Mayo County Council_1127CastlebarTED
Procurement of Architect Led Integrated Design Team for Áras an Chontae Ground Floor Civic Upgrade Project - including Council Chamber, Main Reception Foyer, meeting rooms, sanitary facilities, circul
Mayo County Council invites tenders from a suitably qualified architect-led integrated design team to deliver full consultancy services for the Áras an Chontae Ground Floor Civic Upgrade Project, including Council Chamber, Main Reception Foyer, meeting rooms, circulation routes, entrances/exits and accessibility upgrades. The project invo...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Mayo County Council_1127
- Published:
- August 09, 2026
- Deadline:
- Not specified
Tender description
Show full descriptionCollapse description
Mayo County Council invites tenders from a suitably qualified architect-led integrated design team to deliver full consultancy services for the Áras an Chontae Ground Floor Civic Upgrade Project, including Council Chamber, Main Reception Foyer, meeting rooms, circulation routes, entrances/exits and accessibility upgrades. The project involves the refurbishment and reconfiguration of key public facing and civic spaces within the ground floor of Áras an Chontae, Castlebar, including the Council Chamber, Main Reception Foyer and three meeting rooms together with a coordinated review of internal circulation and building access arrangements. The design must address compliance with Fire Safety and Disability Access Certificate (DAC) requirements, including means of escape, accessible routes and entrance configurations. The scope extends to the assessment and upgrade of all ground floor entrances (three no.), internal corridors connecting the foyer and chamber, and the external interface of the building, including ramps, level access and approach routes. Services required include progression from preliminary design through detailed design, Part 8 statutory planning process, preparation of tender documentation, procurement of a contractor, and full construction stage services including contract administration and project close-out. The works will be delivered within a live operational civic building and will require careful consideration of phasing, stakeholder engagement and continuity of services.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works
Tipperary County CouncilClonmel, NenaghDeadline: Aug 20The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (“live”) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant’s Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost- effective solution in accordance with the Client’s requirements and applicable statutory standardsIntegrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal
Donegal County Council_1193LiffordDeadline: Aug 23The Client invites tenders to undertake the Design, specification, procurement, supervision and overall project management of the following proposed works including but not limited to; Construction of a municipal cemetery to include burial space for approximately 2,500 plots; memorial garden to include repositories / columbarium for ashes; reception/office admin building tbc; memorial service building with public toilets incl. connection to public mains alternatively on site treatment; maintenance/operations/storage building and service yard; roof mounted solar panels on any buildings constructed where feasible, on site parking provision; and all associated landscaping and drainage works including storm water attenuation. Vehicular access and egress to the cemetery will be from Leck Road via a new entrance to the site. Pedestrian/cycle connection and integration with the new Southern Network Roads project. The project requires the services of a design team with appropriate previous experience to lead the project through the five stages of the Capital Works Management Framework to develop the siteFCC/120/19 Multiparty framework for Architect led Integrated Conservation Design Team Services with initial projects
Fingal County Council_371DublinEstablish a multiparty framework for Architect led Integrated Conservation Design Team Services related to heritage buildings, monuments, buildings, structures and landscapes including public buildings within the County. The initial commission will be for condition reporting, feasibility, design, planning and management of heritage related works at three sites; 1)Bremore Castle, 2)Skerries Mills 3) The Seamus Ennis Arts Centre The Multi Party Framework will be made available for use by Dun Laoghaire Rathdown County Council, South Dublin County Council, Dublin City Council and Wicklow County Council also.Multi-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots
