Transport Infrastructure Ireland (TII)DublinTED
TII522 Electrical Renewals Works (Low Voltage) IMPQQ
TII intends to enter into Multi Party Framework Agreement for Luas Electrical Renewals and Upgrade Works (Low Voltage) for the Luas Light Rail System. This IMPQQ competition aims to identify and shortlist highly qualified electrical contractors with proven electrical expertise and experience in Low Voltage (LV) electrical systems for ligh...
Electrical Installation
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Transport Infrastructure Ireland (TII)
- Published:
- August 23, 2026
- Deadline:
- September 28, 2026
- Topic:
- Electrical Installation
Tender description
Show full descriptionCollapse description
TII intends to enter into Multi Party Framework Agreement for Luas Electrical Renewals and Upgrade Works (Low Voltage) for the Luas Light Rail System. This IMPQQ competition aims to identify and shortlist highly qualified electrical contractors with proven electrical expertise and experience in Low Voltage (LV) electrical systems for light rail or heavy rail infrastructure, specifically in the design, installation, testing, commissioning, and compliance of railway electrical systems at LV level. This framework, when established, will be available to TII to draw down from it on a CallOff Contract basis, (PW-CF2 and PW-CF4). The Applicant must demonstrate a strong track record of delivering complex electrical works in live operational rail environments, ensuring safety, quality, reliability, and full regulatory compliance. The Applicant must demonstrate their experience in the design, installation, testing, commissioning of safetycritical electrical systems in live railway environments and compliance of various railway electrical LV systems. Applicants must demonstrate their experience working in live railway environment and must be capable of acting as the Project Supervisor for the Design Process (PSDP) and the Project Supervisor for the Construction Stage (PSCS) in accordance with Irish health and safety legislation. TII are inviting expressions of interest from interested parties to be selected to tender with a view to entering into the Contract. Applicants are referred to the Information Memorandum and Prequalification Questionnaire (IMPQQ) which provides additional information in relation to the competition. Provided that there is a sufficient number of suitable Applicants, TII intends to invite the number of Applicants (as indicated in this IMPQQ) to tender. Prior to shortlisting any Applicant, TII reserves the right to seek verification of any declarations made in the response to the ESPD/IMPQQ.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10View CfT Workspace
Transport Infrastructure Ireland (TII)Deadline: Aug 24TII intends to enter into Multi Party Framework Agreement for Luas Electrical Renewals and Upgrade Works (Low Voltage) for the Luas Light Rail System. This IMPQQ competition aims to identify and shortlist highly qualified electrical contractors with proven electrical expertise and experience in Low Voltage (LV) electrical systems for light rail or heavy rail infrastructure, specifically in the design, installation, testing, commissioning, and compliance of railway electrical systems at LV level. This framework, when established, will be available to TII to draw down from it on a Call-Off Contract basis, (i.e. PW-CF2 or PW-CF4). The Applicant must demonstrate a strong track record of delivering complex electrical works in live operational rail environments, ensuring safety, quality, reliability, and full regulatory compliance. The Applicant must demonstrate their experience in the design, installation, testing, commissioning of safety critical electrical systems in live railway environments and compliance of various railway electrical LV systems. The IMPQQ details where TII allows subcontracting. Applicants must demonstrate their experience working in live railway environment and must be capable of acting as or procuring suitably competent persons to act as the Project Supervisor for the Design Process (PSDP) and the Project Supervisor for the Construction Stage (PSCS) in accordance with Irish health and safety legislation. TII are inviting expressions of interest from interested parties to be selected to tender with a view to entering into the Contract. Applicants are referred to the Information Memorandum and Prequalification Questionnaire (IMPQQ) which provides additional information in relation to the competition. Provided that there is a sufficient number of suitable Applicants, TII intends to invite the number of Applicants (as indicated in this IMPQQ) to tender. Prior to shortlisting any Applicant, TII reserves the right to seek verification of any declarationProvision of Indoor and Outdoor Electrical Works for the Laboratory Building
WHODjiboutiDeadline: Aug 26The World Health Organization (WHO) Country Office in Mongolia seeks a qualified, experienced, and legally registered contractor to undertake the Provision of Indoor and Outdoor Electrical Works for the Laboratory Building located in Ulaanbaatar, Mongolia. The objective of this assignment is to design, supply, install, test, commission, and hand over all required electrical systems and associated infrastructure necessary to ensure the safe, reliable, and efficient operation of the laboratory facility. The works shall comply with applicable Mongolian regulations, international electrical standards, occupational safety requirements, and relevant laboratory infrastructure standards.Provision of Preventive and Corrective Maintenance for the EUAA Premises in Greece (Building and containers)
