National road 555 Nygårdstunnelen - upgrading of tunnels
Nygårdstunnelen in Bergen was opened in 1999 and is 864 metres long. The tunnel runs from the Puddefjord Bridge to Nygårdstangen, with exit ramps at O.J. Brochsgate. There are 2 lanes from the Puddefjord Bridge, whilst there are 1 lanes from O.J. Brochs gate. These meet in the tunnel so that there are 3 lanes at the exit and entrance at N...
Ingenieurbauwerke, Heizung & Klima, Elektroinstallation, Brandschutz, Gebäudeautomation
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Statens vegvesen
- Veröffentlicht:
- 16. August 2026
- Frist:
- 14. September 2026
- Thema:
- Ingenieurbauwerke
- Bauobjekt:
- Tunnel / Unterführung
Bauobjekt-Klassifikation
- Tunnel / UnterführungHauptobjekt
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
Nygårdstunnelen in Bergen was opened in 1999 and is 864 metres long. The tunnel runs from the Puddefjord Bridge to Nygårdstangen, with exit ramps at O.J. Brochsgate. There are 2 lanes from the Puddefjord Bridge, whilst there are 1 lanes from O.J. Brochs gate. These meet in the tunnel so that there are 3 lanes at the exit and entrance at Nygårdstangen. The annual daily traffic is approx. 45,000. The tunnel shall be upgraded in accordance with the tunnel safety regulations and equipment in and outside the tunnel shall be replaced and replaced with new equipment that meets the current requirements. This includes, among other things: • New ventilation system. • New lighting installations with both new lights in the tunnel roof and continuous evacuation lights. • Extinguishing water shall be set up for the fire brigade. New system for handling emissions and tunnel washing water that fulfils emission requirements. • New signage with barriers, lane signal and variable signs. • Emergency stations with fire extinguishers and telephones. • Camera with coverage throughout the entire tunnel, which gives an alarm during events. • New technical building in the tunnel in the existing mountain room. • A new stop section shall be established at the technical building. • Demolition of existing air treatment plant.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
8County road 49 Fossenbratte tunnel - upgrading of tunnels
Vestland fylkeskommuneLEIKANGERFrist: 16. Sept.The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentationCounty road 48 Fossenbratte tunnel - upgrading of tunnels
Vestland fylkeskommuneLEIKANGERFrist: 16. Sept.The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentationUpgrading of control installations - Gjøvik
SYKEHUSINNKJØP HFVADSØFrist: 21. Aug.The Hospital Innlandet (SI) Gjøvik ́s central processing plant is an EcoStruxure Building Operation (EBO) with AS P and AS B substations. Older parts in the control plant shall be upgraded. The existing older installations are also from Schneider of an older type, Sigma and BAS installations.Procurement of a turnkey contract Hovseter - new special department
Oslobygg KFOsloFrist: 09. Okt.Oslobygg KF has been given the task of establishing a new special department at Hovseter school for pupils with diagnoses within autism spectrum disorders. The total gross area (gross area) is 1,234 m² distributed over two floors as well as a technical roof room. The building shall be constructed from solid wood, with visible wooden surfaces and external aluminium covers and it shall fulfil the requirements for plus house standards. The building shall have robust and adapted systems that meet the target group`s needs. A separate outside area shall be established that shall be integrated in the existing outdoor installations. See the tender documentation Part II - The contract documentation and accompanying annexes for further information on the assignment.Brundalsforbindelsen - K1 Road Works
Trondheim kommuneTRONDHEIMThe Norwegian Public Roads Administration Development invites tenderers, on behalf of Trondheim municipality, to a competition with negotiations for the following contract work: K1 Road Works Brundalsforbindelsen is an environmental package project in Trondheim municipality, regulated in area development for Øvre Rotvoll, approved by the city council 20 May 2021 (case 90/21). A complete certificate must be established before the development at Øvre Rotvoll can be given. The objective of the plan is to facilitate a good and dense residential area with meeting places, function mixing and public services. The plan opens for approx. 1,500 residences, one local centre, two nurseries and sports facilities including a district pool. The Brundal connection, blue-green structures, cultural monuments and central elements of the cultural landscape are also included in the plan. The project includes an approx. 40 m long foot and cycle bridge. It is a significant volume of concrete walls. There is a significant amount of water and sewage work that shall be carried out in this contract and Trondheim municipality ́s water and sewage norms are followed here. There is also considerable district heating work that shall be carried out and coordinated with Statkraft varmes ́s contractor. A waste suction facility shall be established for a future new development where main routes are laid in streets. There will also be significant electrical works as well as safeguarding existing cables and new installations for streets and future houses, where the work will be carried out in co-operation with Tensio.Flåhagen water reservoir
