Tipperary County CouncilClonmel, NenaghTED
Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works
The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (“live”) facility and shall include the integration of new and existing building elements, services, and system...
Architecture, Structural Engineering, Electrical Engineering Design, MEP Engineering, Construction Supervision
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Tipperary County Council
- Published:
- July 20, 2026
- Deadline:
- August 20, 2026
- Topic:
- Architecture
Tender description
Show full descriptionCollapse description
The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (“live”) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant’s Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost- effective solution in accordance with the Client’s requirements and applicable statutory standards
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Architect-Led Integrated Design Team for the redevelopment of Ballintober Holiday Lodge and Community Cafe and Termonbarry Creative Community and Tourism Hub
Roscommon County Council_424RoscommonTo design and oversee the redevelopment of two vacant/derelict buildings (former Garda Stations). The services provided shall include consultation and engagement, investigations, design of buildings and urban landscape, assigned certifier role, PSDP role, delivery through statutory planning processes, detailed design, cost planning, procurement, project management and certification of all required works. The commissioned services shall also include for provisions, coordination and management of all required consultancy services and specialist skills (Stages (ii), (iii), (iv) and (v)), namely Building, Urban Design and Landscape Architect; Civil, Structural, M and E, Building Services Engineering team, Fire Safety Consultant, Quantity Surveyor; Planning, Environmental Assessment, Archaeological, Architectural Heritage Impact Assessment ReportMulti-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots
Údarás Na Gaeltachta_289GalwayEstablishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally comprise of the following disciplines: - Architectural Services (lead for Architect Led IDT Services) and associated specialist skills, - Civil and Structural Engineering Services (lead for Engineering Led IDT Services) and associated specialist skills, - Building Services (Mechanical and Electrical) Engineering Services and - Quantity Surveying Services. The extent of other consultancy services and specialist skills service providers required for call-off commissions throughout the course of a Framework may vary depending on the range of services required. Call-off commissions may typically range from extension, refurbishment, repair, upgrade, new build, infrastructure and other type projects as required by the Contracting Authority within Gaeltacht regions. Scope of design services may extend from initial feasibility, through statutory approvals, full design to implementation and handover/close-out, and other technical services as may be required over the framework term. Each framework will be established for a period of three (3) years with the option to extend by one further year. Please refer to the enclosed documents for further particulars and requirements. A Prior Information Notice (PIN) was issued in respect of the above, reference: OJ S 94/2024 15/05/2024.Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services for Road Infrastructure and associated services at IDA Ballina
IDA IrelandDublinThe Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Planner, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover.Procurement of Architect Led Integrated Design Team for Áras an Chontae Ground Floor Civic Upgrade Project - including Council Chamber, Main Reception Foyer, meeting rooms, sanitary facilities, circul
Mayo County Council_1127CastlebarMayo County Council invites tenders from a suitably qualified architect-led integrated design team to deliver full consultancy services for the Áras an Chontae Ground Floor Civic Upgrade Project, including Council Chamber, Main Reception Foyer, meeting rooms, circulation routes, entrances/exits and accessibility upgrades. The project involves the refurbishment and reconfiguration of key public facing and civic spaces within the ground floor of Áras an Chontae, Castlebar, including the Council Chamber, Main Reception Foyer and three meeting rooms together with a coordinated review of internal circulation and building access arrangements. The design must address compliance with Fire Safety and Disability Access Certificate (DAC) requirements, including means of escape, accessible routes and entrance configurations. The scope extends to the assessment and upgrade of all ground floor entrances (three no.), internal corridors connecting the foyer and chamber, and the external interface of the building, including ramps, level access and approach routes. Services required include progression from preliminary design through detailed design, Part 8 statutory planning process, preparation of tender documentation, procurement of a contractor, and full construction stage services including contract administration and project close-out. The works will be delivered within a live operational civic building and will require careful consideration of phasing, stakeholder engagement and continuity of services.Provision of Multidisciplinary Consultancy Services for the Design and Construction Administration (RIBA Workstages 1-6) of a New Car Parking Project at the United Nations Office at Nairobi (UNON), Kenya
UN SecretariatKenyaDeadline: Sep 01Introduction UNON is seeking multidisciplinary professional consultancy services to undertake RIBA Workstages 1 to 6 for a New Car Parking Project at the UNON Complex, Gigiri, Nairobi Kenya, including a feasibility study to assess the most suitable development options. The multidisciplinary services shall include but not be limited to Architecture, Structural & Civil Engineering, Mechanical Engineering, Electrical Engineering (including expertise in Photovoltaic Systems), ICT Engineering, Fire Safety Engineering, Cost planning and Estimating services and Landscaping. Due to the multidisciplinary nature of the requirement, it is anticipated that the services will be provided based on: - A single consultancy which can offer all the disciplines from its in-house capabilities. - A single consultancy which is acting lead as consultant and is offering some of the disciplines on a sub-consultancy basis: in this instance, the lead consultant shall be providing the architectural discipline. - A consortium