Health Service Executive (HSE)KildareTED
Accommodation refurbishment at CAMHS, St. Fintan’s, Portlaoise, Co. Laois
Building extension housing new circulation core, internal alterations on first floor, with external landscape works and all associated site works at St. Fintan’s Hospital, Portlaoise.
Fassade & Putz, Trockenbau, Pflasterarbeiten, Nichtwohnungsbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Health Service Executive (HSE)
- Veröffentlicht:
- 13. August 2026
- Frist:
- 18. September 2026
- Thema:
- Fassade & Putz
- Bauobjekt:
- Krankenhaus / Klinik
Bauobjekt-Klassifikation
- Krankenhaus / KlinikHauptobjekt
Ausschreibungsbeschreibung
Building extension housing new circulation core, internal alterations on first floor, with external landscape works and all associated site works at St. Fintan’s Hospital, Portlaoise.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
8View CfT Workspace
Health Service Executive (HSE)Frist: 13. Aug.Building extension housing new circulation core, internal alterations on first floor, with external landscape works and all associated site works at St. Fintan’s Hospital, Portlaoise.Refurbishment and thermal upgrade of existing science rooms at St Jarlath’s College, Tuam, Co. Galway
St. Jarlath’s CollegeTuam, Co. GalwayFrist: 24. JuliDemolition works including, Removal of all gas, electrical and drainage pipework Demoltion and removal floor finishes, fittings etc. as indicated Demoltion and removal of all fitted furniture Removal of all wet insulation from the attic Construction works including Construct new internal chemical store Insulation of the external walls and over ceilings Construct internal walls, floors, roofs, fittings etc. as indicated New finishes and services New fixed furniture Painting and decorating Roof Repairs at the soffit and gable Services Trenches within ground floor science rooms for electricity and gas Cores in the concrete first floor electricity and gas Four pipes to bring the fume cupboard and chemical store extranct to the outside. Services as outlined on Mechanical and electrical drawings and specification, to extension and existing Provision of 3No. Fume CupboardsExtension to Kilmacanogue National School, Kilmacanogue, Co. Wicklow
Kilmacanogue National SchoolBrayFrist: 07. Aug.Provision of a single storey extension to side (consisting of 2 no. mainstream classrooms - proposed floor area = 169sqm) of existing single storey school building (existing floor area = 1,273sqm) together with new basketball court and all associated site works.Additional office areas to Corlann Services Clare training centre at Gort Road Industrial Park, Ennis
Brothers of Charity Services IrelandClarinbridgeFrist: 14. Aug.The works comprise the refurbishment and alteration of an existing training centre including the construction of a new structural intermediate first floor (mezzanine) within the existing building envelope to provide additional office accommodation, installation of a new enclosed platform lift complete with lift shaft, structural steelwork and associated foundations, provision of new first floor windows, formation of a protected escape corridor and new emergency escape exit, installation of new fire-rated compartment floors, ceilings and partitions, fire door upgrades, refurbishment of existing sanitary facilities, new kitchenette and fitted furniture, mechanical and electrical services alterations including fire alarm and emergency lighting modifications, internal finishes, and all associated builders' work and ancillary site works necessary for the complete execution of the project.Carra Mor Community Dwelling, Lifford, Ennis, Co. Clare – Extension, Refurbishment, Heating System Upgrade and Associated Site Works
CorlannClarinbridgeFrist: 02. Sept.The proposed works comprise the construction of a new single-storey extension and associated refurbishment and alteration works to an existing community dwelling at Carra Mor Community Dwelling, Lifford, Ennis, Co. Clare (V95 Y4A6). The project includes the construction of a new extension incorporating an accessible assisted bathroom, accessible ensuite, equipment room, storage room and connecting corridor. Internal refurbishment works include the conversion of existing shared sanitary facilities into six individual ensuites, construction of a new sluice room, widening of internal door openings, fire door upgrades, and associated alterations to plumbing, drainage, ventilation, electrical and fire alarm systems. External works comprise the construction of a new galvanised steel bus canopy with laminated glazed roof, reinforced concrete hardstanding, relocation of existing parking spaces, new kerb works, foul and surface water drainage alterations, soakaway, landscaping reinstatement and all associated site development works. The contract also includes a comprehensive upgrade of the existing heating and domestic hot water installation, including the removal of the existing oil-fired plant and the installation of a new external high-efficiency condensing oil boiler, new twin-coil hot water cylinder, circulating pumps, heating controls, plantroom modifications, associated electrical works, and extension of the heating system to serve the new accommodation. The Contractor shall provide all labour, materials, plant, temporary works, testing, commissioning, certification, operation and maintenance manuals, and all ancillary works necessary to deliver a complete, fully operational facility in accordance with the drawings, specifications and contract documents.Proposed Road Extension at IDA Business and Technology Park, Ardmore, Mullingar, Co. Westmeath
IDA IrelandDublinConstruction of an extension approximately 85 metres long to the existing internal road with hammer head to allow future access to sites with a footpath on both sides, public lighting and all associated civil works and landscaping.Single Storey Extension to Front of Existing School, alterations to existing school and all ancillary site works at St. Colmans NS, Mucklagh, Co. Offaly.
Board of Management St. Colmans NSTullamoreFrist: 30. JuliSingle Storey Extension to Front of Existing School, alterations to existing school and all ancillary site works at St. Colmans NS, Mucklagh, Co. Offaly.EST MW UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick
Health Service Executive (HSE)KildareFrist: 11. Sept.The project comprises the vertical expansion of an existing 24-bed ward (Block G) building, which was constructed under emergency legislation during the COVID-19 pandemic and is located on the University Hospital Limerick campus, which is an acute hospital. The vertical expansion will provide 72 additional beds across three new ward levels, together with staff and ancillary accommodation, plant room at the fourth floor and part of the fifth floor, and additional vertical circulation, including 2 new stair cores and lifts with an overall floor area of circa 6,617 m2 inclusive of the plantroom area and all ancillary site development above and below ground. The works will take place within an operational campus adjacent to live 24/7 clinical departments.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 18. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Health Service Executive (HSE).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.