Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
Advancing Regional Circular Economy in Indonesia – Technical advisory & capacity development
Technical advisory and capacity development for the 'InCircular: Promoting a Circular Economy in Indonesia' project. Responsibilities include implementing Output 4 to strengthen technical capacities of provincial and municipal administrations in waste management and circular economy planning, reporting, and achieving indicators. Activitie...
Project Management, Digitalisation Consulting, Vocational Training, Management Consulting
No credit card · Instant access
Content at a glance
Technical advisory and capacity development for the 'InCircular: Promoting a Circular Economy in Indonesia' project. Responsibilities include implementing Output 4 to strengthen technical capacities of provincial and municipal administrations in waste management and circular economy planning, reporting, and achieving indicators. Activi...
- Tender type:
- Tender
- Contracting authority:
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- Published:
- June 29, 2026
- Deadline:
- July 30, 2026
- Topic:
- Project Management
Tender description
Technical advisory and capacity development for the 'InCircular: Promoting a Circular Economy in Indonesia' project. Responsibilities include implementing Output 4 to strengthen technical capacities of provincial and municipal administrations in waste management and circular economy planning, reporting, and achieving indicators. Activities include waste data collection, local governance and financing improvement, EPR implementation, capacity building, material flow analysis, stakeholder engagement, guiding regional circular economy implementation, and establishing EPR pilots in pilot provinces. Ongoing technical support on waste management to project municipalities. GIZ has already started preparatory work in pilot provinces.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
1 file recorded- Hinweis auf Bekanntmachungsorte.pdf
Related tenders
10- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Jul 30
10006175 - Advancing Regional Circular Economy in Indonesia
The contractor will be responsible for the implementation of Output 4: "The technical capacities of provincial and municipal administrations to plan and report on measures in waste management and circular economy have been strengthened", and achieving the Module Objective Indicator 3 and Output Indicators 4.1 and 4.2 by implementing the activities, producing the deliverables and fulfilling corresponding milestones as defined within these Terms of Reference. The overall objective of the tendered services is to provide high-quality technical advisory and capacity development support for the implementation of the project "InCircular: Promoting a Circular Economy in Indonesia". The service provided by the contractor will support the implementation of circular economy principles through enhancing waste data collection and transfer, improving local governance and financing, EPR implementation, by conducting capacity building, material flow analysis, stakeholder engagement and dialogue, guiding the improvement of regional circular economy implementation, as well as the establishment of EPR pilots in pilot provinces. In addition, the contractor will provide ongoing technical support on waste management to project municipalities. By fostering multi-stakeholder collaboration and institutional engagement and capacity, the contractor will help establish the conditions necessary for a transition towards more circular and inclusive economy in Indonesia. For the preparation of the delivery of Output 4, GIZ has already started implementation in a preparatory phase preparing provincial stakeholder mapping and analysis, preliminary packaging waste and residual waste flow analysis and a cities selection in close coordination with national and provincial partners. During project preparation it was anticipated that activities for Output 4 will be conducted in East Java and potentially in Bali. Expected Outcomes Public and private sector stakeholders in selected pilot municipalities in project provinces will be better equipped to independently plan, implement, and report data on waste management, as well as respond to governance prerequisite requirements for implementing circular economy initiatives and EPR schemes. Main outcomes of the contract are aligned with the following project indicators and are the following: 1. Output indicator 4.1: 10 partner municipalities in the pilot provinces of East Java and Bali have shared digitalised data on recycling of packaging waste based on uniform standards with the national level (by 12/2028). 2. Output indicator 4.2: 12 project proposals are developed by partner municipalities on expanding existing waste treatment plants in East Java and Bali to enable them to produce RDF (by 12/2028). 3. Module objective indicator 3: 1 implemented approach by public and private actors to improve the collection and recycling of packaging in the East Java and Bali (by 06/2028). - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
10006175 - Advancing Regional Circular Economy in Indonesia
The contractor will be responsible for the implementation of Output 4: "The technical capacities of provincial and municipal administrations to plan and report on measures in waste management and circular economy have been strengthened", and achieving the Module Objective Indicator 3 and Output Indicators 4.1 and 4.2 by implementing the activities, producing the deliverables and fulfilling corresponding milestones as defined within these Terms of Reference. The overall objective of the tendered services is to provide high-quality technical advisory and capacity development support for the implementation of the project "InCircular: Promoting a Circular Economy in Indonesia". The service provided by the contractor will support the implementation of circular economy principles through enhancing waste data collection and transfer, improving local governance and financing, EPR implementation, by conducting capacity building, material flow analysis, stakeholder engagement and dialogue, guiding the improvement