Health Service Executive (HSE)KildareTED
EST MW UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick
The project comprises the vertical expansion of an existing 24-bed ward (Block G) building, which was constructed under emergency legislation during the COVID-19 pandemic and is located on the University Hospital Limerick campus, which is an acute hospital. The vertical expansion will provide 72 additional beds across three new ward level...
Sanitär, Heizung & Klima, Elektroinstallation, Aufzüge, Nichtwohnungsbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Health Service Executive (HSE)
- Veröffentlicht:
- 09. August 2026
- Frist:
- 11. September 2026
- Thema:
- Sanitär
- Bauobjekt:
- Krankenhaus / Klinik
Bauobjekt-Klassifikation
- Krankenhaus / KlinikHauptobjekt
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The project comprises the vertical expansion of an existing 24-bed ward (Block G) building, which was constructed under emergency legislation during the COVID-19 pandemic and is located on the University Hospital Limerick campus, which is an acute hospital. The vertical expansion will provide 72 additional beds across three new ward levels, together with staff and ancillary accommodation, plant room at the fourth floor and part of the fifth floor, and additional vertical circulation, including 2 new stair cores and lifts with an overall floor area of circa 6,617 m2 inclusive of the plantroom area and all ancillary site development above and below ground. The works will take place within an operational campus adjacent to live 24/7 clinical departments.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
5EST MW - Economic and Cost Consultancy Services - St. John's Hospital, Limerick Bed Capacity Expansion Project
Health Service Executive (HSE)KildareFrist: 13. Sept.HSE Capital and Estates Mid-West seeks to appoint an Economic Consultancy Team to provide economic, financial, business case and cost consultancy services for the proposed development of a new 78-bed ward, refurbishment of existing wards, associated staff accommodation and supporting infrastructure at St. John's Hospital, Limerick. Services include preparation of a Strategic Assessment Report, Preliminary Business Case, Detailed Business Case, Final Business Case, HSE Capital Option Appraisal and Procurement Strategy.Est Constr Surgical Hub at Merlin Park University Hospital Galway
Scoil Naisiunta Cillin LiathCillin Liath NS, Mastergeehy ,Co KerryThe development will comprise of the following: •The provision of a three storey Surgical Hub building (Gross Floor Area: 4,265 sq.m) to include: o Staff Services, Storage and Plant Rooms at Ground Floor Level; o Operating Theatres, Preparation Area, Recovery Area , Waiting Area and ancillary support services at First Floor Level; and o Plant and associated equipment at Second Floor Level. • The provision of roof mounted Solar PV Panels; • The provision of 108 no. car parking spaces (including 6 no. accessible spaces and 20 no. EV charging spaces); • The provision of a new bus stop to be located adjacent to the proposed development; and • All landscaping and other associated site development works required to facilitate the proposed development. The contractor should note that this project is to be undertaken as a RAPID build construction project implementing modern methods of construction and innovation to deliver within necessary project requirements and constraints. