The Multiple Sclerosis Society of IrelandDublinTED
Construction Works to The Multiple Sclerosis Society of Ireland Care and Respite Centre at 65 Bushy Park, Dublin 6
The project consist of two elements Block A Block B The facility at 65 Bushy Park is a Care and Respite Centre for people with Multiple Sclerosis. The existing facility comprises a number of buildings. There is a Main Building of two storeys to the front and this houses administrative offices. There is a single storey building to the West...
Demolition, Non-Residential Building
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- The Multiple Sclerosis Society of Ireland
- Published:
- August 13, 2026
- Deadline:
- Not specified
- Topic:
- Demolition
- Object:
- Pflegeheim / Seniorenheim
Object classification
- Pflegeheim / SeniorenheimPrimary
Tender description
Show full descriptionCollapse description
The project consist of two elements Block A Block B The facility at 65 Bushy Park is a Care and Respite Centre for people with Multiple Sclerosis. The existing facility comprises a number of buildings. There is a Main Building of two storeys to the front and this houses administrative offices. There is a single storey building to the West of the Main Building know historically as the Promotions Unit . This single storey building will be demolished to make space for a new two storey building called “Block A”. Block A will house offices at first floor and a multi use space at ground floor which will be accessible to the general public. The rear of the Main Building contains singles storey extensions built in the 1990’s and 2000’s. These extensions house the main Care Centre and are used for residents of the Care Centre only. It houses bedrooms and various therapy rooms plus some ancillary facilities. Within these extensions there is an existing Therapy Room to the East of the site which is to be extended as part of the project. This Extension is called “Block B”. All the buildings except the Promotions Unit which is to be demolished are to remain live and operating during the course of construction.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
9Construction of an extension to existing childcare service- a 208 square meter single storey build to the south of existing childcare centre
Cherry Orchard Community Childcare CLGCherry OrchardDeadline: Aug 28The extension is to be a 208 square meter single storey build to the south of existing childcare centre compromising two classrooms and associated service spaces including adjoining sleep rooms, changing rooms, a plant room and a therapy room including all necessary external works as detailed in the Volume A Works RequirementsExpansion of Kvernaland welfare centre - construction work - EP01
Time KommuneBRYNEDeadline: Aug 07Time municipality shall expand Kvernaland welfare centre with 27 new places. The places shall be organised as book collectives, divided in three departments. Each department consists of nine bed rooms connected to a common living room. The extension shall be adapted to the user group, which primarily consists of elderly persons with dementia, and emphasis will be put on a homely design, good accessibility and robust solutions. The tenders will be published as joint contracts, this tender documentation is for timber. Address: Gamle Åslandsvegen 27, 4355 KvernalandOn the property Gamle Åslandsvegen 25-27, there are the following existing buildings: Children and respite care home with seven places, moved in March 2015Care centre with 24 places, moved in September 2015, Parent initiative with 7 places, moved in January 2017 The expansion is formed as a horse shoe, partly on one floor and partly over two floors. The total area of use (BRA) for the expansion is 2,156 m². A closed sensory garden will form a closed sensory garden with an outer wall in the existing sheltered care centre. In addition: A joint shed with superstructure bicycle parking (BRA: 129 m²) Expansion of the technical building (approx. 15 m²) HVAC installations, An outdoor facility with expanded parking for both bicycles and car Development of a sensory garden and other outside areas shall be constructed.Finglas Primary Care Centre
Health Service Executive (HSE)KildareDeadline: Sep 24New build, four-storey with roof plant level, gross internal area approximately 10,517 sqm. The development comprises a HSE Primary Care Centre and GP block with a Tusla child and family agency office in the north-east block, served by two internal landscaped courtyards. The main public entrance is located on the south elevation off a new access road, with a secondary 7-day access entrance on the west elevation off Cardiffsbridge Road. The building is constructed over five levels with finished floor levels rising from 61.000m at Level 00 to 76.800m at Level 04, with roof plant set back 3.5m from the facade and screened at Level 04. External works include a connection to the new access road, 88 car parking spaces, 64 sheltered cycle spaces, hard and soft landscaping and all associated site and enabling works.Installation of New Biomass Heating System at Aura Leisure Centre, Letterkenny
