STATSBYGGOSLOTED
Project New Government Block K213 The Park
Design of entire park (12,950 m²) from Akersgata to Møllergata and over portal to Ring 1. Construction of first part (9,200 m²) from Akersgata to Grubbegata. Options include second part (Grubbegata to Møllergata and over portal), other outdoor areas, ramp, bicycle parking, and maintenance contracts.
Straßenbau, Ingenieurbauwerke, Pflasterarbeiten, Landschaftsarchitektur
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- STATSBYGG
- Veröffentlicht:
- 03. Mai 2026
- Frist:
- Nicht angegeben
- Thema:
- Straßenbau
- Bauobjekt:
- Park / Grünanlage
Bauobjekt-Klassifikation
- Park / GrünanlageHauptobjekt
Ausschreibungsbeschreibung
Design of entire park (12,950 m²) from Akersgata to Møllergata and over portal to Ring 1. Construction of first part (9,200 m²) from Akersgata to Grubbegata. Options include second part (Grubbegata to Møllergata and over portal), other outdoor areas, ramp, bicycle parking, and maintenance contracts.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten49 Angaben erfasstUnterlagen
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10RFT 01/26/GM - Works Contractor and PSCS for Construction of the Future Living Laboratory for Atlantic Technological University at the Galway City Campus
Atlantic Technological UniversityLetterkennyFrist: 09. JuniConstruction of a new Future Living Laboratory building of circa 3,975 sq m at ATU Galway City Campus (east side, Ballybane Road). Three floors plus part lower ground with classrooms, seminar rooms, lecture theatres, social spaces, and ancillary areas. Includes pedestrian access to Ballybane Road, bridges connecting to existing building at first floor, road table, alterations to northern car park (removal of modular building, reconfiguration of parking including DAC spaces, set-down, bicycle parking), back-lit signage, photovoltaic panels, site lighting, and all ancillary works.DESIGN AND BUILD TENDER FOR THE CONSTRUCTION, MECHANICAL AND ELECTRICAL INSTALLATIONS, AND FINISHING WORKS OF THE NEW ICA BUILDING WITHIN THE MCAST CAMPUS, PAOLA AS PER NATIONAL GREEN PUBLIC PROCUREMENT STANDARDS
Malta College of Arts Science and TechnologyPaolaFrist: 25. JuliDesign-and-build tender for the new Institute for the Creative Arts building at MCAST Campus, Paola. Approx. 2,800 m² footprint with multi-level underground car park and four floors of training areas. Includes comprehensive design, excavation, construction, mechanical/electrical installations, and all finishes. Estimated value €14 million (indicative). Single works contract.Copenhagen - New Metroline, M5 Transportation System
Metroselskabet I/SKøbenhavn SFrist: 25. Aug.This tender presents a substantial opportunity for prospective contractors to bid for the M5 Transportation System South package (TSS), a critical component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but is also planned to extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. The current tender, Phase 1, encompasses the southern section of the line, from København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes the northern section with an anticipated operatonal commencement of the last part of the northern section in 2045 (included in the transportation system contract (TSS-contract) as options) and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. The procurement comprises the following, together constituting a mixed procurement within the meaning of Article 5 (2) of the Utilities Directive: 1) A TRANSPORTATION SYSTEM for M5 south encompassing the subsystems rolling stock (passenger vehicles, service vehicles and rescue trolleys), railway infrastructure (signaling system and other subsystems, excluding permanent way and power supply "on the line"), and a CMC (control and maintenance center). Furthermore, O&M supplies (supplies related to the O&M providers operation and maintenance activities such as maintenance plans and training). “On the line” refers to deliveries outside the CMC (as the Transportation System Contractor (TSC) is itself responsible for power supply and permanent way within the CMC). The integration of the mentioned TS-subsystems and the integration of the scope of supply of the CWC into the Transportation System (including but not limited to permanent way and power supply on the line) is also part of the TSC's responsibilities and forms part of the TSS-contract. Rolling stock, railway Infrastructure and the CMC are further described in M5-2-TSS-SW (Scope of Work) of the tender material. 2) MAINTENANCE SERVICES following hand over of the Transportation System related to the continued maintenance of the Transportation System (hereinafter Maintenance Services). The TSS-contract covers both the Transportation System and the Maintenance Services. The Maintenance Services are governed by a separate maintenance contract forming an attachment to the TSS-contract (hereinafter Maintenance Contract) The purchase of the Transportation System and the Maintenance Services should therefore be seen as a whole and only one Tenderer will be awarded the contracts. The expected scope and characteristics of the two contracts are described in the tender material. 