Kinn kommuneMåløyTED
VA Selhaugvegen - Havikbotn
Kinn municipality shall redevelop and establish a new water, wastewater and surface water network and street lights in Botnavegen and Jacob Sandevegen. As well as the establishment of 2 pumping stations for sewage in Havikbotnen and where the current sewage from Botnaholten crosses Botnavegen. In addition the roads shall be restored and a...
Road Construction, Electrical Installation, Pipeline Construction, Sewer Construction, Water Supply
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Kinn kommune
- Published:
- September 06, 2026
- Deadline:
- September 28, 2026
- Topic:
- Road Construction
Tender description
Kinn municipality shall redevelop and establish a new water, wastewater and surface water network and street lights in Botnavegen and Jacob Sandevegen. As well as the establishment of 2 pumping stations for sewage in Havikbotnen and where the current sewage from Botnaholten crosses Botnavegen. In addition the roads shall be restored and asphalted.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
5 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Related tenders
8Tjøme municipality , stage 3
Færder kommuneNØTTERØYDeadline: Oct 07Background and purpose Færder municipality plans to separate the old AF system to waste water and surface water as well as lay new water pipelines in the centre of Tjøme, stage 3. The work will include excavation work, rock drilling and renovation of the hose. The contract work is divided into two phases; an interaction phase first and then the execution phase. This contract includes all works with new water and sewage installations as shown on the attached drawings, as well as the re-establishment of affected roads. There shall be continual operation of the existing pipeline installations all days throughout the entire construction period. The pipeline route and manhole placement are in the plans that have been prepared. It is anticipated that the ditches will consist of both uncompacted trenches and rock trenches. The trench depth varies from 2.0 to 3.0 metres, with specific locations up to 5.5 metres. The works mainly comprise: approx. 2,170 m complete main trenches of varying width and height. delivery/laying of approx. 1,730 m surface water pipelines delivery/laying of approx. 1,750 m sewage sewage delivery/laying of approx. 2,170 m water pipelines salvage drilling for surface water of approx. 95 m renovating the hose of approx. 480 m 28 complete wastewater manholes 27 complete surface water manholes 23 complete water manholes re-establishment of roads facilitating space for temporary stores. The work will be carried out as a general contract/main contract. Building form 8405 A "Form for contract for the execution of building and construction work" shall be used.2027 Emergency excavation preparedness water and sewage - RFI
Trondheim kommuneTRONDHEIMDeadline: Oct 04The framework agreement includes excavation stand-by for acute and planned repairs of water and sewage pipelines managed by Trondheim municipality. Unwanted events such as water leaks, collapse of sewage pipelines, replacement of water and sewage manholes and general maintenance of water and sewage infrastructure. The projects will be geographically distributed throughout Trondheim municipality. They can also include work in Melhus municipality, rarely. The contracting authority ́s expected extent of any contract is estimated to be approx. NOK 60 million per year excluding VAT, with an expected contract period of 2 to 8 years. Emphasis is put on the fact that this is not a competition notice and that the questions and answers are not binding. Tenderers are themselves to carry any costs connected to the response of the RFI.Construction of Akçakale-Harran Drinking Water Transmission Line
City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland)BelgradeDeadline: Oct 08The works covered under this contract is the Construction of Akçakale-Harran Drinking Water Transmission Line, the scope of Works as follows: • Construction of approximately 43 km long transmission lines composed of 400, 600, 700, 800, 900, 1000 mm steel pipes. • Construction of approximately 1.2 km long 280 mm and 630 mm HDPE pipelines, • Repair and liquid tightness test of existing water reservoir with 15,000 m3 volume. Supply, installation, testing and commissioning of pipe, fittings, instrument and equipment in the reservoir and its manoeuvre chamber. • Construction of chlorination building of existing reservoir. Supply, installation, testing and commissioning gas chlorination equipment. • Construction of flowmeters, branch, pressure reducing valve, drainage and air release valve chambers. Supply, installation, testing and commissioning of pipe, fittings, instrument and equipment. • Electrical works including cathodic protection of transmission lines, energy transmission line. • SCADA and automation works.Prequalification Contract 7602 Joint infrastructure and ground work C1/B3 - New Aker
Helse Sør-Øst RHFHAMARDeadline: Sep 28The objective of the procurement is to engage a tenderer who will be responsible for the services that shall be provided in contract 7602 Joint infrastructure and ground work C1/B3. The assignment includes two main elements - the construction of a joint infrastructure for Nye Aker Hospital and the establishment of a construction pit for PHA north and mid. The assignment is covered by three measures that each have their own framework application to the Planning and Building Agency, which shall be carried out in parallel.TII522 Electrical Renewals Works (Low Voltage) IMPQQ