Údarás Na Gaeltachta_289GalwayEstablishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally comprise of the following disciplines: - Architectural Services (lead for Architect Led IDT Services) and associated specialist skills, - Civil and Structural Engineering Services (lead for Engineering Led IDT Services) and associated specialist skills, - Building Services (Mechanical and Electrical) Engineering Services and - Quantity Surveying Services. The extent of other consultancy services and specialist skills service providers required for call-off commissions throughout the course of a Framework may vary depending on the range of services required. Call-off commissions may typically range from extension, refurbishment, repair, upgrade, new build, infrastructure and other type projects as required by the Contracting Authority within Gaeltacht regions. Scope of design services may extend from initial feasibility, through statutory approvals, full design to implementation and handover/close-out, and other technical services as may be required over the framework term. Each framework will be established for a period of three (3) years with the option to extend by one further year. Please refer to the enclosed documents for further particulars and requirements. A Prior Information Notice (PIN) was issued in respect of the above, reference: OJ S 94/2024 15/05/2024.Provision of Integrated Design Team Services and a Project Controls Team for Development of New Pharmacy and Veterinary Medicine Buildings on behalf of South East Technological University
South East Technological University (SETU)WATERFORDSouth East Technological University invites suitably qualified Consultant Teams to tender for Architect Led Integrated Design Team (IDT) and Project Manager Led Project Controls Team (PCT) Services (including other services) associated with the development of new Pharmacy and Veterinary Medicine buildings. The project will be tendered in two separate lots. The project includes the development of two buildings at two separate locations. The first is a combined Pharmacy and Veterinary Medicine academic building totaling circa 2,000M², and is located on the former Waterford Crystal site on the Cork Road, Waterford. The second buildings is a circa 1,000M² Anatomy and Pathology facility located at Teagasc's Kildalton Campus in Piltown, Co Kilkenny. On foot of this procurement procedure South East Technological University (the ‘ Contracting Authority’) seeks to award a Contract for the provision of Lot 1 Architect Led Integrated Design Team (IDT) and Lot 2 Project Manager Led Project Controls Team (PCT) via a two stage, restricted competition for the proposed Pharmacy and Veterinary Medicine Project (the 'Project'). Further details regarding the project are set out within the SAQ documents attached to this notice. The Project Information Memorandum (PIM) should be read in conjunction with the QC2-Part 1 and 2, and the Standard Conditions of Engagement for Consultancy Services (Technical). Responses must be submitted via the electronic postbox available on www.etenders.gov.ie by the response deadline. Only responses submitted to the electronic postbox will be accepted. Responses submitted by any other means (including but not limited to by email, fax, post or hand delivery) will NOT be accepted. Responses submitted late will NOT be accepted.Establishment of a Single Supplier Framework of MEP Led Design Team for Small and Minor Work Process Projects at Tyndall National Institute, UCC
University College CorkCorkThis Tender is to establish a Single Supplier Framework of MEP Led Design Team for Small and Minor Process Works Projects at Tyndall National Institute, UCC to whom specific tasks will be awarded on an exclusive basis based on the terms of a framework agreement, a copy of which will be issued with the tender documents. The team will comprise the following services. • Mechanical, Electrical and Process Engineering Services (MEP); • Employers Representative • Project Supervisor Design Process The Framework Agreement will be established on foot of competitive tenders received for the above services based on Notional Hours and rates for various disciplines as detailed in the Pricing Document Typically, projects will range in construction value from €5k to €3M however there may be exceptions whereby the construction value may be outside this range. The following are the higher value projects scheduled for coming years that the MEP Led Design Team may be assigned to: • Silicon Fab - Block A Scrubber Replacement • Silicon Fab - Old Training Fab conversion to Cleanroom • Silicon Fab - Refurbishment including demolition of room in subfab • Block C and Silicon Fab - Process Tool Hook Up • Old Boiler house Upgrade including Gas Stores • Waste Water Treatment“Construction works for the Basic project for the Upgrade of the Markova Noga Police Station on construction plot 1.1.3 of the Urban Design for Buildings of State importance for the Border Crossing “Markova Noga-Lemos” 2nd phase of the implementation of the Basic Project for the construction of the facility “Border Crossing Markova Noga - Lemos” with technical number 0308-661-777/2022 of 11.2022”