or joint venture arrangement: again, one company from the consortium or joint venture will be required to act as lead consultant, providing the architectural discipline. Project Scope The final project solution remains to be confirmed and shall be developed through the feasibility and design stages. The preferred solution may include one or more design solutions, but range from the provision of the following options: an open surface car park or carparks; an open two-storey car park structure; or a combined solution incorporating both open car parking and a two-storey car park structure. In all cases, the project will include all required vehicle and pedestrian connections to the existing adjacent site and infrastructure, with the potential to include solar photovoltaic canopies, which would cover the requirements for both parking spaces and renewable power. The project shall integrate all mentioned disciplines and shall cover all required services and infrastructure including the following: Mechanical (Plumbing, Cold Water System, Irrigation System, Wastewater Drainage System, Rainwater and Stormwater Management and Drainage System), Electrical (Power, Lighting, Photovoltaic System, ICT (Wi-Fi, Fiber optic), Security (CCTV, Access control), Public Address (PA) system (Fire Safety, Fire Suppression /Protection System, Smoke Detector System, Alarm System). Scope of Assignment The scope of the assignment comprises full consultancy services, including a feasibility study to assess and recommend the car parking solution best suited to UNON's operational, environmental, technical and cost requirements. The services shall also include but not be limited to site appraisal, preparation and brief, concept design, detailed design and spatial coordination, technical design, construction documents including drawings, specifications and bills of quantities sufficient for tender and construction purposes, services during the tender/ bid process and services during the construction, handover and close out of the construction contract works. It is expected that the various project stages will follow the RIBA plan of works and include the following -which, even if not exhaustive, are a guide to stage activities: - RIBA Workstage 1 (Preparation and Brief, including a feasibility study to assess and recommend the most suitable car parking solution through various options); - RIBA Workstage 2 (Concept Design); - RIBA Workstage 3 (Spatial Coordination); - RIBA Workstage 4 (Technical Design); - RIBA Workstage 5 (Manufacturing and Construction); - RIBA Workstage 6 (Handover and Close Out). The selected Multidisciplinary Consultancy Firm or Consortium is to have the core project team delivering each of the work stages based in Nairobi. The core project team's presence in Nairobi shall be for the duration of the contract and extend for at least one month past the end of the defect liability period. Resource Requirements For the services describeProject Management (PM) Led Integrated Multi-Disciplinary Design Team Consultancy Services for the Provision of Infrastructure Delivery for IDA Ireland
IDA IrelandDublinIDA Property Division seeks a Project Management Led Integrated Multi-Disciplinary Design Team for infrastructure delivery. The team will manage consultancy services for design and delivery of an access road extension and utility connections (electricity, water, drainage, gas) at IDA Science and Technology Park, Dundalk, Co. Louth. Required team includes Project Manager, Civil/Structural/Design Engineers, Quantity Surveyor, PSDP, Assigned Certifier, Landscape Architect, and specialist advisors. Full details in tender documents. Responses in zip format.Multi-Supplier Framework Agreement for Architect Led Design Team Services for the Provision of Design Build Social and Affordable Residential Developments
Roscommon County Council_424RoscommonCounty Wide Design Build Housing Delivery Multi-Supplier Framework Agreement for Architect Led Design Team Services for the Provision of Design Build Social and Affordable Residential Developments -including associated buildings such as community facilities - PCE111F For Stages i to Stage vMeath Co Co - MH-RREG-26-02 - Multi-Party Framework for Architect-Led Multidisciplinary and Integrated Design Team Services for schemes that come under the directorate of Rural Regeneration
Meath County CouncilNavanEstablishment of a Multi-Party Framework for Architect-Led Multidisciplinary and Integrated Design Team Services for schemes that come under the directorate of Rural Regeneration. Initial Contract is: Multidisciplinary Architect-Led Project Team Services For Kenlis Place Theatre and Public RealmArchitect led Integrated Multidisciplinary Design Team Services including PSDP and QS for a new fire station in Finner, Ballyshannon, Co. Donegal. Along with an extension to Letterkenny Fire Station.
Donegal County Council_1193LiffordDeadline: Jul 30Donegal County Council are seeking an architect-led design team to provide consultancy services for the design and construction of a new 3-bay fire station in Finner, Ballyshannon, Co. Donegal, along with a standalone extension at Fire Brigade Headquarters in Letterkenny, Co. Donegal.DCC - Prior Information Notice (PIN) to alert the market for the Establishment of a Single-party Framework Agreement for Architect Led Integrated Design Team Services for Fire Safety Remediation Works
Dublin City CouncilDublinDeadline: Aug 28This Prior Information Notice is to alert the market, this is not a call for competition. This is a Prior Information Notice (PIN) and not a call for competition; a call to competition may be placed within the next 12 months. Dublin City Council intends to invite submissions from Architect Led Integrated Design Teams with the expertise and competence related to the design and management of delivery of the fire safety remediation of existing, multi-storey, buildings of a variety of uses. This process is a statement of a potential Tendering process with the intention of establishing one (1) Single Party Framework during the next 12 months. Details of any individual procurements pursuant to this notice will be advertised in due course. Dublin City Council does not require a response to this Prior Information Notice. Dates within this notice are anticipated and may be adjusted prior to publishing. Please note that this is not a call for competition and no tender documents are available at this stage.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 20. August 2026.
- Who is the contracting authority?
- The contracting authority is Tipperary County Council.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.