of regional circular economy implementation, as well as the establishment of EPR pilots in pilot provinces. In addition, the contractor will provide ongoing technical support on waste management to project municipalities. By fostering multi-stakeholder collaboration and institutional engagement and capacity, the contractor will help establish the conditions necessary for a transition towards more circular and inclusive economy in Indonesia. For the preparation of the delivery of Output 4, GIZ has already started implementation in a preparatory phase preparing provincial stakeholder mapping and analysis, preliminary packaging waste and residual waste flow analysis and a cities selection in close coordination with national and provincial partners. During project preparation it was anticipated that activities for Output 4 will be conducted in East Java and potentially in Bali. Expected Outcomes Public and private sector stakeholders in selected pilot municipalities in project provinces will be better equipped to independently plan, implement, and report data on waste management, as well as respond to governance prerequisite requirements for implementing circular economy initiatives and EPR schemes. Main outcomes of the contract are aligned with the following project indicators and are the following: 1. Output indicator 4.1: 10 partner municipalities in the pilot provinces of East Java and Bali have shared digitalised data on recycling of packaging waste based on uniform standards with the national level (by 12/2028). 2. Output indicator 4.2: 12 project proposals are developed by partner municipalities on expanding existing waste treatment plants in East Java and Bali to enable them to produce RDF (by 12/2028). 3. Module objective indicator 3: 1 implemented approach by public and private actors to improve the collection and recycling of packaging in the East Java and Bali (by 06/2028). - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHN/ADeadline: Jul 30
10006175 - Advancing Regional Circular Economy in Indonesia
The challenge Our planet"s resources are limited, and environmental pollution is on the rise. The OECD projects that plastics and packaging consumption will nearly double by 2050, underscoring the urgent need to transition from a linear "take-make-dispose" economy to a circular one. Our predominant linear model depletes finite resources, generates escalating waste volumes, and strains ecosystems, with only 9% of plastic waste globally being recycled as per UNEP reports. A circular economy (CE), on the other hand, emphasises on resource efficiency through reuse, recycling, and recovery, offers a sustainable alternative to mitigate environmental degradation and optimise material lifecycles. In Indonesia, where local governments struggle with providing waste management services and infrastructure that needs to keep pace with rapid urbanisation and consumption growth, adopting circular principles is critical to addressing mounting environmental and economic challenges. Extended Producer Responsibility (EPR) is pivotal in operationalising a circular economy by enforcing the Polluter Pays Principle (PPP), compelling producers to internalise the costs of managing their products" end-of-life waste. By implementing a dual system for packaging and other waste streams, EPR shifts the financial burden from overburdened municipal budgets to producers, incentivising eco-design and efficient waste management. In Indonesia, where inadequate financing hampers effective waste collection and processing, resulting in over 60% of plastic waste being mismanaged (World Bank, 2021), EPR offers a mechanism to secure sustainable funding and enhance operational capacity, ensuring that waste is managed responsibly and diverted from landfills, rivers, and oceans. Our approach InCircular supports the implementation of Indonesia"s Circular Economy Roadmap and National Action Plan 2025-2045 (Bappenas, 2024) which emphasises circularity for key sectors to address climate change, biodiversity loss, pollution, and enhancing resource efficiency. By fostering multi stakeholder collaboration among government, private sector, and civil society to develop EPR frameworks, the project supports the Indonesian government"s objective of creating inclusive, evidence-based policies that strengthen economic resilience and sustainable resource management. InCircular aims to unite a diverse coalition of stakholders to jointly develop strategies, policies, and an operating system that fit to the Indonesian context. By fostering stakeholder dialogue and leveraging German and global best practices, the project seeks to deliver actionable policy recommendations to the Indonesian government, paving the way for systemic change in waste management financing and operations while promoting a circular economy that benefits both the environment and society. InCircular works towards 5 outputs: 1. Support the coordination of the implementation of the Circular Economy Roadmap and Action Plan; 2. Enhance regulatory frameworks for EPR and selected material streams (packaging, residual waste, e-waste); 3. Strengthen collaboration with industry partners for the transition to a Circular Economy; 4. Improve waste management in selected provinces and municipalities; 5. Advance Green/Sustainable Public Procurement (G/SPP) for selected goods. The benefits InCircular will address crucial challenges in policymaking to make polluters pay. Thereby, it creates a new income stream to further transform waste management financing on local and national level which would enhance economic growth and activities in a systemically underfunded sector. This will alleviate public budgets, reduce pollution and create economic opportunities within material value chains. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
81322091-Technical advisory and capacity building services for a climate-sensitive circular economy in the Caribbean
