BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄGdanskTED
CWS Circulating Water Pumps (Concrete Volute)
The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brack...
Pumpen, Messtechnik, Verfahrenstechnik
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
- Veröffentlicht:
- 19. Juli 2026
- Frist:
- 19. August 2026
- Thema:
- Pumpen
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers in a once through cooling system configuration. There are 9 total concrete volute pumps for the project site (3 x 33% per unit) with a rated flow of 21.3 m3/s (76,668 m3/hr), pump head of 22.5m, and design life of 60 years. There shall be physical model testing and shop performance testing on the pump. NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Deadline (Pre-qualification Submittal): September 2026 (Forecast – Subject to change) RFQ Document Issuance: November 2026 (Forecast – Subject to change) Supplier Proposals Due: January 2027 (Forecast – Subject to change) Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required Onsite Date: Unit 1: June 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Circulating Water Pumps (Concrete Volute)
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄGdanskFrist: 28. Aug.The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers in a once through cooling system configuration. There are 9 total concrete volute pumps for the project site (3 x 33% per unit) with a rated flow of 21.3 m3/s (76,668 m3/hr), pump head of 22.5m, and design life of 60 years. There shall be physical model testing and shop performance testing on the pump.Circulating Water System Intake Equipment Package
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄGdanskFrist: 16. Aug.The scope of work for this package consists of, but is not limited to, designing, furnishing material, fabricating, testing, and delivering complete and fully operational equipment, detailed as: a. Twenty-four (24) automatic dual flow type traveling water screens b. Thirty-three (33) trash racks c. Six (6) motorized trash rack raking systems with associated monorail and support d. structures. Two (2) raking systems per unit where each rake covers six (6) or five (5) trash racks e. Two (2) intake tunnel stop gates (1 per tunnel). Nine (9) circulating water pump suction stop gates. The traveling screens shall be designed for continuous, submerged service in brackish Baltic seawater to support a cooling water intake structure with a depth of 23m. Design conditions for Baltic Sea chloride concentration will be considered and specified further in the RFQ Package. There shall be material selection consideration to exposure conditions such as stagnation, biofouling, mussel formation, and frazil ice formation. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Actual quantities and dimension numbers will be included in official bid package. Deadline (Pre-qualification Submittal): August 2026 (Forecast – Subject to change); RFQ Document Issuance: November 2026 (Forecast – Subject to change); Supplier Proposals Due: January 2027 (Forecast – Subject to change); Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required On Site Date: Unit 1: July 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package. Additional delivery schedule information will be provided in the RFQ PackageRefurbishment and overhaul of intermediate pumps and flushing water pumps
Oslo kommune v/ Vann- og avløpsetatenOsloFrist: 15. Sept.VAV requires the refurbishment and overhaul of pumps and booster pumps at a water treatment plant. The scope of work includes seal repairs and the replacement of wear components and bearings.MARKET SURVEY: Fish egg sorting machine
LuonnonvarakeskusHelsinkiFrist: 02. Aug.Natural Resources Institute Finland (Luke) is planning to procure a fish egg sorting machine for its research infrastructure in Taivalkoski. Luke’s aquaculture facility is located in Taivalkoski, and the fish egg sorting machine is being procured for the handling of live fish eggs, mostly salmonid eggs. The planned procurement concerns a fish egg sorting machine that uses an optical system for fish egg sorting. The machine must be suitable for sorting salmonid eggs, and it must be suitable for sorting dead fish eggs from viable/live fish eggs. The fish eggs to be processed have a diameter of approximately 4–8 millimetres. GENERAL Please note that this is a market consultation notice (hereafter "notice") and that this is not an invitation to tender. The information provided in this notice is preliminary and is subject to change during preparation. The information provided in this notice does not bind Luke in any way. The aim is for the machine to be delivered to Luke by December 2026. Hansel Oy is acting as a consultant role in the procurement. MARKET DIALOGUE We will send a draft version of the call for tenders and its annexes to registered companies, approximately in August 2026. Registered companies are given the opportunity to comment on the draft version in writing. REGISTRATION Companies interested in participating in the market dialogue are invited to submit their contact details by email to [email protected] with the subject line “LUKE: Fish egg sorting machine”. The response should include the company name, VAT number, and the name and email address of the contact person. Responses should be submitted no later than 14th of August 2026.Micro-XRF Analyser