3) OPTIONS Three (3) options are included in the TSS-contract: Option 1: The purchase of 5 additional passenger vehicles. Option 2: The extension of the transportation system from Prags Boulevard to Refshaleøen. Option 3: The extension of the transportation system from Refshaleøen to Lynetteholm. Metroselskabet’s requirements relating to the Transportation System are set out in the tender documents, including the draft TSS-contract and the Scope of Works document (M5-2-TSS.SW). Requirements may be developed and changed during the competitive dialogue. As regards the Maintenance Contract, no draft contract or draft specifications are included in the Tender Documents at this stage. This reflects the fact that a central element of the competitive dialogue will be to explore the scope and structure of the Maintenance Contract, including the distribution of maintenance tasks between the TS Contractor and the future operator of the Transportation System (hereinafter the OAMC). As a central element of the dialogue phase, the Employer wishes to explore the advantages and implications of possible distributions of maintenance tasks between the TS Contractor and the OAMC and the technical, commercial and legal terms that will be relevant depending on the maintenance model chosen. The potential models to be discussed and assessed during the dialogue phase are expected to span from a scope of the Maintenance Contract similar to TSSSA models (“Technical Support and Spares Supply Agreements”) to a scope similar to FSA models (“Full Service Agreements”) whereby the Employer would procure most goods, works and services needed for the maintenance and continued development of the Transportation System from the TS Contractor. However, also models which are “in between” or a model where the scope will change over time may be chosen. Also the options to purchase additional passenger vehicles and options covering the extension of the line (northern section) are subject to dialogue. Both technical and commercial requirements are expected to be discussed including elements related to pricing. For further detailing of items planned to be subject for dialogue, reference is made to the Instructions to Tenderers (M5-0-TSS-ITT).Inter-institutional single framework contract to support the monitoring of LIFE projects, communication and other support services for the implementation of the LIFE programme
European Climate, Infrastructure and Environment Executive Agency (CINEA), CINEA - European Climate, Infrastructure and Environment Executive AgencyBrusselsFrist: 29. Sept.CINEA and DG ENV require substantial external support in the following areas: 1. Monitoring of LIFE projects, including action grants and operating grants: around 1 000 grants are to be monitored across a wide thematic and geographical coverage. There is a need for an external team of monitors covering the different thematic areas and possessing knowledge of the relevant national or local contexts and languages, in order to ensure proper monitoring of the projects and to provide support where issues arise. 2. Communication on the LIFE programme and project achievements, with a view to outreach and potential replication: this includes, for example, social media, Info Days, the LIFE Awards, other ad hoc events, participation in third-party events, project news, newsletters, and publications. It should be emphasised that LIFE grants support actions at local, regional, and national level that are close to citizens and generate tangible environmental, climate and health benefits. There is therefore a significant volume of material and strong potential to promote a positive image of the EU. 3. Other related activities include policy feedback events and studies or activities, whether online or in-person, upon request from the parent DGs, namely ENV, CLIMA and ENER; annual Welcome Meetings for new projects; and support to projects aimed at facilitating commercial success. Activities will take place in the EU, in third countries associated with the LIFE Programme: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/life/guidance/list3rdcountryparticipation_life_en.pdf and, very rarely, in overseas countries and territories, with fewer than 10 project visits estimated over the duration of the framework contract: https://international-partnerships.ec.europa.eu/countries/overseas-countries-and-territories_enLIMERICK CITY AND COUNTY COUNCIL IRELAND Architect led integrated Design Team Consultancy Services including PSDP for the proposed refurbishment and new build works at No 35 to 39 Nicholas Street
Limerick City and County Council_103432Limerick.Architect Led Multi disciplinary design team to include Conservation Architect G1Structural Fire and M and E Engineers QS Project Manager Site Archaeologist and PSDP The development of a Design and Innovation Hub at Nos 35 to 39 Nicholas Street Limerick a Protected Structure No RPS 7016 to comprise artist studios workspaces retail area exhibition space and restaurant with associated outdoor area adjoining St Peter Street The development will include the erection of new part two storey part single storey building incorporating the upstanding walls of the medieval house and their associated fabric and features at Nos 35 to 39 Nicholas Street the change of use from residential refurbishment and renovation of No 35 Nicholas Street The demolition of a two storey extension to the rear and its replacement with a three storey extension the erection of a single storey workshop unit to the rear of No 35 and all associated site works This development is within the site of Recorded Monuments LI005-017006 and LI005-017123 both classified as House-medievalExpansion of Kvernaland welfare centre - construction work - EP01