2. Tasks and services Overall objective of the consultancy The consultancy strengthens the enabling environment for circular economy in the Caribbean by building institutional and technical capacity, guiding strategy and governance development, facilitating stakeholder collaboration and supporting the implementation of national roadmaps. It ensures public and private circular economy stakeholders are equipped to adopt climate-sensitive circular practices. The consultancy will provide high-quality advisory and training services, contributing primarily to Outputs 2, 3, and 4 of the project. Expected outcomes - Improved enabling conditions through institutional and technical capacity development at national and regional levels. - Strengthened technical, operational and managerial skills of public officials for planning, implementation and monitoring of circular economy measures. - Awareness and behavioural change among decision-makers, businesses, communities and end-consumers. - Enhanced regional learning, replication and exchange of best practices across Caribbean countries. Work Packages and tasks to be delivered Work Package 1: Capacity building for national actors The consultancy will strengthen the capacities of national stakeholders to design and implement circular economy approaches. This includes preparing a comprehensive situational analysis and a scoping report that identifies five strategic approaches across Dominica, Grenada, Guyana, Jamaica, and Saint Vincent and the Grenadines. The experts will provide technical input for an awareness programme targeting policymakers, highlighting the importance of circular and climate-sensitive waste management solutions. In addition, five national two-day workshops will be designed and delivered, one in each country, bringing together at least 100 participants, of whom at least 30 will be women. These workshops will initiate the drafting of country-specific roadmaps for selected strategic approaches. The consultancy will further support national stakeholders in reviewing and finalizing the five roadmaps, ensuring that they address governance, financing, risk management, monitoring and sustainability. Work Package 2: Advisory and capacity building for national waste management authorities Through this work package, institutional, technical, strategic and operational capacities of national waste authorities are strengthened. The consultancy will design and implement six three-day workshops, one in each project country, to support the development of concepts and incentive systems for a climate-sensitive circular economy. Each workshop will include seven structured sessions covering awareness-raising, capacity and competence development, technical implementation, financial feasibility, incentive design, monitoring and sustainability. Participation will include at least 40 staff members from national waste authorities, of which a minimum of 12 will be women. To promote regional peer learning, the consultancy will also organize two online sequential exchange sessions that facilitate the sharing of experiences and lessons learned among the six countries. Building on these efforts, the consultants will provide technical advice to finalize six national roadmaps and establish a monitoring mechanism to ensure effective and adaptive implementation. Work Package 3: Dissemination and communication support The consultancy will actively contribute to raising awareness and visibility of circular economy approaches in the Caribbean. Experts will participate as speakers or panellists in four regional or international events to present project experiences, lessons learned and recommendations. They will also contribute to the planning of four national, regional, or international conferences by proposing relevant topics, identifying suitable speakers and ensuring technical relevance of the programmes. In addition, the consultancy will provide expert input for three cross-country digital awareness campaigns targeting businesses and households. These campaigns will promote action options for climate-sensitive circular economy and the consultants ensure that materials are technically accurate, contextually adapted, and aligned with the project"s objectives and regional sector context. Deliverables and milestones - Scoping report - Awareness workshop content - Five national workshops and draft roadmaps - Finalized roadmaps - Six 3-day waste authority workshops with draft circular economy concepts - Two regional sequential online sessions - Finalized roadmaps and monitoring mechanism - Participation in 4 events and support to 4 conferences - Reviewed and validated awareness campaign materials - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 11
Scaling Up Implementation and Institutional Capacity for Energy Management Systems (EnMS) in Pakistan
The services to be provided in the context of this call for tenders support the scaling up of Energy Management Systems (EnMS) in municipal organisations in Pakistan, with a particular focus on water supply and sanitation companies. The consultancy services will focus on strengthening the implementation and institutional capacity for EnMS in close cooperation with partner municipal organisations and relevant national and provincial government agencies and departments. These consultancy services will be delivered from the start of the contract until 29.02.2028. The assignment comprises of hands-on technical assistance and continuous advisory support to enable municipal management and energy teams of up to 6 partner municipal organisations to establish, operate, and continuously improve EnMS processes aligned with ISO 50001 principles. This includes support for establishing energy baselines of each partner organisation, regular monitoring and review of the established energy performance indicators (EnPI), corrective action planning, and systematic energy performance improvement. In addition, the consultancy will support partner organisations in the identification, prioritisation, and implementation of energy efficiency (EE) measures within water supply and sanitation infrastructure. This includes the development of technical EE recommendations and advisory support for their implementation. The consultancy will further assist in the preparation of bankable EE project proposals and business cases, including the technical and financial analyses required to mobilise financing for priority EE