submitted in the fourth quarter of 2026. It will include detailed findings, insights, and recommendations that will guide any necessary adjustments to the project's approach. 3. Endline Assessment Report: The final work package involves delivering a project end-term assessment report, expected in the fourth quarter of 2028. This report will conduct an in-depth analysis of the indicators" achievement, impact and effectiveness of the EU-German CAPSAFE intervention throughout the entire execution period. It will synthesize data collected over the course of the project and provide a thorough evaluation of the results achieved, to some extent offering valuable insights for future initiatives.Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 07Art der Leistung 10037842-Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva Umfang der Leistung The contractor is tasked with delivering three key work packages, each with specific objectives and timelines: 1. Inception Report: The first deliverable will be an inception report that outlines the methodology and planning for the surveys. This report is aimed at establishing a clear framework for survey approaches, data collection, analysis as well as Midline and Endline report structure. Work on this report is set to commence in August 2026, ensuring adequate preparation and planning for the subsequent phases of the project. Regarding the qualitative data collection approach, the contracts should specify a qualitative method applicable to the indicators. The proposed methods may include Key Informant Interviews (KIIs), Focus Group Discussions (FGDs), and direct observation during site visits - are deployed in sequence across the three phases of data collection. Data is analysed thematically and triangulated with quantitative findings before results are finalised Moreover, the contractor will establish a comprehensive, verified, and evidence-based data collection that accurately measures employment, local value addition, export market performance, sustainability certification, MSME processing capacity and IAF service improvement across all targeted indicators. 2. Midline Assessment Report: The second deliverable will be a comprehensive mid-term assessment report, which will evaluate the progress and indicators achievement of the project to date. This report is expected to be finalized and submitted in the fourth quarter of 2026. It will include detailed findings, insights, and recommendations that will guide any necessary adjustments to the project's approach. 3. Endline Assessment Report: The final work package involves delivering a project end-term assessment report, expected in the fourth quarter of 2028. This report will conduct an in-depth analysis of the indicators" achievement, impact and effectiveness of the EU-German CAPSAFE intervention throughout the entire execution period. It will synthesize data collected over the course of the project and provide a thorough evaluation of the results achieved, to some extent offering valuable insights for future initiatives.International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.RFI: Micro milling machine
KeskusrikospoliisiVantaaDeadline: Jul 29THIS IS NOT A PRELIMINARY NOTICE, A PROCUREMENT NOTICE, OR A CALL FOR TENDERS, BUT RATHER A REQUEST FOR INFORMATION / MARKET SURVEY. The market survey is being conducted to address issues related to a potential future equipment procurement by the National Bureau of Investigation. The purpose of the market survey is to gain an overview of the equipment and systems available on the market and to gather information for a potential future competitive tendering process. The objective of this request for information is to obtain details, in particular, regarding the equipment package along with its management applications and maintenance and support services. SYSTEM DESCRIPTION: Micro milling machine capable of both die and package level deprocessing of electronic components found in current consumer electronic devices including smart phones. The applications that the system is expected to cover: • Electronic component removal and board preparation • Package frontside decapsulation (Integrated Circuits) • Removal of electromagnetic shielding • PCB removal • Die backside thinning • Die frontside delayering SOFTWARE / USER INTERFACE REQUIREMENTS: Preferably the machine is a standalone system that can be operated without the need of an external computer. Additionally the user interface is expected to cover the following functionality: • Camera system that is used to select the area to be processed • Automated sample leveling • Capability to process warped circuit boards (contour processing) • Changing of the tool must be possible without using a wrench or spanner. • The positional accuracy is expected to be atleast 1µm. RESPONDING TO THE REQUEST FOR INFORMATION You may respond to the request for information by submitting materials related to the equipment. We ask suppliers interested in participating in the market dialogue to respond to the request for information by submitting materials related to the equipment no later than July 31, 2026, to the following address: [email protected]. Please use the following subject line in your message: “Market Survey: Micro milling machine”. If the response contains the supplier’s trade secrets or other confidential information, we ask the supplier to label the documents “Trade Secret”. Whether or not you respond to this market survey will not prevent you from participating in any future competitive tendering process. All responses to this market survey received from suppliers will be treated as preliminary, non-binding, and confidential. The information will be used solely for the purpose of preparing the procurement. All costs associated with submitting a response are at the respondent’s own expense and risk. The request for information does not oblige the National Bureau of Investigation to carry out the procurement in the manner described in the request, and the competitive bidding process may also be waived. The National Bureau of Investigation may use the responses provided if it decides to conduct a competitive tendering process for the procurement. The National Bureau of Investigation will make a decision on whether to conduct a competitive tendering process and on its timeline following the market survey. All information presented in the market survey is preliminary, is not binding on the National Bureau of Investigation, and may still change significantly during the preparation phase.International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is N-ERGIE Aktiengesellschaft.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.