Time KommuneBRYNEFrist: 07. Aug.Time municipality shall expand Kvernaland welfare centre with 27 new places. The places shall be organised as book collectives, divided in three departments. Each department consists of nine bed rooms connected to a common living room. The extension shall be adapted to the user group, which primarily consists of elderly persons with dementia, and emphasis will be put on a homely design, good accessibility and robust solutions. The tenders will be published as joint contracts, this tender documentation is for timber. Address: Gamle Åslandsvegen 27, 4355 KvernalandOn the property Gamle Åslandsvegen 25-27, there are the following existing buildings: Children and respite care home with seven places, moved in March 2015Care centre with 24 places, moved in September 2015, Parent initiative with 7 places, moved in January 2017 The expansion is formed as a horse shoe, partly on one floor and partly over two floors. The total area of use (BRA) for the expansion is 2,156 m². A closed sensory garden will form a closed sensory garden with an outer wall in the existing sheltered care centre. In addition: A joint shed with superstructure bicycle parking (BRA: 129 m²) Expansion of the technical building (approx. 15 m²) HVAC installations, An outdoor facility with expanded parking for both bicycles and car Development of a sensory garden and other outside areas shall be constructed.Expansion of Kvernaland welfare centre - electro and automation - EP03 - contract award
Time KommuneBRYNETime municipality shall expand Kvernaland welfare centre with 27 new places. The places shall be organised as book collectives, divided in three departments. Each department consists of nine bed rooms connected to a common living room. The extension shall be adapted to the user group, which primarily consists of elderly persons with dementia, and emphasis will be put on a homely design, good accessibility and robust solutions. The tenders will be published as joint contracts, this tender documentation is for timber. Address: Gamle Åslandsvegen 27, 4355 KvernalandOn the property Gamle Åslandsvegen 25-27, there are the following existing buildings: Children and respite care home with seven places, moved in March 2015Care centre with 24 places, moved in September 2015, Parent initiative with 7 places, moved in January 2017 The expansion is formed as a horse shoe, partly on one floor and partly over two floors. The total area of use (BRA) for the expansion is 2,156 m². A closed sensory garden will form a closed sensory garden with an outer wall in the existing sheltered care centre. In addition: A joint shed with superstructure bicycle parking (BRA: 129 m²) Expansion of the technical building (approx. 15 m²) HVAC installations, An outdoor facility with expanded parking for both bicycles and car Development of a sensory garden and other outside areas shall be constructed.Appointment of an Integrated Design Team for UCC Outdoor Sports Facilities - Phase 1
University College CorkCorkThis competition relates to the appointment of an Integrated Design Team for UCC Outdoor Sports Facilities Phase 1. The design team will be procured via an integrated design team approach, with the Civil and Structural Engineer acting as the integrated design team lead. The principal service providers required to form part of the integrated team are • Civil and Structural Engineering Services (CSE) • Architectural Services (AS). • Mechanical and Electrical Engineering Services (MEP). • Project Supervisor Design Process (PSDP). The first phase to be delivered under the developed master plan is to include the following works. • Mardyke Sports Grounds Facility o The resurfacing of the existing synthetic hockey pitch such that it will be converted into a recreational sporting facility, that can be sub-divided by netting. o New changing rooms adjacent the GAA pitch (circa 300m2) o New boat storage area (90m2) o Upgrading of the existing Floodlight lamp heads to LED. • Proposed UCC Sports Park o 2 synthetic soccer pitches, complete with floodlighting and perimeter fence, o 1 synthetic GAA pitch, complete with floodlighting, ball stop netting and perimeter fence, o 2 new water based synthetic hockey pitches, complete with floodlighting and perimeter fence, o Standalone equipment (90m2) and maintenance stores area (90m2), o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2) o All associated site infrastructure, including roads, paths, parking, drainage utilities, biodiversity spaces etc. • The Curraheen Sports Grounds (The Farm). o Installation of new LED floodlights to three pitches, o Upgrading of the existing Floodlight lamp heads to LED to three pitches; and o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2)Copenhagen - New Metroline, M5 Civil Works South