and EnM investments. To ensure long-term institutionalisation, the consultancy will develop recommendations for organisational development measures to mainstream EnMS within municipal structures. This includes strengthening internal roles and responsibilities, coordination mechanisms, and the integration of EnMS into planning, budgeting, and procurement processes. Advisory support will also be provided for the design and introduction of organisational EE incentive mechanisms to promote energy-efficient behaviour and align staff performance with energy and cost reduction objectives. Capacity development and knowledge exchange form a core component of the assignment. The aim is to ensure that, by the end of the project, municipal experts, managers, and decision-makers are equipped in terms of technical capacities to mainstream EnMS independently within Pakistan"s water supply and sanitation services. This objective remains central to all capacity development measures implemented under the assignment. Based on a structured capacity needs assessment and a corresponding capacity development strategy, the consultancy will develop relevant knowledge products and implement tailored capacity development activities, including trainings, workshops, and knowledge exchange activities, among others. These measures will strengthen competencies in EnMS implementation, energy data management and analysis, EnPI-based decision-making, EE intervention design, monitoring and verification, and the institutional embedding of EnM within municipal governance processes. To support scaling and dissemination of results and international and national best municipal EnM best practices, the consultancy will organise a national conference on municipal EnM as a platform for knowledge exchange and dialogue among sector stakeholders. Furthermore, advisory inputs will be provided to contribute to an enabling framework for EnMS, including recommendations for policy and institutional support measures at national and provincial levels. Lastly, the consultancy will implement a hands-on training programme for recently graduated women engineers in the field of EnM and EnMS to strengthen their technical competencies and promote their participation in Pakistan"s energy sector by enhancing their employability. The working packages listed are indicative and may be adapted in response to partner needs and evolving framework conditions. The contractor is expected to provide flexible, demand-driven advisory services within the defined scope of expertise and to ensure regular reporting and structured coordination with the project throughout contract implementation. In order to provide the service, the contractor should put together a sufficiently large, qualified, and experienced team of experts based on the required expertise, with a focus on ensuring adequate on-ground time to provide the necessary hand-holding and continued support for the implementation of project activities with the selected municipal partners. The team should also be able to engage with the selected political counterparts to be covered. The proposal for the tender should outline the strategy for task fulfilment, specifying personnel roles and the overarching internal management concept to be used as the basis for processing orders, including financial backstopping. Part of the fulfilment of the contract includes regular reporting to the project on progress made in achieving the objectives. The regular exchange between the project and the consultants begins at the start of the contract and includes weekly or bi-weekly reflection sessions, which can be adjusted to a different frequency if needed. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 11
Scaling Up Implementation and Institutional Capacity for Energy Management Systems (EnMS) in Pakistan
The services to be provided in the context of this call for tenders support the scaling up of Energy Management Systems (EnMS) in municipal organisations in Pakistan, with a particular focus on water supply and sanitation companies. The consultancy services will focus on strengthening the implementation and institutional capacity for EnMS in close cooperation with partner municipal organisations and relevant national and provincial government agencies and departments. These consultancy services will be delivered from the start of the contract until 29.02.2028. The assignment comprises of hands-on technical assistance and continuous advisory support to enable municipal management and energy teams of up to 6 partner municipal organisations to establish, operate, and continuously improve EnMS processes aligned with ISO 50001 principles. This includes support for establishing energy baselines of each partner organisation, regular monitoring and review of the established energy performance indicators (EnPI), corrective action planning, and systematic energy performance improvement. In addition, the consultancy will support partner organisations in the identification, prioritisation, and implementation of energy efficiency (EE) measures within water supply and sanitation infrastructure. This includes the development of technical EE recommendations and advisory support for their implementation. The consultancy will further assist in the preparation of bankable EE project proposals and business cases, including the technical and financial analyses required to mobilise financing for priority EE and EnM investments. To ensure long-term institutionalisation, the consultancy will develop recommendations for organisational development measures to mainstream EnMS within municipal structures. This includes strengthening internal roles and responsibilities, coordination mechanisms, and the integration of EnMS into planning, budgeting, and procurement processes. Advisory support will also be provided for the design and introduction of organisational EE incentive mechanisms to promote energy-efficient behaviour and align staff performance with energy and cost reduction objectives. Capacity development and knowledge exchange form a core component of the assignment. The aim is to ensure that, by the end of the project, municipal experts, managers, and decision-makers