Clúid Housing AssociationDublinTED
Fire Remediation Works at Belarmine, Dublin 18
The project involves the execution of fire remediation works to an existing 53-unit residential development located at Belarmine Ave, Stepaside, Dublin 18, on behalf of the client, Clúid Housing. The objective of the works is to address identified fire safety deficiencies in order to bring the building into compliance with current fire pr...
Dry Construction, Electrical Installation, Fire Protection, Windows & Doors
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Clúid Housing Association
- Published:
- July 06, 2026
- Deadline:
- August 07, 2026
- Topic:
- Dry Construction
- Object:
- Mehrfamilienhaus / Wohnblock
Object classification
- Mehrfamilienhaus / WohnblockPrimary
Tender description
Show full descriptionCollapse description
The project involves the execution of fire remediation works to an existing 53-unit residential development located at Belarmine Ave, Stepaside, Dublin 18, on behalf of the client, Clúid Housing. The objective of the works is to address identified fire safety deficiencies in order to bring the building into compliance with current fire protection and life safety standards outlined in TGD Part B (Fire Safety) of the Building Regulations and other relevant codes such as IS 3218:2913 for fire alarm systems. The development consists of occupied apartment units located above a ground floor level containing commercial units, which are excluded from the scope of this contract. The scope of the remediation works includes, but is not limited to: • Installation of fire-stopping systems at service penetrations and wall/floor junctions. • Replacement or upgrade of fire-rated doors, closers, and seals to comply with TGD-B. • Retrofitting of cavity barriers around gas flues and at every floor level. • Building a bin store in the basement with a ventilation system. • Fire alarm cable rerouting and improvements to service risers and shafts. • Sealing of socket/switch boxes within fire-rated partitions. • General improvement of compartmentation and passive fire protection measures. All works will be undertaken within a live residential environment, requiring a high level of coordination to minimise disruption to residents.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Fire Compliance Works to 35 number apartments at Castleforbes Square, Mayor Street Upper, North Wall, Dublin 1
Tuath Housing Association LtdDublinDeadline: Jul 15The Scope of Works encompasses fire compliance works comprising upgrading to the top of the entrance hallway walls, firestopping of the service penetrations across the entrance hallway walls and above the apartment front doors and fire stopping of vertical penetrations through the compartment floor and upgrading elements related to the fire rated doors and upgrades to the landlord detection.Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.
Tuath Housing Association LtdDublinDeadline: Sep 01The Scope of Works encompasses fire compliance works comprising upgrading to the top of the entrance hallway walls, firestopping of the service penetrations across the entrance hallway walls and above the apartment front doors and fire stopping of vertical penetrations through the compartment floor and upgrading elements related to the fire rated doors and upgrades to the landlord detection.Prior Information Notice - Fire Safety Systems upgrade works at Scoil Iosa, Oranmore, Co Galway
Scoil Iosa OranmoreGalwayDeadline: Jun 26Prior Information Notice - Fire Safety Systems upgrade works at Scoil Iosa, Oranmore, Co Galway. School building affected by the works include the Modular Buildings and 'Old School Building'. Works include upgrade of Fire Alarm, Emergency Lighting, new LED lighting and General Services.Contract for Building Works at Port Centre for Dublin Port Company
Dublin Port Company_411DublinThe work will include the appointment of a contractor to carry out: - Fire Cert and associated works. - DAC and associated works. - New alterations to the ground floor, reception, and mezzanine. - Essential repair works to the fifth floor to improve insulation and resolve water ingress issues. - Upgrade the fifth floor by removing and raising the existing roof, replacing the external façade with a new louvred façade allowing the floor plate to extend out to the perimeter - Upgrade building fabric and services to meet 2050 energy targets. - Alterations to lower ground floor to include new shared facilities, larger meeting room, changing facilities, etc - Office internal fit-out and new partitions and ceilings are to be upgraded. - MEP works: - Update Fire Alarm - Install Fire Fighting Lift - Install Smoke Extract System - Update Fire Fighting Services Generator - Update Services Local to Core - Ventilation, Water, Lighting - Upgrade M and E services to each floor plate to suit the new building envelope façade design. - Upgrade to M and E central plant (i.e. central heat pump etc.) - Upgrade sub-metering to tenant zones is required. - Provision of PV array to assure compliance with CAP 2030-2050 - External works.The Coombe Hospital: Passive Fire Works