Oulun yliopistoOULUThe object of the procurement is a micro-XRF instrument for non-destructive analysis of materials. The instrument will mainly be used to compositional characterization of different materials in applications related to mining, mineral exploration and circular economy within the Oulu Mining School of University of Oulu. The procurement is co-funded by the Council of Oulu Region (European Regional Development Fund, ERDF), GeoInfra project. The implementation period of the project will end by the end of the year 2025. The procurement depends on the continuation of the implementation period of the project. The procurement contract will be signed with the selected supplier if the funder grants an extension to the project, and if a safety license (described in the "Procurement object criteria" section of the call tenders) is granted by the Radiation and Nuclear Safety Authority (STUK). Please note, the contracting entity has a maximum sum of 360 000 EUR (excluding VAT) available for the procurement and cannot accept tenders exceeding this amount.HVM36 - Penstocks
LandsvirkjunReykjavíkFrist: 03. Sept.The tender concerns the design, manufacture, shop testing, delivery, installation, field testing and commissioning of two steel penstocks with flow measurement systems. The work shall comprise the complete design, manufacture, shop testing, transport, installation, erection, field testing and commissioning of the penstocks and associated equipment, together with all equipment, materials, engineering, temporary works, labour, supervision and services required to provide a complete, satisfactory and fully operational installation. The scope shall include, but not be limited to, the penstocks with flow measurement systems and all related mechanical, electrical and instrumentation work necessary for the proper and reliable operation of the penstocks. Time for completion is estimated to be from April 2027 to January 2031, with installation of the penstocks over the period of April 2028 to January 2030.KKSRA - ERA01, Machinery and process - Prequalification
Sweco Norge ASOsloFrist: 12. Aug.Kragerø municipality shall construct a new central treatment facility that shall replace the five existing municipal treatment facilities. The shut-down installations are Helle, Kil, Kragerø, Kirkesund and Stabbestad. In addition to the closure of the five plants, the new facility shall have the capacity to receive sewage water from a further two private treatment facilities as well as for some further development. The new facility is planned with a capacity of 30,000 PE and it shall fulfil treatment requirements for phosphor removal, secondary purification and nitrogen purification. In addition space shall be set aside for quartz cleaning.Electric Auxiliary Boilers
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ,GdanskFrist: 19. Aug.The scope of work for this package consists of design, furnishing materials, fabrication, inspection, testing, and documentation for packaged electrode type electric boiler, deaerator, blowdown flash tank, boiler feed system, chemical feed system complete with all required controls and instrumentation. The auxiliary boiler has estimated net steam output of 46,000 kg/hr at 13.79 bar. The packaged boiler shall be designed, fabricated, tested and stamped in accordance with EN standards; including but not limited to: a. PN-EN 13445 Unfired Pressure Vessels b. PN-EN 12953 Shell Boilers NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Actual numbers will be included in official bid package.Upgrade SAXS System
Institute of Science and Technology Austria (ISTA)KlosterneuburgUpgrade of a small angle X-ray scattering (SAXS) with Metal Jet source and a wide-angle detector - The first upgrade is installation of additional, stronger (higher flux) source in order to allow for high resolution small-angle measurements, in order to elucidate unambiguously determine structure of nanoparticle assemblies. The second upgrade is with additional wide-angle X-ray scattering (WAXS) detector in order to allow, in combination with current detector, for simultaneous measurement of short-range (atomic level) and long-range order.Stegen Treatment Facility - Process
Indre Østfold kommuneAskimIndre Østfold municipality (IØK) shall construct a new sewage treatment facility. A preliminary project has not been prepared. The municipality would like to develop an optimal system in cooperation with the turnkey contractor process and turnkey contractor building, as well as their respective contract helpers. This competition is for the procurement of a turnkey contractor process. A separate procurement of a turnkey contractor building is being announced.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 19. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.