are equipped in terms of technical capacities to mainstream EnMS independently within Pakistan"s water supply and sanitation services. This objective remains central to all capacity development measures implemented under the assignment. Based on a structured capacity needs assessment and a corresponding capacity development strategy, the consultancy will develop relevant knowledge products and implement tailored capacity development activities, including trainings, workshops, and knowledge exchange activities, among others. These measures will strengthen competencies in EnMS implementation, energy data management and analysis, EnPI-based decision-making, EE intervention design, monitoring and verification, and the institutional embedding of EnM within municipal governance processes. To support scaling and dissemination of results and international and national best municipal EnM best practices, the consultancy will organise a national conference on municipal EnM as a platform for knowledge exchange and dialogue among sector stakeholders. Furthermore, advisory inputs will be provided to contribute to an enabling framework for EnMS, including recommendations for policy and institutional support measures at national and provincial levels. Lastly, the consultancy will implement a hands-on training programme for recently graduated women engineers in the field of EnM and EnMS to strengthen their technical competencies and promote their participation in Pakistan"s energy sector by enhancing their employability. The working packages listed are indicative and may be adapted in response to partner needs and evolving framework conditions. The contractor is expected to provide flexible, demand-driven advisory services within the defined scope of expertise and to ensure regular reporting and structured coordination with the project throughout contract implementation. In order to provide the service, the contractor should put together a sufficiently large, qualified, and experienced team of experts based on the required expertise, with a focus on ensuring adequate on-ground time to provide the necessary hand-holding and continued support for the implementation of project activities with the selected municipal partners. The team should also be able to engage with the selected political counterparts to be covered. The proposal for the tender should outline the strategy for task fulfilment, specifying personnel roles and the overarching internal management concept to be used as the basis for processing orders, including financial backstopping. Part of the fulfilment of the contract includes regular reporting to the project on progress made in achieving the objectives. The regular exchange between the project and the consultants begins at the start of the contract and includes weekly or bi-weekly reflection sessions, which can be adjusted to a different frequency if needed. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
Scaling Up Implementation and Institutional Capacity for Energy Management Systems (EnMS) in Pakistan
The services to be provided in the context of this call for tenders support the scaling up of Energy Management Systems (EnMS) in municipal organisations in Pakistan, with a particular focus on water supply and sanitation companies. The consultancy services will focus on strengthening the implementation and institutional capacity for EnMS in close cooperation with partner municipal organisations and relevant national and provincial government agencies and departments. These consultancy services will be delivered from the start of the contract until 29.02.2028. The assignment comprises of hands-on technical assistance and continuous advisory support to enable municipal management and energy teams of up to 6 partner municipal organisations to establish, operate, and continuously improve EnMS processes aligned with ISO 50001 principles. This includes support for establishing energy baselines of each partner organisation, regular monitoring and review of the established energy performance indicators (EnPI), corrective action planning, and systematic energy performance improvement. In addition, the consultancy will support partner organisations in the identification, prioritisation, and implementation of energy efficiency (EE) measures within water supply and sanitation infrastructure. This includes the development of technical EE recommendations and advisory support for their implementation. The consultancy will further assist in the preparation of bankable EE project proposals and business cases, including the technical and financial analyses required to mobilise financing for priority EE and EnM investments. To ensure long-term institutionalisation, the consultancy will develop recommendations for organisational development measures to mainstream EnMS within municipal structures. This includes strengthening internal roles and responsibilities, coordination mechanisms, and the integration of EnMS into planning, budgeting, and procurement processes. Advisory support will also be provided for the design and introduction of organisational EE incentive mechanisms to promote energy-efficient behaviour and align staff performance with energy and cost reduction objectives. Capacity development and knowledge exchange form a core component of the assignment. The aim is to ensure that, by the end of the project, municipal experts, managers, and decision-makers are equipped in terms of technical capacities to mainstream EnMS independently within Pakistan"s water supply and sanitation services. This objective remains central to all capacity development measures implemented under the assignment. Based on a structured capacity needs assessment and a corresponding capacity development strategy, the consultancy will develop relevant knowledge products and implement tailored capacity development activities, including trainings, workshops, and knowledge exchange activities, among others. These measures will strengthen competencies in EnMS implementation, energy data management and analysis, EnPI-based decision-making, EE intervention design, monitoring and verification, and the institutional embedding of EnM within