European Union Agency for AsylumVallettaDeadline: Sep 11The objective of this call for tender is to achieve and maintain through this framework contract a consistent, responsive, and professional level of maintenance to core mechanical and electrical business critical systems and building fabric, preventing downtime and ensuring a comfortable and safe environment for the users of the premises and containers.Mechanical and Electrical Consultancy Services for a Photovoltaic (PV) System at Joinersfolly, Kilkenny
Kilkenny and Carlow ETBKilkennyRequest for Tenders to establish a Mechanical and Electrical-led Design Team to manage the design and installation of a PV System for Kilkenny and Carlow Education and Training Board (KCETB). The system will be located in Joinersfolly, Kilkenny and within the site boundary of the The College of the Future.Supply, Commissioning and Maintenance of drive systems for electrical submersible pumps – Wippolderlaan and Alton
N.V. HVCAlkmaarDeadline: Aug 31The purpose of this tender procedure is to select one supplier regarding the supply, commissioning and maintenance of drive systems of electrical submersible pumps for the projects Wippolderlaan and Alton.Electrical inspections and thermographing, Helse Nord Trøndelag HF
SYKEHUSINNKJØP HFVADSØDeadline: Aug 12The objective of the procurement is to enter into an agreement for electrical inspections and thermography for The Regional Health Authority Nord-Trøndelag. A service contract will be signed.Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
Iarnród Eireann-Irish RailDublinDeadline: Aug 25This is a call to competition by IE for the procurement of a Contractor for the Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. As part of the Glasnevin MetroLink Enabling Works Programme, a specialist Civils and Structures contractor is being procured to undertake both the detailed design and construction of key enabling works. The appointed contractor will play a key role in delivering the enabling works package, which will be undertaken in advance of, or in parallel with, the main MetroLink M100, M401 and M500 contracts and are critical to reducing programme risk, minimising disruption to existing rail services, and protecting the DART+ Programme.Parallel framework agreements for electrical services in water and wastewater installations.
DRAMMEN KOMMUNEDRAMMENThe purpose of this framework agreement is to ensure that the contracting authorities, Drammen Municipality and Glitrevannverket, have access to electrical services for water and wastewater facilities. The framework agreement shall cover the need for electrical services for water and wastewater installations, including, but not limited to, routine maintenance, troubleshooting, installation services, alterations, documentation in the form of drawings and electronic documentation, declarations of conformity, programming of sensors and process equipment, and general work on low-voltage installations up to 1000 V. The framework agreement also includes inspections of electrical installations in water and wastewater installations. The scope of the agreement may include both large and small assignments and projects. The contracting authority intends to enter into parallel framework agreements with three (3) tenderers. Please refer to the procurement documents for further details regarding the contracting authority’s needs.MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
Transport Infrastructure Ireland (TII)DublinDeadline: Jul 24The M120 Heavy Civils Enabling Works Framework Agreement (the M120 Framework) will provide civil engineering works for the MetroLink programme. The scope of works for the M120 Framework will comprise a combination of the following: Site set up and hoarding installation; Logistics and welfare management; Utilities diversions and works; Site clearance and removal of materials; Surveys and/or ground investigations; Bulk earth and rock excavation works; Construction and outfitting works; Building construction and fit-out; Construction of single or multi-span viaducts, overbridges, under bridges and walkways over or under live carriageways and waterways, retaining walls and guide walls, diaphragm walls, secant piling and contiguous piling, rock bolts, anchors, capping beams, shotcrete works, mesh works, sealing of fissures etc., underground and above ground reinforced concrete structures and associated temporary works/propping/other reinforcement works; Monitoring of settlement and ground movement and associated remedial works; De-watering and water treatment/disposal management; Site waste management; Mechanical , electrical and plumbing works as required, perform the roles of PSDP and PSCS; Structural, civil, and engineering design; Any other related works. The procurement of the M120 Framework (the Competition) will be conducted under the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (as amended) (SI 286/2016), and will be managed by TII, acting as the contracting authority, who will be the sole point of contact for applicants. The M120 Framework will be a multi-party Framework Agreement (per Regulation 50 of the Utilities Regulations) consisting of two (2) value based