Ministry of internal affairsSkopjeDeadline: Sep 21Short description of the contract: Works contract involves the reconstruction and upgrade of the existing Border Police facility located near Markova Noga, in the village of Dolno Dupeni, adjacent to the Greek border. The current structure, originally built in the mid-20th century and previously used by the JNA, consists of three connected modules of varying construction types. Following inspections and structural assessments, the design proposes retaining the left and right modules while demolishing the central section to create a new entrance hall, stairway, and access points. The renovation will include a new roof, upgraded structural elements, and a covered courtyard serving as the main entry and parking area. The interior layout is planned to support the station’s operational needs, including offices, storage, reception, and duty areas, while the new upper floor will house administrative offices, staff facilities, restrooms, and a communal space with a kitchen and terrace. Additionally, a covered walkway will connect this building with the nearby Border Crossing (BC) complex used by both the Border Police and Customs. Parking provisions include one nearby public space and four official spaces within the plot. Works will be implemented following the PRAG Conditions of Contract. Type of procedure: Open“Construction works for the Basic project for the Upgrade of the Markova Noga Police Station on construction plot 1.1.3 of the Urban Design for Buildings of State importance for the Border Crossing “Markova Noga-Lemos” 2nd phase of the implementation of the Basic Project for the construction of the facility “Border Crossing Markova Noga - Lemos” with technical number 0308-661-777/2022 of 11.2022”
Ministry of internal affairsSkopjeDeadline: Sep 21Short description of the contract: Works contract involves the reconstruction and upgrade of the existing Border Police facility located near Markova Noga, in the village of Dolno Dupeni, adjacent to the Greek border. The current structure, originally built in the mid-20th century and previously used by the JNA, consists of three connected modules of varying construction types. Following inspections and structural assessments, the design proposes retaining the left and right modules while demolishing the central section to create a new entrance hall, stairway, and access points. The renovation will include a new roof, upgraded structural elements, and a covered courtyard serving as the main entry and parking area. The interior layout is planned to support the station’s operational needs, including offices, storage, reception, and duty areas, while the new upper floor will house administrative offices, staff facilities, restrooms, and a communal space with a kitchen and terrace. Additionally, a covered walkway will connect this building with the nearby Border Crossing (BC) complex used by both the Border Police and Customs. Parking provisions include one nearby public space and four official spaces within the plot. Works will be implemented following the PRAG Conditions of Contract. Type of procedure: OpenExhibition Design, Manufacture and Fit-Out Services for Donegal Famine Heritage Centre CLG (trading as The Workhouse), Dunfanaghy, Co. Donegal
Donegal Famine Heritage CLG trading as ''The Workhouse Dunfanghy''DunfanaghyDeadline: Jul 20The Donegal Famine Heritage Centre CLG (trading as 'The Workhouse') seeks to appoint a suitably qualified service provider to deliver the final design, production, and fit-out of a modern museum exhibition at The Workhouse, Dunfanaghy, Co. Donegal. Project Context and Funding The Workhouse, Dunfanaghy has been awarded grant funding by Failte Ireland through the Coast-to-Coast Capital Investment Scheme. This project is a cornerstone of the organisation's strategy, which aims to quintuple visitor numbers and revenue by transforming the site into a premier, year round, all weather destination on the Wild Atlantic Way. Core Deliverables: The Service Provider will be responsible for the end-to-end delivery of the exhibition, including: Final Interpretive and Spatial Design: Utilising the provided Draft Interpretive Plan and Content Framework to develop a high-quality, universally accessible visitor journey across an envisaged five distinct zones. This includes proposing a creative repositioned layout for internal partition walls to optimise visitor flow, maximising physical wall space, and the design, off-site fabrication, and installation of a detailed, historically accurate physical scale model of the original Workhouse building and grounds to serve as a central interpretive