Metroselskabet I/SKøbenhavn STED
Copenhagen - New Metroline, M5 Transportation System
This tender presents a substantial opportunity for prospective contractors to bid for the M5 Transportation System South package (TSS), a critical component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance...
Busse & Bahnen, Fahrzeugwartung, Verkehrstechnik
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Metroselskabet I/S
- Veröffentlicht:
- 29. Juni 2026
- Frist:
- 25. August 2026
- Thema:
- Busse & Bahnen
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
This tender presents a substantial opportunity for prospective contractors to bid for the M5 Transportation System South package (TSS), a critical component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but is also planned to extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. The current tender, Phase 1, encompasses the southern section of the line, from København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes the northern section with an anticipated operatonal commencement of the last part of the northern section in 2045 (included in the transportation system contract (TSS-contract) as options) and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. The procurement comprises the following, together constituting a mixed procurement within the meaning of Article 5 (2) of the Utilities Directive: 1) A TRANSPORTATION SYSTEM for M5 south encompassing the subsystems rolling stock (passenger vehicles, service vehicles and rescue trolleys), railway infrastructure (signaling system and other subsystems, excluding permanent way and power supply "on the line"), and a CMC (control and maintenance center). Furthermore, O&M supplies (supplies related to the O&M providers operation and maintenance activities such as maintenance plans and training). “On the line” refers to deliveries outside the CMC (as the Transportation System Contractor (TSC) is itself responsible for power supply and permanent way within the CMC). The integration of the mentioned TS-subsystems and the integration of the scope of supply of the CWC into the Transportation System (including but not limited to permanent way and power supply on the line) is also part of the TSC's responsibilities and forms part of the TSS-contract. Rolling stock, railway Infrastructure and the CMC are further described in M5-2-TSS-SW (Scope of Work) of the tender material. 2) MAINTENANCE SERVICES following hand over of the Transportation System related to the continued maintenance of the Transportation System (hereinafter Maintenance Services). The TSS-contract covers both the Transportation System and the Maintenance Services. The Maintenance Services are governed by a separate maintenance contract forming an attachment to the TSS-contract (hereinafter Maintenance Contract) The purchase of the Transportation System and the Maintenance Services should therefore be seen as a whole and only one Tenderer will be awarded the contracts. The expected scope and characteristics of the two contracts are described in the tender material. 3) OPTIONS Three (3) options are included in the TSS-contract: Option 1: The purchase of 5 additional passenger vehicles. Option 2: The extension of the transportation system from Prags Boulevard to Refshaleøen. Option 3: The extension of the transportation system from Refshaleøen to Lynetteholm. Metroselskabet’s requirements relating to the Transportation System are set out in the tender documents, including the draft TSS-contract and the Scope of Works document (M5-2-TSS.SW). Requirements may be developed and changed during the competitive dialogue. As regards the Maintenance Contract, no draft contract or draft specifications are included in the Tender Documents at this stage. This reflects the fact that a central element of the competitive dialogue will be to explore the scope and structure of the Maintenance Contract, including the distribution of maintenance tasks between the TS Contractor and the future operator of the Transportation System (hereinafter the OAMC). As a central element of the dialogue phase, the Employer wishes to explore the advantages and implications of possible distributions of maintenance tasks between the TS Contractor and the OAMC and the technical, commercial and legal terms that will be relevant depending on the maintenance model chosen. The potential models to be discussed and assessed during the dialogue phase are expected to span from a scope of the Maintenance Contract similar to TSSSA models (“Technical Support and Spares Supply Agreements”) to a scope similar to FSA models (“Full Service Agreements”) whereby the Employer would procure most goods, works and services needed for the maintenance and continued development of the Transportation System from the TS Contractor. However, also models which are “in between” or a model where the scope will change over time may be chosen. Also the options to purchase additional passenger vehicles and options covering the extension of the line (northern section) are subject to dialogue. Both technical and commercial requirements are expected to be discussed including elements related to pricing. For further detailing of items planned to be subject for dialogue, reference is made to the Instructions to Tenderers (M5-0-TSS-ITT).
