Trondheim kommuneTRONDHEIMTED
2027 Emergency excavation preparedness water and sewage - RFI
The framework agreement includes excavation stand-by for acute and planned repairs of water and sewage pipelines managed by Trondheim municipality. Unwanted events such as water leaks, collapse of sewage pipelines, replacement of water and sewage manholes and general maintenance of water and sewage infrastructure. The projects will be geo...
Earthworks, Road Construction, Demolition, Pipeline Construction, Sewer Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Trondheim kommune
- Published:
- September 03, 2026
- Deadline:
- October 04, 2026
- Topic:
- Earthworks
- Object:
- Kanalnetz / Abwasserkanal
Object classification
- Kanalnetz / AbwasserkanalPrimary
Tender description
Show full descriptionCollapse description
The framework agreement includes excavation stand-by for acute and planned repairs of water and sewage pipelines managed by Trondheim municipality. Unwanted events such as water leaks, collapse of sewage pipelines, replacement of water and sewage manholes and general maintenance of water and sewage infrastructure. The projects will be geographically distributed throughout Trondheim municipality. They can also include work in Melhus municipality, rarely. The contracting authority ́s expected extent of any contract is estimated to be approx. NOK 60 million per year excluding VAT, with an expected contract period of 2 to 8 years. Emphasis is put on the fact that this is not a competition notice and that the questions and answers are not binding. Tenderers are themselves to carry any costs connected to the response of the RFI.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
4 data areas available
30 days free · no credit card · cancel anytime
Related tenders
9Water and sewage installations from Pinnebekken to Borgen in Ullensaker municipality
Øvre Romerike InnkjøpssamarbeidJessheimDeadline: Sep 23Ullensaker municipality shall increase the water supply to Borgen, as well as transfer sewage from Borgen to the treatment facility at Gardermoen. The contract for this competition is for the establishment of a new water pipeline, a new waste habit pump pipeline, a conduit for fibre, as well as some surface water pipeline.Market dialogue: Framework agreement for chemicals for water and sewage installations.
OFA IKSKristiansandDeadline: Sep 30OFA IKS shall establish a framework agreement for the delivery of chemicals for water and sewage installations throughout Agder. The objective of the procurement is to ensure stable, safe and predictable access to chemicals that are necessary for the production of drinking water and treatment of sewage water. The procurement shall contribute to an efficient, robust and regulatory operation of the water and sewage installations, with high security of delivery and reduced risk of interruption to operations in socially critical functions. Tenderers shall deliver documented suitable products and assist with the necessary professional competence and advice throughout the entire contract period. The framework agreement includes chemicals for i.a.: Precipitants and post-precipitation for sewage purification. Sludge treatment, including packing, thickening and dewatering. Drinking water treatment, including removal of colour, turbidity and particles. The agreement includes i.a. chemicals, polymers and other chemicals used in water and sewage treatment. Tenderers shall be able to ensure safe, flexible and reliable delivery to systems with different technical systems, capacity needs and operational prerequisites. Delivery security, product quality and professional follow-up will be key elements in the agreement. Based on previous market surveys and further work on the procurement, OFA has revised the requirement specifications, the award criteria, the price and product form as well as the price and payment terms. Prior to the competition being announced, we would like input on the revised documents and any problems that ought to be assessed further. We therefore invite relevant tenderers to an oral market dialogue. The aim of the dialogue is to obtain updated knowledge on the market ́s systems, products and delivery models, so that the competition can be designed in an appropriate way and facilitates good competition. We particularly want input on: qualification requirements requirement specifications award criteria price, product form as well as price and payment terms (See annex). OFA does not have a complete overview of the delivery intervals at all delivery locations. Tenderers can, however, get access to an overview of facilities, delivery locations, chemicals and other relevant information. Due to information security reasons, the overview is not shared publicly, but will be made available to verified actors who request access by sending a message to the Contracting Authority via Hyyr. The question is whether the tender overview and delivery overview is sufficient to prepare competitive and realistic prices, or is there a need for further information on delivery intervals, volumes or other conditions? The competition is divided into five sub areas. We are considering reducing the number of sub areas in order to simplify contract management. Do you have input for a possible merger of sub-areas? Several of the participating entities currently use CO₂ tanks that are rented or owned by the existing supplier. In the event of a supplier replacement, there may be a need for procurements, replacements or new establishments of tank facilities and accompanying equipment. How do suppliers normally handle such situations? Should the contracting authority obtain information about existing tank systems, and how should any costs connected to the procurement, disassembly, replacement or establishment of new equipment be handled in the competition? We hope that you can contribute and ask to register your participation by choosing a suitable time for conversation in Hyyr.Stord Vatn and Sewage - Procurement of contract for water and sewage installations Kyvik
Norconsult Norge ASSANDVIKADeadline: Aug 21Stord Vatn and Avløp invite tenderers to a competition for water and sewage installations Kyvik.Parallel framework agreements for contractor services within water and sewage.
