Øvre Romerike InnkjøpssamarbeidJessheimTED
Water and sewage installations from Pinnebekken to Borgen in Ullensaker municipality
Ullensaker municipality shall increase the water supply to Borgen, as well as transfer sewage from Borgen to the treatment facility at Gardermoen. The contract for this competition is for the establishment of a new water pipeline, a new waste habit pump pipeline, a conduit for fibre, as well as some surface water pipeline.
Pipeline Construction, Sewer Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Øvre Romerike Innkjøpssamarbeid
- Published:
- August 16, 2026
- Deadline:
- September 23, 2026
- Topic:
- Pipeline Construction
- Object:
- Trinkwasserleitung / Versorgungsnetz
Object classification
- Trinkwasserleitung / VersorgungsnetzPrimary
- Kanalnetz / Abwasserkanal
Tender description
Ullensaker municipality shall increase the water supply to Borgen, as well as transfer sewage from Borgen to the treatment facility at Gardermoen. The contract for this competition is for the establishment of a new water pipeline, a new waste habit pump pipeline, a conduit for fibre, as well as some surface water pipeline.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
5 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Operational control water and sewage.
Fredrikstad kommuneFREDRIKSTADDeadline: Aug 19The procurement is for the procurement of a new operational control plant for all water and sewage installations in Fredrikstad municipality. In addition a framework agreement will be signed for the delivery of new PLC installations, upgrading PLS installations at existing stations, work in connection with changes/additions to the operations control plant and automation work on other installations within water and sewage. A maintenance agreement will also be signed for operation control installations, as well as new and existing PLS installations in the municipality. See the procurement documents for further information.Reserve water project Gjøvik‑Biri – Raw water pump station (V2)
Gjøvikregionen - AnskaffelserGJØVIKDeadline: Aug 21Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Gjøvikregionen - AnskaffelserGJØVIKGjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.KKSRA - ERA01, Machinery and process - Prequalification
Sweco Norge ASOsloDeadline: Aug 12Kragerø municipality shall construct a new central treatment facility that shall replace the five existing municipal treatment facilities. The shut-down installations are Helle, Kil, Kragerø, Kirkesund and Stabbestad. In addition to the closure of the five plants, the new facility shall have the capacity to receive sewage water from a further two private treatment facilities as well as for some further development. The new facility is planned with a capacity of 30,000 PE and it shall fulfil treatment requirements for phosphor removal, secondary purification and nitrogen purification. In addition space shall be set aside for quartz cleaning.Operational control water and sewage.
Fredrikstad kommuneFREDRIKSTADDeadline: Aug 17The procurement is for the procurement of a new operational control plant for all water and sewage installations in Fredrikstad municipality. In addition a framework agreement will be signed for the delivery of new PLC installations, upgrading PLS installations at existing stations, work in connection with changes/additions to the operations control plant and automation work on other installations within water and sewage. A maintenance agreement will also be signed for operation control installations, as well as new and existing PLS installations in the municipality. See the procurement documents for further information.VA Selhaugvegen - Havikbotn
Kinn kommuneMåløyDeadline: Sep 21Kinn municipality shall redevelop and establish a new water, wastewater and surface water network and street lights in Botnavegen and Jacob Sandevegen. As well as the establishment of 2 pumping stations for sewage in Havikbotnen and where the current sewage from Botnaholten crosses Botnavegen. In addition the roads shall be restored and asphalted.Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