Metroselskabet I/SKøbenhavn SFrist: 25. Aug.This tender presents a substantial opportunity for prospective contractors to bid for the M5 Civil Works South (CWS) package, an important component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but also extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is designed to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. MAIN COMPONENTS OF THE M5 CIVIL WORK The M5 south consists of approx 6.5 km twin bored tunnels, 5 underground stations(incl. 3 transfer stations),2 underground crossovers,5 cross passages,1 ramp, approx 2.0 km viaduct,1 elevated station, 1 viaduct cross-over,1 elevated bifurcation, short embankment sections. For further details on scope ref. is made to M5-2.1-CMBS-SW and M5-2.2-CWS-SW PHASES: The current tender, Phase 1, encompasses the southern section of the line, from north-west of København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes phase 2 north of v/Prags Boulevard to Lynetteholm opening in 2045 and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. Phase 2 is not included in this tender. CONTRACT SPLIT OF M5: The M5 project as a whole consists of several contracts: • M5 Civil Works South (this contract) • M5 Transportation System South contract (tendered out as a separate contract in parallel with M5 Civil Works South) • Operation and Maintenance South contract (will be tendered out at a later stage) • Enabling Works contracts, e.g. relocation of utilities, relocation works at Kh etc. (enabling works will be tendered out in separate contracts) • Station and Shaft areas (will be tendered out at a later stage) • Canopy contracts (will be tendered out at a later stage). CONTRACT The contract is structured as a design & build contract under ABT18 terms, placing comprehensive responsibility for both design and execution upon the Contractor. This two-phase approach—design followed by execution—is a standard framework for complex infrastructure projects. An extensive market dialogue has been carried out before issuing the tender. The purpose of the market dialogue was to learn from the market what would constitute an attractive contract. Metroselskabet I/S is grateful for all the potential tenderers who took their time to participate in the dialogue and those provided input. INDICATIVE TIMESCHEDULE FOR THE PROCUREMENT Issue of invitation to tender September 29 2026 Launch meeting (individual meetings) October 27 – 29 2026 Deadline for submission of initial tender (submission 1): December 15. 2026 at 14:00 (local Danish time) Negotiation meetings January 4. – April 24 2027 Issue of addendum to tender documents May 4 2027 Deadline for submission of revised tender 1 July 26-28 2027 Negotiation meetings August 23-25 2027 Deadline for submission of revised tender 2 October 4-6 2027 Negotiation meetings October 19-21 2027 Deadline for submission of revised tender 3 November 9-11 2027 Notification of award decision December 20 2027 Expiry of standstill period December 30 2027 Signing of Contract Agreement February 2028 The time-schedule may be subject to change. Changes to the timeschedule will be made available in Byggeprojekt.dk.Cunningham House Redevelopment at Trinity Hall, Dartry, Dublin 6
Trinity College Dublin the University of Dublin_336DublinFrist: 29. JuniThe redevelopment of Cunningham House will consist of an extension to existing purpose-built student accommodation at Trinity Hall with an overall gross floor area of approximately 10,982sqm providing a total of 358 no. purpose-built student bed spaces together with complementary and ancillary uses. The project works will comprise of the demolition of Cunningham House, the Sports Hall (including existing part basement), the eastern section of the historic rear boundary wall and associated single storey ancillary sheds and the provision of 4 no. new connected blocks arranged in a quadrangle form: Block A ranges in height from four to eight storeys; Block B is four storeys in height; Block C is three storeys in height while the Forum Block is single storey in height (partially double height space). The project scope will include: • 358 no. purpose-built student bed spaces • 4 no. staff apartments • 2 no. study spaces/classrooms • A replacement multi-use Sports Hall, together with the adjoining Forum amenity space • Outdoor amenity spaces within the central courtyard together with enhanced public realm and landscaping works • 188 no. bicycle parking spaces within the application site • Single storey security hut at the main vehicular entrance • Works to Oldham House (a Protected Structure) to include works necessary for the demolition and replacement of late 20th century Sports Hall (directly abutting Oldham House). • Provision of a screen wall to the south of Greenane House (a Protected Structure). • All associated and ancillary landscaping works; site lighting; refuse storage; boundary treatments; plant; solar photovoltaic panels; water, wastewater and surface water works; upgrade works to existing electrical substation and all other site and development works.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist STATSBYGG.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.