Donegal County Council_1193LiffordDeadline: Aug 17Installation of 500kW Biomass Boiler at Aura Leisure Centre including associated mechanical and electrical works to operate and connect to existing heating system and construction of a flue pipe. Storage, loading and thermal storage systems to be installed as part of the works. DCC are novating the design responsibility of the Contract to the main contractor who can propose either an alteration and refurbishment of the existing Biomass system which has been out of use since 2014 due to a basement system which was flooded or a new stand alone system. Alterations to the existing boiler house for the main building is also to be included in the scope of works and this is outlined in the technical specification including a new pressurisation system to be installed.Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford
Scoil Mhuire NS MooncoinMooncoinDeadline: Aug 21Procurement of a main building contractor for the construction of single storey SEN extensions at both the Junior and Seniors schools Scoil Mhuire NS Mooncoin Co Waterford including all associated site works.Consultancy Services for Main Pier Repair Works at An Daingean Fishery Harbour Centre, Dingle, Co. Kerry, Ireland
Department of Agriculture Food and the MarineDublinDeadline: Sep 04The purpose of this project is to assess and execute essential repairs to the structural components of the Main Pier at An Daingean Fishery Harbour Centre.Multi- Party Framework Agreement for HSE West Employers Representative Services - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareMulti- Party Framework Agreement for HSE West Employers Representative Services Framework 2025 - Framework 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West region (Galway, Mayo and Roscommon). The Initial project will consist of the construction of a new build 75 bed Community Nursing unit (CNU) within the Ballina District Hospital campus with direct linkages into the existing Ballina District Hospital. The new build 75 bed Community Nursing unit (CNU) will consist of 3 floors with 25 single ensuite bed room accommodation to HIQA standards for Residential Care Settings for Older People in Ireland at each level Ground Floor, First Floor, Second Floor (level 0,1, 2) along with linkages to existing hospital street, new stairways, service lift and new 2 Nr. Bed Lifts, including new carpark areas, etc. Note: on the Ground Floor there will be 10 single ensuite bedrooms which will be allocated to residents with dementia. There will also be extensive re-planning, upgrade works and reconfiguration of the existing district hospital female wing including physiotherapy area within the single storey and the two-storey central building structure, to provide commercial production kitchen with ancillary support rooms, physiotherapy area, laundry, staff changing and Day-care Services, etc; to complete the interface works with new the 75-bed CNU unit on site. The floor area of this project is in the region of 7,960 m2 which consists of the following: Demolishing the existing building structure on site, Construction and fit-out of a new 75 bed Community Nursing unit over 3 floors and roof top M E Plant room include extensive garden areas for the CNU, Refurbishment of the Existing Main District Hospital, Construction of new Car parking areas on site, Construction of a new Sub-station building including generator room and the Construction of a new medical building. Each element of building works, Demolishing, Diversion of Underground Services, coFire Remediation Works at Belarmine, Dublin 18
Clúid Housing AssociationDublinDeadline: Aug 07The project involves the execution of fire remediation works to an existing 53-unit residential development located at Belarmine Ave, Stepaside, Dublin 18, on behalf of the client, Clúid Housing. The objective of the works is to address identified fire safety deficiencies in order to bring the building into compliance with current fire protection and life safety standards outlined in TGD Part B (Fire Safety) of the Building Regulations and other relevant codes such as IS 3218:2913 for fire alarm systems. The development consists of occupied apartment units located above a ground floor level containing commercial units, which are excluded from the scope of this contract. The scope of the remediation works includes, but is not limited to: • Installation of fire-stopping systems at service penetrations and wall/floor junctions. • Replacement or upgrade of fire-rated doors, closers, and seals to comply with TGD-B. • Retrofitting of cavity barriers around gas flues and at every floor level. • Building a bin store in the basement with a ventilation system. • Fire alarm cable rerouting and improvements to service risers and shafts. • Sealing of socket/switch boxes within fire-rated partitions. • General improvement of compartmentation and passive fire protection measures. All works will be undertaken within a live residential environment, requiring a high level of coordination to minimise disruption to residents.Provision of Multidisciplinary Consultancy Services for the Design and Construction Administration (RIBA Workstages 1-6) of a New Car Parking Project at the United Nations Office at Nairobi (UNON), Kenya