Trondheim kommuneTRONDHEIM"Fossumdalen stage 5-6 - Ledningstrasé" is part of a larger water and sewage project in Trondheim municipality that has run, and shall run, over several stages. The aim is to reduce the amount of overflow supplied to The River Nidelva from the sewage network by establishing a separated main stem for W&S from the sewage zone Lerkendal where surface water is led to the River Nidelva, and waste water is fed by a self-fall to Høvringen treatment facility. In "Fossumdalen stage 5-6, Ledningstrasé", the existing overflow (OP04) shall be established in "Fossumdalen stage 4" connects to the Høvringen sewage tunnel via a diving pipeline under the River Nidelva with a flushing magazine. The pipeline installation starts with drilling rock from the west side of Osloveien south of Stavne to Høvringen sewage tunnel. Under osloveien, a sewage pipeline is laid through a completed freighter and dug a ditch to the east between the properties in Sivert Dahlens veg. Pipelines that controlled drilling will be executed under the River Nidelva to Valøya. Over Valøya and up to Valøyslyngen, pipelines are to be dug in a ditch. Pipelines in valøyslyngen shall be executed in an increased dimension, which together with the existing volume in the existing sewage pipeline upstream OP04 (new overflow) functions as flushing magnet for the diving line. The flushing magazine shall be emptied via a flush manhole and the facility shall be adapted for the supply of water from the municipality ́s water pipelines. A new water and sewage system shall also be constructed from OP04 (a new overflow) to the junction of Alfred Larsens gate and Valøyslyngen. From the junction of Alfred Larsens gate and valøyslyngen, a new water pipeline will be laid in the same route as the existing water pipeline to Holtermanns road. The following turnkey contracts will be transported to the general contractor:1 "Fossumdalen stage 5-6 - Sewage pump station" (the existing sewage pump station APS is replaced by a smaller and more modern sewage pump station APS04.2 "Fossumdalen section 5-6, HVAC, management and automation"The general contractor will take over, among other things, the engineering design and coordination responsibility for these two turnkey contracts. As part of "Fossumdalen stage 5-6, Ledningstrasé", a sheet box shall be prepared for a sheet box for setting down the new APS04, and the existing Water and Sewage will be connected to the new APS04.Stord Vatn and Sewage - Procurement of contract for water and sewage installations Kyvik
Norconsult Norge ASSANDVIKADeadline: Aug 21Stord Vatn and Sewage invite tenderers to a competition to carry out recipient examinations for the discharge of municipal sewage water from Stord municipality.Purchase of treatment plant for BIR Ressurs - Mjelstad landfill
BIR ASBergenDeadline: Sep 04BIR Resource Dep. Mjelstad (referred to as BIR) shall, in connection with the expansion of the landfill site, procure a new treatment facility forige water that occurs as a result of precipitation hitting and going through the landfill. BIR shall ensure that the area and building is established where the treatment plant shall be constructed. Tenderers of the treatment plant must be responsible for the complete delivery of treatment facilities with all the accompanying equipment that is necessary for operation, as well as assembly, commissioning and training. This is further described in the tender documentation. It is important for BIR to get sufficient information about the treatment facility to facilitate with the correct dimensioned building. BIR shall procure the pumps that shall deliver ladder water to the treatment facility and from the pump sump after the treatment plant to the recipient. It is important that BIR receives information about the interface and sets the dimensions of the treatment plant as the basis for pump capacity. As described later in KG, the landfill does not have a buffer basin and the treatment plant must be able to handle frequent changes in flow into the treatment facility based on a water level in the pump sump. Flow meters in and out of the treatment facility, in addition to flow meters on pump pipelines out to the recipient, must be delivered by the tenderer. The pump intake shall increase the signal from the treatment plant and the treatment plant shall adjust automatically to the level meters in the sump. BIR ensures that pumps are delivered in a pump sump that is controlled by a frequency transformer. The pumps will therefore communicate with the treatment plant ́s PLC, which shall be delivered by the tenderer. Further information on pumps and pump sump can be offered by BIR on request.Water and sewage and environmental services, including suction and flushing services for the Eastern Region.
ForsvarsbyggOSLODeadline: Sep 11This agreement shall primarily cover the need for cleaning and emptying oil separators/fat separators/drinking water tanks/environmental tanks/mobile toilets, control of blocked tanks/oil separators/environment tanks, improvement of separators/environmental tanks/GUP tanks, replacement of wearing parts/components, as well as leakage searches/camera transport. The contract is for iron-out assignments, as well as minor excavation work on water and sewage pipelines, pipe renewal (noDig)/flow of pipes etc.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 23. September 2026.
- Who is the contracting authority?
- The contracting authority is Øvre Romerike Innkjøpssamarbeid.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.