anchor. Content and Language Management: Collaborating closely with the Workhouse Working Group to edit and finalise all exhibition scripts. Deliverables include fully bilingual (English and Irish/Gaeilge) printed and digital displays to ensure strict compliance with the Official Languages (Amendment) Act 2021, alongside a professionally recorded four-language self-guided audio tour delivered via both proprietary devices and web-hosted smartphone frameworks. Technological Integration: Procuring, programming, installing, and commissioning all multimedia and audio-visual (AV) elements. This includes immersive digital media treatments and a dedicated, high-capacity Digital Archive Explorer interactive kiosk. Physical Fit-Out, Enabling Works and Heating Upgrades: Managing the complete site preparation, including the safe demolition and lawful disposal off-site of legacy exhibition fixtures. Physical works include constructing agreed internal partition walls, executing all necessary first/second-fix electrical, and decorative trades, and installing a centralised ambient climate monitoring display (in reception area). The Service Provider must also supply and commission an active, humidity control solution (with a total prohibition on external stone wall penetrations) and supply and commission a modern, energy-efficient heating upgrade compliant with Regulation (EU) 2024/1103 for the exhibition space. Please note that all works, installations, and commissioning under this contract must be fully completed, validated, and handed over to the Contracting Authority by no later than 30th March 2027.Exhibition Design, Manufacture and Fit-Out Services for Donegal Famine Heritage Centre CLG (trading as The Workhouse), Dunfanaghy, Co. Donegal
Donegal Famine Heritage CLG trading as ''The Workhouse Dunfanghy''DunfanaghyDeadline: Jul 20The Donegal Famine Heritage Centre CLG (trading as 'The Workhouse') seeks to appoint a suitably qualified service provider to deliver the final design, production, and fit-out of a modern museum exhibition at The Workhouse, Dunfanaghy, Co. Donegal. Project Context and Funding The Workhouse, Dunfanaghy has been awarded grant funding by Failte Ireland through the Coast-to-Coast Capital Investment Scheme. This project is a cornerstone of the organisation's strategy, which aims to quintuple visitor numbers and revenue by transforming the site into a premier, year round, all weather destination on the Wild Atlantic Way. Core Deliverables: The Service Provider will be responsible for the end-to-end delivery of the exhibition, including: Final Interpretive and Spatial Design: Utilising the provided Draft Interpretive Plan and Content Framework to develop a high-quality, universally accessible visitor journey across an envisaged five distinct zones. This includes proposing a creative repositioned layout for internal partition walls to optimise visitor flow, maximising physical wall space, and the design, off-site fabrication, and installation of a detailed, historically accurate physical scale model of the original Workhouse building and grounds to serve as a central interpretive anchor. Content and Language Management: Collaborating closely with the Workhouse Working Group to edit and finalise all exhibition scripts. Deliverables include fully bilingual (English and Irish/Gaeilge) printed and digital displays to ensure strict compliance with the Official Languages (Amendment) Act 2021, alongside a professionally recorded four-language self-guided audio tour delivered via both proprietary devices and web-hosted smartphone frameworks. Technological Integration: Procuring, programming, installing, and commissioning all multimedia and audio-visual (AV) elements. This includes immersive digital media treatments and a dedicated, high-capacity Digital Archive Explorer interactive kiosk. Physical Fit-Out, Enabling Works and Heating Upgrades: Managing the complete site preparation, including the safe demolition and lawful disposal off-site of legacy exhibition fixtures. Physical works include constructing agreed internal partition walls, executing all necessary first/second-fix electrical, and decorative trades, and installing a centralised ambient climate monitoring display (in reception area). The Service Provider must also supply and commission an active, humidity control solution (with a total prohibition on external stone wall penetrations) and supply and commission a modern, energy-efficient heating upgrade compliant with Regulation (EU) 2024/1103 for the exhibition space. Please note that all works, installations, and commissioning under this contract must be fully completed, validated, and handed over to the Contracting Authority by no later than 30th March 2027.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Mayo County Council_1127.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.