municipal governance processes. To support scaling and dissemination of results and international and national best municipal EnM best practices, the consultancy will organise a national conference on municipal EnM as a platform for knowledge exchange and dialogue among sector stakeholders. Furthermore, advisory inputs will be provided to contribute to an enabling framework for EnMS, including recommendations for policy and institutional support measures at national and provincial levels. Lastly, the consultancy will implement a hands-on training programme for recently graduated women engineers in the field of EnM and EnMS to strengthen their technical competencies and promote their participation in Pakistan"s energy sector by enhancing their employability. The working packages listed are indicative and may be adapted in response to partner needs and evolving framework conditions. The contractor is expected to provide flexible, demand-driven advisory services within the defined scope of expertise and to ensure regular reporting and structured coordination with the project throughout contract implementation. In order to provide the service, the contractor should put together a sufficiently large, qualified, and experienced team of experts based on the required expertise, with a focus on ensuring adequate on-ground time to provide the necessary hand-holding and continued support for the implementation of project activities with the selected municipal partners. The team should also be able to engage with the selected political counterparts to be covered. The proposal for the tender should outline the strategy for task fulfilment, specifying personnel roles and the overarching internal management concept to be used as the basis for processing orders, including financial backstopping. Part of the fulfilment of the contract includes regular reporting to the project on progress made in achieving the objectives. The regular exchange between the project and the consultants begins at the start of the contract and includes weekly or bi-weekly reflection sessions, which can be adjusted to a different frequency if needed. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHN/ADeadline: Aug 18
Technical Assistance for Improved Subnational Service Delivery and Decentralisation Reform Cambodia
The contractor shall provide flexible, demand-driven technical assistance services to support the implementation of the programme "Improved Service Delivery for Citizens in Cambodia II (ISD II)" during the project´s implementation period. Services will be delivered through the mobilisation and management of predominantly short-term national and international experts as well as one senior international long-term advisor. Assignments will be agreed with GIZ under a defined mobilisation procedure and aligned with the programme"s annual operational planning. The scope of services is structured along the following indicative work packages aligned to the output structure of ISD II: WP1.1 - OWSO Service Innovations Provision of technical advisory services to assess, modernise and introduce innovations in One Window Service Office (OWSO) service delivery processes. This includes process diagnostics, development and piloting of digital and administrative innovations (e.g. workflow optimisation, digital tools, mobile services), change management support, and documentation of lessons learned for scaling. WP1.2 - Service Improvement Planning and Demonstration Projects Advisory support to selected Districts and Municipalities (DMs) for the development, endorsement and implementation of participatory, evidence-based and climate-sensitive service improvement plans in selected sectors (e.g. waste management, irrigation, social services). This includes design and implementation support for demonstration measures and documentation of results for replication. WP2.1 - Organisational and HR Strengthening Technical and process advisory services to strengthen organisational structures, internal processes, leadership and human resource management of selected DMs. This includes organisational diagnostics, implementation of improvement measures, gender-responsive HR approaches, and support to women"s leadership. WP2.2 - Planning and Budgeting Strengthening Advisory support to improve planning and budgeting systems of DMs, including participatory and climate-sensitive investment planning, alignment between medium-term and annual budgets, and development and application of practical planning and budgeting tools. WP3.1 - National Participation and Social Accountability Frameworks Provision of technical and strategic advisory services to national partner institutions (e.g. NCDD-S, Ministry of Interior) to strengthen legal, regulatory and institutional frameworks for participation and accountability at DM level. This includes analysis of existing mechanisms, development of reform proposals, and facilitation of consultations. WP3.2 - DM-Level Participation and Accountability Operational advisory support to DMs and relevant stakeholders to strengthen the application of participation and accountability mechanisms in service delivery and planning processes. This may include methodological support to civil society organisations and piloting of integrated accountability workflows, including digital formats where appropriate. WP4.1 - Peer-Learning Networks Technical and process advisory services to establish and institutionalise intra- and inter-provincial peer-learning networks among DMs. This includes design and facilitation of exchange formats, documentation of good practices, and development of scaling products. WP4.2 - Institutionalised Training and E-Learning Support to training institutions (e.g. National School of Local Administration - NASLA) to develop, pilot and institutionalise structured, needs-based training and e-learning formats aligned with lessons generated under ISD II. WP5.1 - Strategic and Legal Reform Advice (NP-2) Provision of technical advice to national partner institutions (e.g. NCDD-S, Ministry of Interior, Ministry of Economy and Finance) on selected implementation issues related to decentralization reform, including fiscal decentralization, non-tax