lots. The competition will be structured as a two-stage process with Stage 1 the Selection Stage and Stage 2 the Tender Stage. A maximum of three (3) tenderers will be appointed to each lot. Applicants may apply for one (1) lot only. A tenderer appointed to either lot under the M120 Framework is not precluded from participating in other MetroLink projects or contract packages. The lots are as follows: Lot 1 - Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources. Lot 1 will tunnel portals, single or multi span viaducts, and other contract packages. Lot 2 - Heavy Civils Enabling Works for Call-off contracts with an estimated value less than €50 million (excluding VAT) except those to be included in Lot 1. Lot 2 will consist of call-off contracts for elements of civils works, which may include retaining walls, other foundation/support works. Conduct of the Competition Stage 1: The Selection Stage will commence with the publication of a Pre-Qualification Questionnaire (PQQ) by TII. This will assess applicants based on defined selection criteria for each lot, such as their financial and economic standing, technical capability, and relevant experience. Provided that there is a sufficient number of applicants for each lot, five (5) applicants for each of the two (2) lots will be shortlisted. If less than five (5) applicants meet the minimum requirements for a lot, TII reserves the right to proceed with those applicants to the second stage of the procurement for that lot. The PQQ process to establish both lots will run concurrently. Stage 2: The Tender Stage for the award of the framework and first call-off contracts will commence with TII issuing the Invitation to Negotiate (ITN) to each tenderer for that lot. Following the submission and evaluation of ITN tenders, TII reserves the right to engage in further negotiations with tenderers. Following the negotiation phase, TII may request the submission of Best and Final Offers (BAFOs). The three (3) highest ranked tenderers under each lot will be appointed to the M120 Framework and will be eligible to compete for future call-off contracts. The 4th and 5th ranked tenderers under each lot will be reserve tenderers. If during the term of the M120 Framework a framework contractor no longer meets the financial and economic standing requirements in the PQQ or does not submit a tender in response to a call-off tender for three or more call-off contracts in a row then TII reserves the right to terminate the framework agreement with that contractor and appoint one of the reserve tenderers to the M120 Framework. Furthermore, the highest ranked tenderer under each lot will be awarded the first call-off contracts under each lot: Lot 1 award of the contract for the Dublin Airport station box (see 5.1 Lot: LOT0001); Lot 2 award of the contract for excavation and pile removal works near to Tara Street station (see 5.1 LOT 0002). Future call off contracts will be awarded by way of mini-competition following the issue of the call-off tender document to the framework members. Detailed information regarding the award criteria for the future / subsequent call-off contracts after the first call-off contracts will be communicated to tenderers appointed to each lot of the M120 Framework as they arise based on TII’s requirements. The M120 Framework may also be used by Iarnród Eireann - Irish Rail to procure call-off contracts for heavy civil engineering works at or adjacent to Glasnevin station (including, without limitation, retaining wall construction, ground stabilisation, utility diversions, interface works with the MetroLink alignment, and preparatory or enabling works necessary to facilitate the integration of MetroLink with the existing Irish Rail network at that location), provided that the works in question fall within one or more of the categories of work set out in the scope of works for the M120 Framework. Refer to the PQQ documents for further information.Establishment of a Multi Supplier Framework of Construction Consultancy Services for Small and Minor Projects for the Buildings and Estates Office, UCC
University College CorkCorkDeadline: Sep 18This Tender is to establish a multi supplier framework of Construction Consultancy Services for Small and Minor Works projects at University College Cork with a maximum of Six (6) participating teams to whom specific contracts may be awarded on a non-exclusive basis based on the terms of a framework agreement (the “Framework Agreement”), a copy of which will be issued with the tender documents. The construction consultancy services require to participate on the Framework will be procured on the basis of a single design team appointment. The team will comprise the following services. Architectural Services (including DAC and Planning and Landscaping Design Services Civil/Structural and Fire Engineering Services Mechanical and Electrical Engineering Services Project Supervisor Design Process (PSDP) Quantity Surveying Services Employer’s Representative The Framework Agreement will be established on foot of competitive tenders received for the above services based on Notional Hours and rates for various disciplines as detailed in the Pricing Document
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 28. September 2026.
- Who is the contracting authority?
- The contracting authority is Transport Infrastructure Ireland (TII).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.