Rogaland fylkeskommuneStavangerTED
Legionella control and water quality in heating and cooling installations
The framework agreement is for the prevention of legionella growth in internal water distribution networks. Control and optimisation of water treatment for heating installations. The overall aim of the assignment is to prevent legionella growth and to meet the authorities ́ requirements for maintenance, inspection and control. Furthermore...
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Rogaland fylkeskommune
- Veröffentlicht:
- 11. August 2026
- Frist:
- Nicht angegeben
Ausschreibungsbeschreibung
The framework agreement is for the prevention of legionella growth in internal water distribution networks. Control and optimisation of water treatment for heating installations. The overall aim of the assignment is to prevent legionella growth and to meet the authorities ́ requirements for maintenance, inspection and control. Furthermore, the tenderer shall assist with professional assessments connected to risk assessment, as well as further advice as needed.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten2 Angaben erfasstLose LOT-0001 · Lose LOT-0002
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Operational control water and sewage.
Fredrikstad kommuneFREDRIKSTADFrist: 19. Aug.The procurement is for the procurement of a new operational control plant for all water and sewage installations in Fredrikstad municipality. In addition a framework agreement will be signed for the delivery of new PLC installations, upgrading PLS installations at existing stations, work in connection with changes/additions to the operations control plant and automation work on other installations within water and sewage. A maintenance agreement will also be signed for operation control installations, as well as new and existing PLS installations in the municipality. See the procurement documents for further information.Operational control water and sewage.
Fredrikstad kommuneFREDRIKSTADFrist: 17. Aug.The procurement is for the procurement of a new operational control plant for all water and sewage installations in Fredrikstad municipality. In addition a framework agreement will be signed for the delivery of new PLC installations, upgrading PLS installations at existing stations, work in connection with changes/additions to the operations control plant and automation work on other installations within water and sewage. A maintenance agreement will also be signed for operation control installations, as well as new and existing PLS installations in the municipality. See the procurement documents for further information.Expansion tanks for district heating Værnes
ForsvarsbyggOSLOFrist: 25. Aug.The procurement is a part of a mobile stand-by system for district heating. The Norwegian Defence Estates Agency needs to be able to connect local expansion for the district heating network if central supply is lost. This is to be thought of as mobile expansion tanks that can be connected to the network with flexible connection.Parallel framework agreements for electrical services in water and wastewater installations.
DRAMMEN KOMMUNEDRAMMENThe purpose of this framework agreement is to ensure that the contracting authorities, Drammen Municipality and Glitrevannverket, have access to electrical services for water and wastewater facilities. The framework agreement shall cover the need for electrical services for water and wastewater installations, including, but not limited to, routine maintenance, troubleshooting, installation services, alterations, documentation in the form of drawings and electronic documentation, declarations of conformity, programming of sensors and process equipment, and general work on low-voltage installations up to 1000 V. The framework agreement also includes inspections of electrical installations in water and wastewater installations. The scope of the agreement may include both large and small assignments and projects. The contracting authority intends to enter into parallel framework agreements with three (3) tenderers. Please refer to the procurement documents for further details regarding the contracting authority’s needs.External inspections and control of participants in the power industry and affected parties.
Norges vassdrags- og energidirektorat (NVE)OSLOFrist: 24. Aug.The framework agreement shall ensure the Regulation Authority for Energy (RME) access to consultancy services in connection with inspections and control of participants in the power industry and involved parties. The framework agreement will primarily be used for inspections and controls of the schemes for electricity subsidy and the Norgespris. The framework agreement is not limited to these schemes and it will also be able to cover similar assignments within concurrent thematics, including inspections and controls that are within RME ́s authority. The framework agreement can also include minor assignments where the contractor provides RME assistance with the execution of individual assignments within similar inspection and control processes, for example assistance with data acquisition, data review and analyses. The agreement period for the framework agreement is two years, with an possibility for an extension on verbatim terms for 1+1 year, so that the maximum duration of the agreement period is four years from signing of the contract.Capacity Development for the institute and authorities responsible for quality control of fishery products
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 19. Aug.10024443 - Capacity Development for the institute and authorities responsible for quality control of fishery productsWater and sewage installations from Pinnebekken to Borgen in Ullensaker municipality
Øvre Romerike InnkjøpssamarbeidJessheimFrist: 23. Sept.Ullensaker municipality shall increase the water supply to Borgen, as well as transfer sewage from Borgen to the treatment facility at Gardermoen. The contract for this competition is for the establishment of a new water pipeline, a new waste habit pump pipeline, a conduit for fibre, as well as some surface water pipeline.Installation neuer Wärmepumpen, Heizungsrohre, Radiatoren und Steuerungssysteme
Irish Wheelchair Association (IWA)Frist: 21. Aug.• Remove existing heating services and plant as indicated on the contract drawings. • Install new plant, pipework and ancillaries as per the contract drawings including: o New Heat pumps o Pipework and headers o Pumps o Pressurization unit o Buffer Vessel o Valves, motorized valves and ancillaries o Water pressurization set • Supply and install new LPHW distribution pipework as per contract drawings. • Supply and install any controls associated with the heat pumps, pressurization unit, etc. • Supply and install radiators and radiator control valves as specified throughout • Test and commission and certify the new system • Supply and install new heating control panels and field devices and test and commission system The contractor shall liaise with the client to agree time schedules for heating system and set point temperatures for the system temperature stats. The contractor shall include for a full demonstration of the system to the consultant and the client.Street lighting control cabinet Framework Agreement
LYSE LUX ASSTAVANGERFrist: 21. Aug.Lyse Lux AS shall enter into a framework agreement with one tenderer for the delivery of street lighting control cabinet. The delivery includes street lighting control cabinet in accordance with the requirement specifications, including connection of customer delivered equipment/control units, necessary documentation, engineer support in engineering design work, as well as service, alterations and maintenance as needed. The framework agreement shall cover Lyse Lux AS ́ continuous need for street lighting control cabinet in the contract period. Call-offs will occur as needed and the contracting authority is not obliged to procure a specific volume. The procurement will be carried out as an open tender contest in accordance with the public procurement regulations parts I and III.Arklow Harbour: South Quay Pontoon Electrical Infrastructure Upgrade and Future-Proofing Extension
Wicklow County CouncilWicklow TownFrist: 09. JuliThis project comprises the comprehensive upgrade of marine electrical infrastructure at the Arklow Harbour South Quay network, involving the decommissioning of obsolete distribution equipment and the installation of a new, high-capacity electrical distribution system designed for robust, scalable performance and to allow additional outlets for fishing crew. The scope includes the potential removal of legacy cabling and the installation of marine-grade armoured wiring, new distribution boards, and weather-resistant electrical pedestals, all engineered to support both current operational demands and future multi-berth pontoon expansions. Furthermore, the architecture is specifically configured to integrate future prepaid metering technologies, ensuring a seamless, modern, and efficient utility network that meets the harbour's long-term growth requirements. Areas include: Distribution and Control Infrastructure, Cable Management and Wiring, Earthing and Safety Systems, Lighting Infrastructure and Safety Enhancement, and Pontoon Pedestals.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Rogaland fylkeskommune.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.