Transport Infrastructure Ireland (TII)DublinDeadline: Sep 28TII intends to enter into Multi Party Framework Agreement for Luas Electrical Renewals and Upgrade Works (Low Voltage) for the Luas Light Rail System. This IMPQQ competition aims to identify and shortlist highly qualified electrical contractors with proven electrical expertise and experience in Low Voltage (LV) electrical systems for light rail or heavy rail infrastructure, specifically in the design, installation, testing, commissioning, and compliance of railway electrical systems at LV level. This framework, when established, will be available to TII to draw down from it on a CallOff Contract basis, (PW-CF2 and PW-CF4). The Applicant must demonstrate a strong track record of delivering complex electrical works in live operational rail environments, ensuring safety, quality, reliability, and full regulatory compliance. The Applicant must demonstrate their experience in the design, installation, testing, commissioning of safetycritical electrical systems in live railway environments and compliance of various railway electrical LV systems. Applicants must demonstrate their experience working in live railway environment and must be capable of acting as the Project Supervisor for the Design Process (PSDP) and the Project Supervisor for the Construction Stage (PSCS) in accordance with Irish health and safety legislation. TII are inviting expressions of interest from interested parties to be selected to tender with a view to entering into the Contract. Applicants are referred to the Information Memorandum and Prequalification Questionnaire (IMPQQ) which provides additional information in relation to the competition. Provided that there is a sufficient number of suitable Applicants, TII intends to invite the number of Applicants (as indicated in this IMPQQ) to tender. Prior to shortlisting any Applicant, TII reserves the right to seek verification of any declarations made in the response to the ESPD/IMPQQ.KEZO Los VA 02b Strassenbau und Werkleitungen
Zweckverband Kehrichtverwertung Zürcher Oberland (EXA Baumanagement AG)HinwilDeadline: Sep 27Die Bauherrschaft, der Zweckverband Kehrichtverwertung Zürcher Oberland (KEZO) wurde 1961 gegründet und umfasst 36 politische Gemeinden im Zürcher Oberland und am Zürichsee. Er betreibt in Hinwil eine Kehrichtverwertungsanlage (KVA) zur thermischen Verwertung von Siedlungsabfällen aus rund 365'000 Haushalten sowie aus Industrie und Gewerbe. Bedingt durch den geplanten Neubau einer Waagen-Anlage müssen auf dem KEZO-Gelände sowohl die Strassen- und Verkehrsführung als auch die Werkleitungen entsprechend angepasst werden. Die hiermit ausgeschriebenen Bauleistungen umfassen u.a.:• Rückbau von Belägen, Mauern und Randabschlüssen• Grabenaushub für Werkleitungen, Erstellung und Anpassungen von Werkleitungsanlagen• Erstellung und Anpassung der Entwässerungsanlagen für die neuen Verkehrsflächen• Erdarbeiten und Aushub für den Einbau der Waagen• Belagsarbeiten für neue und anzupassende Verkehrsflächen Die Arbeiten finden auf dem Werksgelände der KEZO statt. Die auf dem Gelände befindliche Keh-richtverwertungsanlage (KVA) sowie die Anlage der ZAV Recycling (ZAVRe) bleiben während der gesamten Bauzeit in Betrieb. Der Anlagenbetrieb darf durch die Bauarbeiten nicht behin-dert/beeinträchtigt werden. Die Fahrwege der LKWs für die Kehrichtanlieferung und die Reststoff-abholung müssen während der gesamten Bauzeit gewährleistet sein. Die Arbeiten erfolgen daher in Etappen und bei laufendem Betrieb bzw. Verkehr. Desweiteren sind die hiermit ausgeschriebenen Leistungen mit den Arbeiten von Nebenunternehmern zu koordinieren.B 112 OU FFO, 3. VA, Baulos 11
Landesbetrieb Straßenwesen Brandenburg Dienststätte EberswaldeEberswaldeDeadline: Sep 23Herstellung von Bauwerk 3a als Überführung eines Wirtschaftsweges im Zuge des Neubaues der B 112 OU FfOObjektplanung VA
Staatliches Bauamt FreisingFreisingDeadline: Oct 06Objektplanung „Verkehrsanlagen“ (LPH 1 – 6 und LPH 8, 9) Für die Strecke zwischen Oberbiberg und Oberhaching sind verschiedene Instandsetzungs- und be- standsnahe Ausbauvarianten zu entwickeln und hinsichtlich Kosten, technischer Umsetzbarkeit, Dauerhaftigkeit, Verkehrssicherheit, Genehmigungsaufwand und Realisierungsdauer miteinander zu vergleichen. Ziel ist eine möglichst kostengünstige und zeitnah umsetzbare Lösung. Dabei ist auch eine abschnittsweise Differenzierung der Maßnahmen zu prüfen. Auf Grundlage des Variantenver- gleichs ist eine Vorzugsvariante zu empfehlen. Aufgrund der festgestellten PAK-Belastungen ist für die anfallenden Ausbaustoffe ein Entsorgungs- und Verwertungskonzept zu erarbeiten. Die daraus entstehenden Kosten und Auswirkungen auf die Bauzeit sind im Variantenvergleich zu berücksichtigen. Die Erkenntnisse des Bestandsaudits sind bei der Planung zu berücksichtigen. Zudem ist zu prüfen, inwieweit eine bedarfsgerechte und verkehrssichere Gestaltung der vorhandenen Bushaltestellen er-forderlich ist. Das vorhandene Ingenieurbauwerk bei L2368_260_5,200 ist von der Planung ausgenommen. Folgende Grundlagenermittlungen liegen vor: - Bestandsaudit - Asphaltbohrkerne
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 28. September 2026.
- Who is the contracting authority?
- The contracting authority is Kinn kommune.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.