The Coombe HospitalDublinDESIGN, SUPPLY, INSTALLATION, COMMISSION, CERTIFICATION AND MAINTENANCE OF PASSIVE FIRE SAFETY WORKS TO INCLUDE, (a) NEW FIRE DOOR ASSEMBLIES; AND (b) UPGRADE OF EXISTING FIRE DOOR ASSEMBLIES; AND (c) FIRE STOPPING/UPGRADING TO FIRE WALLS AND FIRE SEALING OF SERVICE PENETRATIONSCivil Remediation Works at IDA Parkmore West Business and Technology Park, Co. Galway
IDA IrelandDublinThe proposed works include remedial works to the road network, installation of new footpaths, installation of new road surfaces and some areas, replace existing services with new, fencing and all landscaping and ancillary works as specified in tender documentation and drawings.DCC - Multi Party Framework Agreement to undertake routine planned maintenance and refurbishment works of Dublin Fire Brigade Stations
Dublin City CouncilDublinDeadline: Aug 04Dublin City Council is establishing a Multi-Party Framework Agreement for main contractors for planned maintenance works to Dublin Fire Brigade Stations. The works envisaged are routine planned maintenance and refurbishment works. The typical works envisaged are as follows: - Localised repairs to fire stations (i.e. roofs, internal finishes (floors, ceilings, walls, partitions, etc) - Replacement/upgrade of sanitaryware - Deep cleaning of food preparation areas and appliances - Locker room upgrades - Decoration - Landscaping - Localised plumbing and heating repairs, station refurbishment and upgrade. This is not a finite list of works but serves as an indication of what works are envisaged. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8585770. Please note that this project is subject to funding.DCC - Prior Information Notice (PIN) to alert the market for the Establishment of a Single-party Framework Agreement for Architect Led Integrated Design Team Services for Fire Safety Remediation Works
Dublin City CouncilDublinDeadline: Aug 28This Prior Information Notice is to alert the market, this is not a call for competition. This is a Prior Information Notice (PIN) and not a call for competition; a call to competition may be placed within the next 12 months. Dublin City Council intends to invite submissions from Architect Led Integrated Design Teams with the expertise and competence related to the design and management of delivery of the fire safety remediation of existing, multi-storey, buildings of a variety of uses. This process is a statement of a potential Tendering process with the intention of establishing one (1) Single Party Framework during the next 12 months. Details of any individual procurements pursuant to this notice will be advertised in due course. Dublin City Council does not require a response to this Prior Information Notice. Dates within this notice are anticipated and may be adjusted prior to publishing. Please note that this is not a call for competition and no tender documents are available at this stage.Family Room Fit Out and Refurbishment Works for ICU North at Beaumont Hospital
Beaumont Hospital_403DublinDeadline: Jul 24The Contracting Authority intends to award a contract for fit-out and refurbishment works of an existing Family Room/Office Space in ICU North at Beaumont Hospital, Dublin 9. The facility, located on Level 3 next to the Intensive Care Unit, serves families of ICU patients and administrative staff. The current layout is sub-optimal due to a shared entrance. Further information is in the Invitation to Tender documentation available on www.etenders.gov.ie.Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
Iarnród Eireann-Irish RailDublinDeadline: Aug 25This is a call to competition by IE for the procurement of a Contractor for the Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. As part of the Glasnevin MetroLink Enabling Works Programme, a specialist Civils and Structures contractor is being procured to undertake both the detailed design and construction of key enabling works. The appointed contractor will play a key role in delivering the enabling works package, which will be undertaken in advance of, or in parallel with, the main MetroLink M100, M401 and M500 contracts and are critical to reducing programme risk, minimising disruption to existing rail services, and protecting the DART+ Programme.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 07. August 2026.
- Who is the contracting authority?
- The contracting authority is Clúid Housing Association.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.