revenues, and regulatory or policy adjustments. WP5.2 - Multi-Level Dialogue and Policy Uptake Technical and procedural support to structure and facilitate multi-level dialogue processes between subnational and national stakeholders. This includes systematisation of evidence from implementation, development of policy briefs and proposals, and documentation of follow-up actions. WP0 - Project Implementation Support (Cross-Cutting) Provision of cross-cutting support services to ensure effective implementation of ISD II. This includes i) Support to the operationalisation of monitoring and evaluation systems; ii) Facilitation and moderation of workshops and coordination meetings; iii) Organisational development and team support measures; iv) Quality assurance and support to results-based reporting; v) Flexible and timely mobilisation and management of short-term experts. The list of work packages is indicative and may be adjusted in line with programme needs. The contractor shall ensure: - High-quality expert selection and management; - High degree of flexibility and adaptability - Integration of cross-cutting principles (gender equality, Leave No One Behind, climate sensitivity, digitalisation, conflict sensitivity); - Effective coordination with GIZ and partner institutions; - Results-based monitoring and reporting in line with contractual requirements. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 18
Technical Assistance for Improved Subnational Service Delivery and Decentralisation Reform Cambodia
The contractor shall provide flexible, demand-driven technical assistance services to support the implementation of the programme "Improved Service Delivery for Citizens in Cambodia II (ISD II)" during the project´s implementation period. Services will be delivered through the mobilisation and management of predominantly short-term national and international experts as well as one senior international long-term advisor. Assignments will be agreed with GIZ under a defined mobilisation procedure and aligned with the programme"s annual operational planning. The scope of services is structured along the following indicative work packages aligned to the output structure of ISD II: WP1.1 - OWSO Service Innovations Provision of technical advisory services to assess, modernise and introduce innovations in One Window Service Office (OWSO) service delivery processes. This includes process diagnostics, development and piloting of digital and administrative innovations (e.g. workflow optimisation, digital tools, mobile services), change management support, and documentation of lessons learned for scaling. WP1.2 - Service Improvement Planning and Demonstration Projects Advisory support to selected Districts and Municipalities (DMs) for the development, endorsement and implementation of participatory, evidence-based and climate-sensitive service improvement plans in selected sectors (e.g. waste management, irrigation, social services). This includes design and implementation support for demonstration measures and documentation of results for replication. WP2.1 - Organisational and HR Strengthening Technical and process advisory services to strengthen organisational structures, internal processes, leadership and human resource management of selected DMs. This includes organisational diagnostics, implementation of improvement measures, gender-responsive HR approaches, and support to women"s leadership. WP2.2 - Planning and Budgeting Strengthening Advisory support to improve planning and budgeting systems of DMs, including participatory and climate-sensitive investment planning, alignment between medium-term and annual budgets, and development and application of practical planning and budgeting tools. WP3.1 - National Participation and Social Accountability Frameworks Provision of technical and strategic advisory services to national partner institutions (e.g. NCDD-S, Ministry of Interior) to strengthen legal, regulatory and institutional frameworks for participation and accountability at DM level. This includes analysis of existing mechanisms, development of reform proposals, and facilitation of consultations. WP3.2 - DM-Level Participation and Accountability Operational advisory support to DMs and relevant stakeholders to strengthen the application of participation and accountability mechanisms in service delivery and planning processes. This may include methodological support to civil society organisations and piloting of integrated accountability workflows, including digital formats where appropriate. WP4.1 - Peer-Learning Networks Technical and process advisory services to establish and institutionalise intra- and inter-provincial peer-learning networks among DMs. This includes design and facilitation of exchange formats, documentation of good practices, and development of scaling products. WP4.2 - Institutionalised Training and E-Learning Support to training institutions (e.g. National School of Local Administration - NASLA) to develop, pilot and institutionalise structured, needs-based training and e-learning formats aligned with lessons generated under ISD II. WP5.1 - Strategic and Legal Reform Advice (NP-2) Provision of technical advice to national partner institutions (e.g. NCDD-S, Ministry of Interior, Ministry of Economy and Finance) on selected implementation issues related to decentralization reform, including fiscal decentralization, non-tax revenues, and regulatory or policy adjustments. WP5.2 - Multi-Level Dialogue and Policy Uptake Technical and procedural support to structure and facilitate multi-level dialogue processes between subnational and national stakeholders. This includes systematisation of evidence from implementation, development of policy briefs and proposals, and documentation of follow-up actions. WP0 - Project Implementation Support (Cross-Cutting) Provision of cross-cutting support services to ensure effective implementation of ISD II. This includes i) Support to the operationalisation of monitoring and evaluation systems; ii) Facilitation and moderation of workshops and coordination meetings; iii) Organisational development and team support measures; iv) Quality assurance and support to results-based reporting; v) Flexible and timely mobilisation and management of short-term experts. The list of work packages is indicative and may be adjusted in line with programme needs. The contractor shall ensure: - High-quality expert selection and management; - High degree of flexibility and adaptability - Integration of cross-cutting principles (gender equality, Leave No One Behind, climate sensitivity, digitalisation, conflict sensitivity); - Effective coordination with GIZ and partner institutions; - Results-based monitoring and reporting in line with contractual requirements. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 18