Ringsaker kommuneBRUMUNDDALFrist: 09. Sept.Ringsaker municipality shall construct a new elevated water reservoir at Flåhagen by Nordåsvegen east of the centre of Brumunddal. The new reservoir shall replace the current reservior, which is of older date and has a bad technical condition. The Flåhagen elevated basin supplies the area in Brumunddal, which is lower than the kot 190 south of the River Brumunda. The Flåhagen elevated basin is to be supplied with pumps from Narud waterworks, while pumps at the new reservoir shall supply the further up to the Spikdalen elevated basin in the higher pressure zone. A new arrival shall be established from Nordåsvegen via Testament Road to a new basin, as well as new water pipelines from Mausetvegen to the reservoir and on to the existing Water and Sewage installations at Nordåsvegen. This development is the first stage of a development that also includes a new water supply to the Spikdalen elevated basin. Spikdalen elevated basin with a new water pipeline from Flåhagen elevated basin shall be developed in the next stage to ensure sufficient capacity for future residential areas.Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
Trondheim kommuneTRONDHEIM"Fossumdalen stage 5-6 - Ledningstrasé" is part of a larger water and sewage project in Trondheim municipality that has run, and shall run, over several stages. The aim is to reduce the amount of overflow supplied to The River Nidelva from the sewage network by establishing a separated main stem for W&S from the sewage zone Lerkendal where surface water is led to the River Nidelva, and waste water is fed by a self-fall to Høvringen treatment facility. In "Fossumdalen stage 5-6, Ledningstrasé", the existing overflow (OP04) shall be established in "Fossumdalen stage 4" connects to the Høvringen sewage tunnel via a diving pipeline under the River Nidelva with a flushing magazine. The pipeline installation starts with drilling rock from the west side of Osloveien south of Stavne to Høvringen sewage tunnel. Under osloveien, a sewage pipeline is laid through a completed freighter and dug a ditch to the east between the properties in Sivert Dahlens veg. Pipelines that controlled drilling will be executed under the River Nidelva to Valøya. Over Valøya and up to Valøyslyngen, pipelines are to be dug in a ditch. Pipelines in valøyslyngen shall be executed in an increased dimension, which together with the existing volume in the existing sewage pipeline upstream OP04 (new overflow) functions as flushing magnet for the diving line. The flushing magazine shall be emptied via a flush manhole and the facility shall be adapted for the supply of water from the municipality ́s water pipelines. A new water and sewage system shall also be constructed from OP04 (a new overflow) to the junction of Alfred Larsens gate and Valøyslyngen. From the junction of Alfred Larsens gate and valøyslyngen, a new water pipeline will be laid in the same route as the existing water pipeline to Holtermanns road. The following turnkey contracts will be transported to the general contractor:1 "Fossumdalen stage 5-6 - Sewage pump station" (the existing sewage pump station APS is replaced by a smaller and more modern sewage pump station APS04.2 "Fossumdalen section 5-6, HVAC, management and automation"The general contractor will take over, among other things, the engineering design and coordination responsibility for these two turnkey contracts. As part of "Fossumdalen stage 5-6, Ledningstrasé", a sheet box shall be prepared for a sheet box for setting down the new APS04, and the existing Water and Sewage will be connected to the new APS04.RFI – Licence for ticket hall via automatic tail stop vending machines along the Bergen Light Rail.
SkyssBergenFrist: 25. JuliTransports wishes with this RFI to obtain information from the market for ticket halls at haldeplass automatar along the Light Rail in Bergen. Skyss wishes particularly for permits that can cover the need for ticket rooms from the haldeplass vending machines that Skyss allereie has along the Light Rail. The starting point is that the vending machines shall be used vidare, and that the tenderer shall portray the choir's ticket hall, payment, ID-berar, control and operation can be lied at the existing vending machines.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 14. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Statens vegvesen.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.