AquaDuctus Pipeline GmbHKasselTED
AquaDuctus Geotechnical and Geophysical Surveys
AquaDuctus Projekt: Geotechnische und geophysikalische Untersuchungen für eine Wasserstoff-Pipeline in der Nordsee (48 Zoll, 20 GWh2, 120 bara). Vier Lose: Los 1 & 2 (Offshore, zwei Abschnitte, Abschnitt II optional), Los 3 (geophysikalisch/geotechnisch Flachwasser), Los 4 (geotechnisch).
Geotechnical Surveys, Surveying
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- AquaDuctus Pipeline GmbH
- Published:
- June 21, 2026
- Deadline:
- Not specified
- Topic:
- Geotechnical Surveys
Tender description
AquaDuctus Projekt: Geotechnische und geophysikalische Untersuchungen für eine Wasserstoff-Pipeline in der Nordsee (48 Zoll, 20 GWh2, 120 bara). Vier Lose: Los 1 & 2 (Offshore, zwei Abschnitte, Abschnitt II optional), Los 3 (geophysikalisch/geotechnisch Flachwasser), Los 4 (geotechnisch).
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock49 details capturedDocuments
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock4 details capturedLots LOT-0004 · Lots LOT-0001 · Lots LOT-0002 · Lots LOT-0003
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock1 detail capturedPerformance locations
Bidders and contractors
Unlock6 details capturedBidders and contractors · Address
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
8Geophysical surveys for installation engineering of Offshore Substations and Submarine Cable Routes (excluding Landfall)
RTE Réseau de Transport d’ElectricitéPARIS LA DEFENSE CEDEXGeophysical surveys for Offshore Substations and Submarine Cable Routes - Envisaged Period : Spring 2025. The lot 1 corresponds to the first wave of call for tenders specific to the geophysical surveys (excluding Landfall) to be carried out. The specific call for tenders may include more than one project. The Contractor will be in charge of full geophysical survey covering (i) the Submarine Cable Routes from Nearshore to Offshore Substation (min. 40 meters water depth) and (ii) Offshore Substation fondation, including : - Review or perform bibliographical studies - Review Employer data - Define the methodology of the Survey to be carried out with the appropriate tools - Produce Procedures (technical, QHSE, Management and operational) - Mobilize the correct means, in due time to meet the schedule constraints - Complete the Scope of Services as per Employer specification and schedule - Analyse data further to the operation and produce report to the Employer Organisation. Ability to work on several projects at once and ability to communicate efficiently are important and will be assessed during the call for tender process.Procurement of a drilling tower for geotechnical ground surveys.
Statens vegvesenMossThe Norwegian Public Roads Administration, c/o the Operations and Maintenance Division, Ground Drilling, shall procure a new drilling tower for geotechnical ground surveys, as one of the current drilling rig is now ripe for replacement. The drilling tower shall be used for ground surveys in accordance with the Norwegian Public Roads Administration's handbooks and the Norwegian Geotechnical Association ́s messages on the execution of ground surveys. The drilling tower is primarily intended to be used in the Mid/North Norway, but it can be used nationwide.Framework agreement - Consultancy services within geotechnics, environmental geology and engineering geology, including ground surveys.
Farsund kommuneFarsundThe procurement shall cover the contracting authority ́s need for consultancy services within the following disciplines: • Consultant engineer for Geotechniques • Consultant engineer for Environmental geology • Engineering geology including ground surveys The framework agreement is for the execution of geotechnics in connection with municipal development and maintenance projects. The municipality is facing major developments in the health and welfare sector. A significant part of the assignment in this framework agreement will be connected to the preparation of a preliminary project for development, development area development and preparation of the tender documentation. Competence in the development of nursing homes, sheltered accommodations and day centres for elderly persons in this competition will be particularly emphasised. The framework agreement can also be used within all of the municipality ́s service areas for development and maintenance projects. The scope of the assignment will vary in line with political decisions and grants.Preparation and execution of surveys.
INNLANDET FYLKESKOMMUNEHAMARDeadline: Jun 08Framework agreement for preparation and execution of surveys. Number of surveys per annum may vary.CFT 3966 - Conducting surveys for the purpose of updating the Councils Tree Database and Maintenance platform, Arbortrack
South Dublin County CouncilDublinDeadline: Jul 23Conducting surveys for the purpose of updating the Councils Tree Database and Maintenance platform, ArbortrackTopographical and GPR Surveys for Main Street Social Housing, Sallins, Co. Kildare for Kildare County Council
Kildare County Council_385NaasDeadline: Jul 07Topographical and GPR Surveys for Main Street Social Housing, Sallins, Co. Kildare for Kildare County Council Please ensure you ASSOCIATE your company with this competition in order to seek and receive clarifications. Tenderers must upload their submissions in a zipped file format.10033400-CONNEX Support to the Government of the Islamic Republic of Mauritania: Geotechnical, engineering and social-environmental expertise for gH2 negotiations
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHBonnDeadline: Jul 09Geotechnische, ingenieurtechnische und sozial‑umweltbezogene Expertise für gH2‑Verhandlungen mit der Regierung von Mauretanien. Das initiale Auftragsvolumen umfasst die Verhandlungsphase der Global Conventions bis zur Verabschiedung der unterzeichneten Konventionen durch das mauretanische Parlament. Bei erneuter Anforderung kann der Vertrag gemäß Option um weitere GC‑Verhandlungen erweitert werden.Bw 102, Ersatzneubau Vorpommernbrücke sowie Umbau L 22
Hanse- und Universitätsstadt Rostock, Hafen-und SeemannsamtRostockDeadline: Sep 04Erstellung von geotechnischen Planungsleistungen für den Ersatzneubau einer Straßenbrücke, bestehend aus 2 Teilbauwerken Nord und Süd, ggf. erforderlichen vor- und nachgelagerten Moorbrücken Nord und Süd, einer Verkehrszeichenbrücke sowie den erforderlichen Unterbau der Verkehrsanlagen bis zu den Knotenpunkten Gaffelschonerweg / Warnowstraße im Westen und Petridamm / Verbindungsweg im Osten in allen Leistungsphasen der HOAI mit Grundleistungen und Besonderen Leistungen. Voraussichtliche Kosten Baukonstruktion: 1. Straßenbrücke TBW Nord und Süd: 54 Mio EUR netto Abbruch Bestandsbauwerk Bw. 102: 3,5 Mio EUR netto 2. VZB + ggf. erforderliche Moorbrücken: 11,5 Mio EUR netto Abbruch Bestandsbauwerke Bw. 114, Bw 115, VVZB 02: 2,9 Mio EUR 3. Verkehrsanlage Straße: 5,33 Mio EUR Die Beauftragung erfolgt stufenweise; Stufe I beinhaltet den Grundauftrag (Teilleistungen a, b und c HOAI inkl. Besondere Leistungen, Stufe II (Besondere Leistungen: Baubegleitung IBW Nord + VA Nord) +III (Baubegleitung IBW Süd + VA Süd) sind optional.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is AquaDuctus Pipeline GmbH.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.