Údarás Na Gaeltachta_289GalwayTED
Multi-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of cons...
Architecture, Structural Engineering, Electrical Engineering Design, MEP Engineering
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Údarás Na Gaeltachta_289
- Published:
- June 24, 2026
- Deadline:
- Not specified
- Topic:
- Architecture
Tender description
Show full descriptionCollapse description
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally comprise of the following disciplines: - Architectural Services (lead for Architect Led IDT Services) and associated specialist skills, - Civil and Structural Engineering Services (lead for Engineering Led IDT Services) and associated specialist skills, - Building Services (Mechanical and Electrical) Engineering Services and - Quantity Surveying Services. The extent of other consultancy services and specialist skills service providers required for call-off commissions throughout the course of a Framework may vary depending on the range of services required. Call-off commissions may typically range from extension, refurbishment, repair, upgrade, new build, infrastructure and other type projects as required by the Contracting Authority within Gaeltacht regions. Scope of design services may extend from initial feasibility, through statutory approvals, full design to implementation and handover/close-out, and other technical services as may be required over the framework term. Each framework will be established for a period of three (3) years with the option to extend by one further year. Please refer to the enclosed documents for further particulars and requirements. A Prior Information Notice (PIN) was issued in respect of the above, reference: OJ S 94/2024 15/05/2024.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock2 details capturedLots LOT-0001 · Lots LOT-0002
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock21 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10PIN for Establishment of a multi-party Integrated Design Team Framework
Trinity College Dublin the University of Dublin_336DublinDeadline: Jul 22Provision of a multi-party Integrated Design Team Framework Trinity College Dublin (“Trinity” / “TCD”) Capital Programmes Office has a need to establish an Integrated Design Team (“IDT”) Framework Panel (the “Framework” / “Panel”) to support the organisation’s capital works programme. The Framework adopts a multi-disciplinary model in which one Principal Service Provider (“PSP”) shall be nominated as Lead Consultant for each Call-Off, assuming responsibility for coordination and delivery of the Integrated Design Team. The Framework will provide a compliant, efficient, and high quality mechanism for appointing multi-disciplinary design teams across multiple projects over a defined period. It will ensure consistency of design quality, value for money, and adherence to procurement regulations. The Framework shall operate within the scope of the Capital Works Management Frameworks (“CWMF”) and National and EU procurement regulations.FCC/120/19 Multiparty framework for Architect led Integrated Conservation Design Team Services with initial projects
Fingal County Council_371DublinEstablish a multiparty framework for Architect led Integrated Conservation Design Team Services related to heritage buildings, monuments, buildings, structures and landscapes including public buildings within the County. The initial commission will be for condition reporting, feasibility, design, planning and management of heritage related works at three sites; 1)Bremore Castle, 2)Skerries Mills 3) The Seamus Ennis Arts Centre The Multi Party Framework will be made available for use by Dun Laoghaire Rathdown County Council, South Dublin County Council, Dublin City Council and Wicklow County Council also.Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services for Road Infrastructure and associated services at IDA Ballina
IDA IrelandDublinThe Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Planner, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover.Meath Co Co - MH-RREG-26-02 - Multi-Party Framework for Architect-Led Multidisciplinary and Integrated Design Team Services for schemes that come under the directorate of Rural Regeneration
Meath County CouncilNavanEstablishment of a Multi-Party Framework for Architect-Led Multidisciplinary and Integrated Design Team Services for schemes that come under the directorate of Rural Regeneration. Initial Contract is: Multidisciplinary Architect-Led Project Team Services For Kenlis Place Theatre and Public RealmMulti-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots (Lots 3 and 4) / Creatlacha Ilpháirtí d’Fhoirne Deartha Comhtháite faoi stiúir Ailtire agus Innealtóra i 2 mhír
Údarás Na Gaeltachta_289GalwayMulti-Party Framework für Integrated Design Team (IDT) Services in den Losen 3 (Architekt) und 4 (Ingenieur, Bau/Statik) für die Grafschaften Galway, Mayo und Meath. Rahmen mit bis zu 5 Bietern, Laufzeit 3 Jahre plus Option 1 Jahr. IDT umfasst Architektur, Bauingenieurwesen, Gebäudetechnik (HLS), Mengenermittlung. Projekte: Erweiterung, Sanierung, Reparatur, Modernisierung, Neubau, Infrastruktur. Leistungen von Machbarkeit bis Übergabe.Tender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare
Clare County CouncilEnnisDeadline: Jun 05Tender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare.Provision of Architect Led Design Team Consultancy Services for Design and Construction of Social Housing Scheme at Loughboy Park, Kilkenny
Kilkenny County Council_1185KilkennyDeadline: Jun 26Architect Led Design Team Consultancy Services for design and construction of social housing scheme at Loughboy Park, Kilkenny, covering stages (ii) to (v).RFT for the provision of Architect or Engineer led Design Team Consultancy Services.
Department of Housing Local Government and HeritageWexfordDeadline: Jul 15Provision of Architect or Engineer led Design Team Consultancy Services for the refurbishment and redevelopment of existing Marine Research Station at Rine, Burrin, Co. Clare and the Carran Field Study Centre, Fahee, Carron, Co. Clare.DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B
Dublin City CouncilDublinDeadline: Aug 26Dublin City Council (“DCC”, the “Contracting Authority”) intends to establish two (2) four-year contractor multi-party framework agreements, namely, Lot A Framework and Lot B Framework (the “Frameworks”) for the delivery of a significant programme of housing projects (the “Programme”) utilising primarily the Design and Build (DB) delivery model. The Programme will form an important component of DCC’s direct social and affordable housing delivery pipeline for the period 2026–2030, consistent with the objectives set out in the Government’s new national housing plan, Delivering Homes, Building Communities. DCC has engaged the National Development Finance Agency (“NDFA”) to support the procurement and delivery of the Programme. 26 no. sites comprising approximately 4,000 units have been identified for inclusion in the Programme. Further sites may be added to the Programme over the lifetime of the Frameworks. The Frameworks will be established using a 2-stage restricted procurement procedure and will consist of the Lot A Framework and the Lot B Framework, with suitably qualified contractors appointed to each of the Frameworks. The Lot A Framework call off contracts capex values range from €100m to €250m, while call-off contracts under the Lot B Framework will have capex values of up to €100m. These capex value ranges may be adjusted as necessary over the period of the Frameworks in line with construction inflation. Applicants may apply to qualify for each Framework; however, applicants can only be shortlisted for one of the Frameworks. Applicants will be required to state their Framework preference at the pre-qualification submission stage. For example, if an applicant submits an application for both the Lot A Framework and the Lot B Framework and fulfils the pre-qualification requirements for both Frameworks, the applicant will only be shortlisted for their preferred Framework and will not be shortlisted for the other Framework. For further information please refer to tCivil Engineering led Integrated Design Team for Mayo Community Sports Campus
Mayo County Council_1127CastlebarTender for the appointment of a Civil Engineering led Integrated Design Team for the provision of Design, Procurement and Project Management Services for Mayo Community Sports Campus.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Údarás Na Gaeltachta_289.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.