Sykehusbygg HFTRONDHEIMTED
Procurement of an engineering design group - ARK/RI for renovation of the main operation UNN Breivika (ROB).
Sykehusbygg HF invites tenderers, on behalf of the University Hospital North Norway HF, to a competition for an engineering design group (the architect services and consultancy services) in connection with the renovation of the main operation UNN Breivika (ROB).
Architektur, Tragwerksplanung, TGA-Planung, Brandschutzplanung, Bauüberwachung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Sykehusbygg HF
- Veröffentlicht:
- 01. Juli 2026
- Frist:
- Nicht angegeben
- Thema:
- Architektur
- Bauobjekt:
- Krankenhaus / Klinik
Bauobjekt-Klassifikation
- Krankenhaus / KlinikHauptobjekt
Ausschreibungsbeschreibung
Sykehusbygg HF invites tenderers, on behalf of the University Hospital North Norway HF, to a competition for an engineering design group (the architect services and consultancy services) in connection with the renovation of the main operation UNN Breivika (ROB).
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9Procurement of prefabricated theatres for UNN Breivika (ROB)
Sykehusbygg HFTRONDHEIMFrist: 31. Aug.Procurement of prefabricated theatres for the Renovation Main Operation project at UNN Breivika (ROB).Landscape Architect Design Services for the Renovation and Extension of Main Building, University of Limerick –Multi Phase Project
University of Limerick_1124LimerickPlassey Campus Developments Ltd, University of Limerick wish to appoint a Landscape Architect for the Renovation and Extension of Main Building, University of Limerick –Multi Phase ProjectProcurement of an HRM system for the BIR group.
BIR ASBergenFrist: 10. Aug.The procurement is for the delivery of a comprehensive, cloud-based HRM system with the accompanying implementation, integration, migration and management services for the BIR group.Procurement of an IPL consultant group for the project Senter for psykisk helse Øya - SPH, on behalf of St.Olavs Hospital and NTNU
Sykehusbygg HFTRONDHEIMProcurement of an IPL consultant for the Senter for psykisk helse Øya (SPH) project in Trondheim, a future-oriented centre for research, education, and clinical activities. Project owners: St. Olavs Hospital HF and NTNU, with Sykehusbygg HF as project manager. The contract is an integrated project delivery (IPL) with a three-party agreement. Phase 2 involves submitting tender documents.Supply of engineering services for the design ISS and WDS
The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')BarcelonaThe services of the envisaged contract concern the supply of engineering services for the design of the ITER Isotope Separation System (ISS) and Water Detritiation System (WDS). The two systems can be described as chemical plants processing tritiated water and hydrogen isotope gas streams from the ITER machine. The detritiation of the water is done by WDS and the separation and purification of the hydrogen isotope gas streams is handled by ISS. Deliveries cover final design work on both systems to prepare their manufacturing, along with other tasks like qualification of components and support to the owner. The scope covers also qualification testing of components of ISS, WDS and the REMS the Radiological Environmental Monitoring System and prototyping tasks for some components of the tritium fuel cycle.Architect led design team consultancy services for the development of social housing at the County Hotel site, 102 Main Street, Portlaoise, Co. Laois
Laois County CouncilPortlaoiseArchitect led design team consultancy services required for the development of a social housing scheme at the County Hotel, 102 Main Street, Portlaoise, Co. LaoisTender no.12/2026: Provision of Engineering Services for Front End Engineering Design (FEED), for the Expansion of Vasilikos Port (see description below)
Cyprus Ports AuthorityΛευκωσίαFrist: 31. JuliProvision of Engineering Services for Front End Engineering Design (FEED), Detailed Design of Phase A and Supervision of Phase A Construction Works for the Expansion of Vasilikos Port26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve
Gas Networks IrelandCorkFrist: 25. JuliGas Networks Ireland (GNI) is establishing a Qualification System for the provision of Engineering, Procurement, Construction (EPC) works and services (Lot 1) and Operation and Maintenance (O&M) services (Lot 2) for the Strategic Gas Emergency Reserve (SGER). Lot 1 is for the engineering, procurement, and construction works and services to complete infrastructure assets including but not limited the jetty, trestle, topside structures, pipelines, above ground installation (AGI), integration with FSRU, onshore terminal systems, related ancillary and enabling utilities to site and the management of nominated subcontractor(s). Lot 2 is for operation and maintenance services in relation to jetty, trestle, topside structures, pipelines, integration with FSRU, onshore terminal systems that may be required from time to time to facilitate the operation of the SGER. The Lot 2 contractor will be novated to the Lot 1 contractor for the duration of the EPC period, commissioning and defects correction period, with a subsequent three-year operation and maintenance period commencing from completion of commissioning. A further O&M period of up to five years is anticipated following completion of the initial period. Applicants may apply for and qualify in one or more Lots. GNI has immediate requirements which may be tendered in the near future, through an Initial Competition. Applicants who are interested in participating in the Initial Competition must submit their QSQ responses through the eTenders system by 12.00hrs (Irish time) 18th September 2026, unless amended.CFt for the provision and Implementation of an Integrated SaaS Platform for Skillnet Business Network Operations, Procurement and Learning Management
Bosnia and Herzegovina Railway Public Corporation (BHRPC) and the Railways of Republic of SrpskaDobojFrist: 06. Aug.BioPharmaChem Skillnet, Leading Healthcare Skillnet and Taste 4 Success Skillnet (“the Networks”) are seeking to procure a single cloud-based Software-as-a-Service (SaaS) solution to support the effective administration and management of their operations. The proposed solution must be secure, scalable and fit for purpose, providing the functionality required to improve operational efficiency, support compliance and governance requirements, enhance reporting capabilities, and facilitate the continued growth and evolving needs of the participating Networks
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Sykehusbygg HF.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.