CorlannClarinbridgeTED
Carra Mor Community Dwelling, Lifford, Ennis, Co. Clare – Extension, Refurbishment, Heating System Upgrade and Associated Site Works
The proposed works comprise the construction of a new single-storey extension and associated refurbishment and alteration works to an existing community dwelling at Carra Mor Community Dwelling, Lifford, Ennis, Co. Clare (V95 Y4A6). The project includes the construction of a new extension incorporating an accessible assisted bathroom, acc...
Sanitär, Heizung & Klima, Elektroinstallation, Brandschutz, Rohbauarbeiten
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Corlann
- Veröffentlicht:
- 30. Juli 2026
- Frist:
- 02. September 2026
- Thema:
- Sanitär
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The proposed works comprise the construction of a new single-storey extension and associated refurbishment and alteration works to an existing community dwelling at Carra Mor Community Dwelling, Lifford, Ennis, Co. Clare (V95 Y4A6). The project includes the construction of a new extension incorporating an accessible assisted bathroom, accessible ensuite, equipment room, storage room and connecting corridor. Internal refurbishment works include the conversion of existing shared sanitary facilities into six individual ensuites, construction of a new sluice room, widening of internal door openings, fire door upgrades, and associated alterations to plumbing, drainage, ventilation, electrical and fire alarm systems. External works comprise the construction of a new galvanised steel bus canopy with laminated glazed roof, reinforced concrete hardstanding, relocation of existing parking spaces, new kerb works, foul and surface water drainage alterations, soakaway, landscaping reinstatement and all associated site development works. The contract also includes a comprehensive upgrade of the existing heating and domestic hot water installation, including the removal of the existing oil-fired plant and the installation of a new external high-efficiency condensing oil boiler, new twin-coil hot water cylinder, circulating pumps, heating controls, plantroom modifications, associated electrical works, and extension of the heating system to serve the new accommodation. The Contractor shall provide all labour, materials, plant, temporary works, testing, commissioning, certification, operation and maintenance manuals, and all ancillary works necessary to deliver a complete, fully operational facility in accordance with the drawings, specifications and contract documents.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9Roscrea renovation and refurbishment works, community dwelling
Marillac Housing Association CLGDublinFrist: 24. JuniThe works comprise internal and external renovation and refurbishment of an existing single-storey community dwelling at Roscrea, Co. TipperaryRefurbishment and Extension of New Ross Library
Wexford County CouncilWexfordFrist: 17. Aug.The works comprise the construction of a new extension wrapping the south, west and north elevations of the existing library building, the creation of a new first floor within the existing structure, and a full internal refurbishment to provide modern, accessible library and community facilities. The project is to be procured under the restricted procedure.Construction works to include extensions alterations and refurbishment to Rossnakill Community Centre Rosnnakill Co Donegal.
Rossnakill Community Hub Company Limited by GuaranteeLetterkennyFrist: 17. JuliConstruction works to include extensions alterations and refurbishment to Rossnakill Community Centre Rosnnakill Co Donegal.Construction works to include extensions alterations and refurbishment to Rossnakill Community Centre Rosnnakill Co Donegal.
Rossnakill Community Hub Company Limited by GuaranteeLetterkennyFrist: 08. JuliConstruction works to include extensions alterations and refurbishment to Rossnakill Community Centre Rosnnakill Co Donegal.Additional office areas to Corlann Services Clare training centre at Gort Road Industrial Park, Ennis
Brothers of Charity Services IrelandClarinbridgeFrist: 14. Aug.The works comprise the refurbishment and alteration of an existing training centre including the construction of a new structural intermediate first floor (mezzanine) within the existing building envelope to provide additional office accommodation, installation of a new enclosed platform lift complete with lift shaft, structural steelwork and associated foundations, provision of new first floor windows, formation of a protected escape corridor and new emergency escape exit, installation of new fire-rated compartment floors, ceilings and partitions, fire door upgrades, refurbishment of existing sanitary facilities, new kitchenette and fitted furniture, mechanical and electrical services alterations including fire alarm and emergency lighting modifications, internal finishes, and all associated builders' work and ancillary site works necessary for the complete execution of the project.Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí
Údarás Na Gaeltachta_289GalwayThe proposed works will include internal modification, the construction of an extension (10m2), a glazed entrance lobby and a covered outdoor area, replacement of the existing wastewater treatment system and percolation area with a packaged Wastewater Treatment System and all associated works.Proposed Road Extension at IDA Business and Technology Park, Ardmore, Mullingar, Co. Westmeath
IDA IrelandDublinConstruction of an extension approximately 85 metres long to the existing internal road with hammer head to allow future access to sites with a footpath on both sides, public lighting and all associated civil works and landscaping.Extension to Bohermore National School, Ballysimon, Co. Limerick
Bohermore National SchoolLimerickFrist: 14. Aug.The Contracting Authority are seeking tenders for the construction of a single storey entrance porch and canopy to the front of the existing school building, the construction of a single storey extension to the side and rear of the existing school building comprising of 1 no. Classroom with associated Quiet Space, with toilet and shower area, and 1 no. Central Activities Space, with 1 no. Daily Living Skills area, and associated ancillary accommodation, external and internal modifications to the existing school building, alterations to the existing facades, and ancillary site works.Extension to St. Clare's National School Ballyjamesduff
BT-500-St. Clare's National School BallyjamesduffBallyjamesduffFrist: 21. Aug.Construction of a two-storey extension to the northwest side of St. Clare’s National School, Ballyjamesduff, Co. Cavan, comprising two mainstream classrooms with ensuite facilities, a Special Education Teaching (SET) room, office, storage room, and wheelchair accessible WC. The project also includes the creation of a new secondary entrance to the rear of the site, together with associated landscaping, drainage works, and all ancillary site development works at St. Clare's National School, Virginia Road, Ballyjamesduff, Co. Cavan, A82, XN67 on behalf of the Board of Management of St. Clare's National School.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 02. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Corlann.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.