Technical Assistance for Improved Subnational Service Delivery and Decentralisation Reform Cambodia
The contractor shall provide flexible, demand-driven technical assistance services to support the implementation of the programme "Improved Service Delivery for Citizens in Cambodia II (ISD II)" during the project´s implementation period. Services will be delivered through the mobilisation and management of predominantly short-term national and international experts as well as one senior international long-term advisor. Assignments will be agreed with GIZ under a defined mobilisation procedure and aligned with the programme"s annual operational planning. The scope of services is structured along the following indicative work packages aligned to the output structure of ISD II: WP1.1 - OWSO Service Innovations Provision of technical advisory services to assess, modernise and introduce innovations in One Window Service Office (OWSO) service delivery processes. This includes process diagnostics, development and piloting of digital and administrative innovations (e.g. workflow optimisation, digital tools, mobile services), change management support, and documentation of lessons learned for scaling. WP1.2 - Service Improvement Planning and Demonstration Projects Advisory support to selected Districts and Municipalities (DMs) for the development, endorsement and implementation of participatory, evidence-based and climate-sensitive service improvement plans in selected sectors (e.g. waste management, irrigation, social services). This includes design and implementation support for demonstration measures and documentation of results for replication. WP2.1 - Organisational and HR Strengthening Technical and process advisory services to strengthen organisational structures, internal processes, leadership and human resource management of selected DMs. This includes organisational diagnostics, implementation of improvement measures, gender-responsive HR approaches, and support to women"s leadership. WP2.2 - Planning and Budgeting Strengthening Advisory support to improve planning and budgeting systems of DMs, including participatory and climate-sensitive investment planning, alignment between medium-term and annual budgets, and development and application of practical planning and budgeting tools. WP3.1 - National Participation and Social Accountability Frameworks Provision of technical and strategic advisory services to national partner institutions (e.g. NCDD-S, Ministry of Interior) to strengthen legal, regulatory and institutional frameworks for participation and accountability at DM level. This includes analysis of existing mechanisms, development of reform proposals, and facilitation of consultations. WP3.2 - DM-Level Participation and Accountability Operational advisory support to DMs and relevant stakeholders to strengthen the application of participation and accountability mechanisms in service delivery and planning processes. This may include methodological support to civil society organisations and piloting of integrated accountability workflows, including digital formats where appropriate. WP4.1 - Peer-Learning Networks Technical and process advisory services to establish and institutionalise intra- and inter-provincial peer-learning networks among DMs. This includes design and facilitation of exchange formats, documentation of good practices, and development of scaling products. WP4.2 - Institutionalised Training and E-Learning Support to training institutions (e.g. National School of Local Administration - NASLA) to develop, pilot and institutionalise structured, needs-based training and e-learning formats aligned with lessons generated under ISD II. WP5.1 - Strategic and Legal Reform Advice (NP-2) Provision of technical advice to national partner institutions (e.g. NCDD-S, Ministry of Interior, Ministry of Economy and Finance) on selected implementation issues related to decentralization reform, including fiscal decentralization, non-tax revenues, and regulatory or policy adjustments. WP5.2 - Multi-Level Dialogue and Policy Uptake Technical and procedural support to structure and facilitate multi-level dialogue processes between subnational and national stakeholders. This includes systematisation of evidence from implementation, development of policy briefs and proposals, and documentation of follow-up actions. WP0 - Project Implementation Support (Cross-Cutting) Provision of cross-cutting support services to ensure effective implementation of ISD II. This includes i) Support to the operationalisation of monitoring and evaluation systems; ii) Facilitation and moderation of workshops and coordination meetings; iii) Organisational development and team support measures; iv) Quality assurance and support to results-based reporting; v) Flexible and timely mobilisation and management of short-term experts. The list of work packages is indicative and may be adjusted in line with programme needs. The contractor shall ensure: - High-quality expert selection and management; - High degree of flexibility and adaptability - Integration of cross-cutting principles (gender equality, Leave No One Behind, climate sensitivity, digitalisation, conflict sensitivity); - Effective coordination with GIZ and partner institutions; - Results-based monitoring and reporting in line with contractual requirements.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 30. Juli 2026.
- Who is the contracting authority?
- The contracting authority is Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.