DRAMMEN KOMMUNEDRAMMENDeadline: Sep 22Parallel framework agreements for contractor services within water and sewage.Tjøme municipality , stage 3
Færder kommuneNØTTERØYDeadline: Oct 07Background and purpose Færder municipality plans to separate the old AF system to waste water and surface water as well as lay new water pipelines in the centre of Tjøme, stage 3. The work will include excavation work, rock drilling and renovation of the hose. The contract work is divided into two phases; an interaction phase first and then the execution phase. This contract includes all works with new water and sewage installations as shown on the attached drawings, as well as the re-establishment of affected roads. There shall be continual operation of the existing pipeline installations all days throughout the entire construction period. The pipeline route and manhole placement are in the plans that have been prepared. It is anticipated that the ditches will consist of both uncompacted trenches and rock trenches. The trench depth varies from 2.0 to 3.0 metres, with specific locations up to 5.5 metres. The works mainly comprise: approx. 2,170 m complete main trenches of varying width and height. delivery/laying of approx. 1,730 m surface water pipelines delivery/laying of approx. 1,750 m sewage sewage delivery/laying of approx. 2,170 m water pipelines salvage drilling for surface water of approx. 95 m renovating the hose of approx. 480 m 28 complete wastewater manholes 27 complete surface water manholes 23 complete water manholes re-establishment of roads facilitating space for temporary stores. The work will be carried out as a general contract/main contract. Building form 8405 A "Form for contract for the execution of building and construction work" shall be used.Framework agreement - Emergency preparedness exercises and analysis - Statnett SF
Statnett SFOSLODeadline: Sep 21The framework agreement shall cover Statnett's need for external assistance related to work with exercises, testing, analysis and improvement work related to security and preparedness. The supplier shall provide an exercise manager/planner/project manager with an associated team for planning and conducting exercises. The supplier shall also be able to provide advice in connection with exercises. The framework agreement shall cover Statnett and Statnett-owned companies in both operations and projects as well as within all subject areas, such as SHA, HSE, communication, HR and security of supply. Exercises and scope of assistance cover the entire spectrum from small discussion exercises to large full-scale exercises. Consultants must be able to handle classified information in accordance with the Security Act. Need for support within analysis may include evaluation of tests and exercises, and analyses for dimensioning security and preparedness. For further details - see the procurement documents.RFI - Individually facilitated school transport and booked traffic in Nedre Glomma and Moss 2027.
Østfold fylkeskommuneSarpsborgDeadline: Sep 10The current agreements on individually facilitated school transport (ITS) and booked traffic (Flex) in Sarpsborg, Fredrikstad, Hvaler, Råde and Moss municipalities expire 1 August 2027. The aim of this RFI is to give the market the opportunity to share insights, experiences and proposals for organisation in new agreements before the tender documentation is prepared. Note that this RFI is not a competition and does not involve any obligations for the Contracting Authority.Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines
KD VODOVOD I KANALIZACIJA d. o. o.RijekaDeadline: Aug 31Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.VA Selhaugvegen - Havikbotn
Kinn kommuneMåløyDeadline: Sep 28Kinn municipality shall redevelop and establish a new water, wastewater and surface water network and street lights in Botnavegen and Jacob Sandevegen. As well as the establishment of 2 pumping stations for sewage in Havikbotnen and where the current sewage from Botnaholten crosses Botnavegen. In addition the roads shall be restored and asphalted.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 04. Oktober 2026.
- Who is the contracting authority?
- The contracting authority is Trondheim kommune.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.