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
6Copenhagen - New Metroline, M5 Civil Works South
Metroselskabet I/SKøbenhavn SFrist: 25. Aug.This tender presents a substantial opportunity for prospective contractors to bid for the M5 Civil Works South (CWS) package, an important component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but also extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is designed to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. MAIN COMPONENTS OF THE M5 CIVIL WORK The M5 south consists of approx 6.5 km twin bored tunnels, 5 underground stations(incl. 3 transfer stations),2 underground crossovers,5 cross passages,1 ramp, approx 2.0 km viaduct,1 elevated station, 1 viaduct cross-over,1 elevated bifurcation, short embankment sections. For further details on scope ref. is made to M5-2.1-CMBS-SW and M5-2.2-CWS-SW PHASES: The current tender, Phase 1, encompasses the southern section of the line, from north-west of København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes phase 2 north of v/Prags Boulevard to Lynetteholm opening in 2045 and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. Phase 2 is not included in this tender. CONTRACT SPLIT OF M5: The M5 project as a whole consists of several contracts: • M5 Civil Works South (this contract) • M5 Transportation System South contract (tendered out as a separate contract in parallel with M5 Civil Works South) • Operation and Maintenance South contract (will be tendered out at a later stage) • Enabling Works contracts, e.g. relocation of utilities, relocation works at Kh etc. (enabling works will be tendered out in separate contracts) • Station and Shaft areas (will be tendered out at a later stage) • Canopy contracts (will be tendered out at a later stage). CONTRACT The contract is structured as a design & build contract under ABT18 terms, placing comprehensive responsibility for both design and execution upon the Contractor. This two-phase approach—design followed by execution—is a standard framework for complex infrastructure projects. An extensive market dialogue has been carried out before issuing the tender. The purpose of the market dialogue was to learn from the market what would constitute an attractive contract. Metroselskabet I/S is grateful for all the potential tenderers who took their time to participate in the dialogue and those provided input. INDICATIVE TIMESCHEDULE FOR THE PROCUREMENT Issue of invitation to tender September 29 2026 Launch meeting (individual meetings) October 27 – 29 2026 Deadline for submission of initial tender (submission 1): December 15. 2026 at 14:00 (local Danish time) Negotiation meetings January 4. – April 24 2027 Issue of addendum to tender documents May 4 2027 Deadline for submission of revised tender 1 July 26-28 2027 Negotiation meetings August 23-25 2027 Deadline for submission of revised tender 2 October 4-6 2027 Negotiation meetings October 19-21 2027 Deadline for submission of revised tender 3 November 9-11 2027 Notification of award decision December 20 2027 Expiry of standstill period December 30 2027 Signing of Contract Agreement February 2028 The time-schedule may be subject to change. Changes to the timeschedule will be made available in Byggeprojekt.dk.Copenhagen - New Metroline M5 Civil Works South – Invitation to Information Meeting
Metroselskabet I/SKøbenhavn SFrist: 25. JuliDear potential tenderer, Metroselskabet I/S invites tenderers to an digital information meeting regarding the tender for Copenhagen - New Metroline M5 Civil Works South At the meeting, Metroselskabet will present the procurement process, including the prequalification phase, the tender phase, and the time schedule for the procurement process. Also, Metroselskabet will present the project and provide an overview of the tender documentation. The tender for Copenhagen New Metroline M5 Civil Works South is expected to be publish at the end of June 2026. Please see below for meeting information. There are no requirements for registration for the meeting. The meeting will take place via Microsoft Teams on: Tuesday 23 June 2026 10:00–11:00 CET (Danish time) Meeting link: https://teams.microsoft.com/meet/363578829324161?p=TFqqDhdfHvBmQHjn6O Interested tenderers may join the meeting directly via the link at the scheduled time. We look forward to see you at the digital information meeting. Kind regards, Metroselskabet I/SCityringen Extension Extension of existing transportation system
Metroselskabet I/SKøbenhavn SThe contract comprises the Transportation System ("TS") for the extension of Cityringen to Nordhavn. Metroselskabet ("MS") is constructing Cityringen in Copenhagen. Cityringen comprises 16 km tunnels, 17 underground stations and 4 shafts. MS is going to construct an extension to Nordhavnen (CRNHE). CRNHE is planned as an elevated line. The metro line will be crossing Skudeløbet in Nordhavn. The extension is expected to ready to open in 2030. The existing M4 line in Nordhavn is an attractive and function part of the network, but the CRNHE project aims to improve in terms of sustainability, passenger experience and operation. The transportation system contract for the Nordhavn Extension comprises all transportation systems and subsystems related to the extension, including Automatic Train Control (ATC), Passenger Security and Information System, Supervisory Control and Data (SCADA), Control Centre, Transmission Systems, and related fully integrated subsystems.Provision of a new Finance Management System (FMS
Educational Research Centre_1014DublinThe Educational Research Centre are inviting tenders for the implementation of a cloud-based Financial Management System. The services to be provided under this contract are as follows: • A cloud-based Financial Management System that meets the requirements described in Appendix 1 of the ITT document. • Complete system delivery including system implementation, system testing, project management, and data migration. • A training programme as well as training materials and documentation. • On-going support and maintenance service.M5 – New Metro Line – Invitation to Information Meeting on Prequalification and Tender for Transportation Systems
Metroselskabet I/SKøbenhavn SFrist: 25. JuliDear potential tenderer, Metroselskabet I/S invites interested tenderers to an digital information meeting regarding the upcoming tender for Copenhagen New Metroline M5 Transportation Systems. At the meeting, Metroselskabet will present the procurement process, including the prequalification phase, the tender phase, and the time schedule for the procurement process. Also, Metroselskabet will present the project and provide an overview of the tender documentation. The tender for Copenhagen New Metroline M5 Transportation Systems is expected to be publish at the end of June 2026. Please see below for meeting information. There are no requirements for registration for the meeting. The meeting will take place via Microsoft Teams on: Thursday 25 June 2026 12:00–13:00 CET (Danish time) Meeting link: https://teams.microsoft.com/meet/31362612115939?p=AoQLqhRmyWLdEzB1Sm Interested tenderers may join the meeting directly via the link at the scheduled time. We look forward to see online. Kind regards, Metroselskabet I/SInstallation of New Biomass Heating System at Aura Leisure Centre, Letterkenny
Donegal County Council_1193LiffordFrist: 17. Aug.Installation of 500kW Biomass Boiler at Aura Leisure Centre including associated mechanical and electrical works to operate and connect to existing heating system and construction of a flue pipe. Storage, loading and thermal storage systems to be installed as part of the works. DCC are novating the design responsibility of the Contract to the main contractor who can propose either an alteration and refurbishment of the existing Biomass system which has been out of use since 2014 due to a basement system which was flooded or a new stand alone system. Alterations to the existing boiler house for the main building is also to be included in the scope of works and this is outlined in the technical specification including a new pressurisation system to be installed.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 25. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Metroselskabet I/S.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.