UN SecretariatKenyaDeadline: Sep 01Introduction UNON is seeking multidisciplinary professional consultancy services to undertake RIBA Workstages 1 to 6 for a New Car Parking Project at the UNON Complex, Gigiri, Nairobi Kenya, including a feasibility study to assess the most suitable development options. The multidisciplinary services shall include but not be limited to Architecture, Structural & Civil Engineering, Mechanical Engineering, Electrical Engineering (including expertise in Photovoltaic Systems), ICT Engineering, Fire Safety Engineering, Cost planning and Estimating services and Landscaping. Due to the multidisciplinary nature of the requirement, it is anticipated that the services will be provided based on: - A single consultancy which can offer all the disciplines from its in-house capabilities. - A single consultancy which is acting lead as consultant and is offering some of the disciplines on a sub-consultancy basis: in this instance, the lead consultant shall be providing the architectural discipline. - A consortium or joint venture arrangement: again, one company from the consortium or joint venture will be required to act as lead consultant, providing the architectural discipline. Project Scope The final project solution remains to be confirmed and shall be developed through the feasibility and design stages. The preferred solution may include one or more design solutions, but range from the provision of the following options: an open surface car park or carparks; an open two-storey car park structure; or a combined solution incorporating both open car parking and a two-storey car park structure. In all cases, the project will include all required vehicle and pedestrian connections to the existing adjacent site and infrastructure, with the potential to include solar photovoltaic canopies, which would cover the requirements for both parking spaces and renewable power. The project shall integrate all mentioned disciplines and shall cover all required services and infrastructure including the following: Mechanical (Plumbing, Cold Water System, Irrigation System, Wastewater Drainage System, Rainwater and Stormwater Management and Drainage System), Electrical (Power, Lighting, Photovoltaic System, ICT (Wi-Fi, Fiber optic), Security (CCTV, Access control), Public Address (PA) system (Fire Safety, Fire Suppression /Protection System, Smoke Detector System, Alarm System). Scope of Assignment The scope of the assignment comprises full consultancy services, including a feasibility study to assess and recommend the car parking solution best suited to UNON's operational, environmental, technical and cost requirements. The services shall also include but not be limited to site appraisal, preparation and brief, concept design, detailed design and spatial coordination, technical design, construction documents including drawings, specifications and bills of quantities sufficient for tender and construction purposes, services during the tender/ bid process and services during the construction, handover and close out of the construction contract works. It is expected that the various project stages will follow the RIBA plan of works and include the following -which, even if not exhaustive, are a guide to stage activities: - RIBA Workstage 1 (Preparation and Brief, including a feasibility study to assess and recommend the most suitable car parking solution through various options); - RIBA Workstage 2 (Concept Design); - RIBA Workstage 3 (Spatial Coordination); - RIBA Workstage 4 (Technical Design); - RIBA Workstage 5 (Manufacturing and Construction); - RIBA Workstage 6 (Handover and Close Out). The selected Multidisciplinary Consultancy Firm or Consortium is to have the core project team delivering each of the work stages based in Nairobi. The core project team's presence in Nairobi shall be for the duration of the contract and extend for at least one month past the end of the defect liability period. Resource Requirements For the services describe
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is The Multiple Sclerosis Society of Ireland.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.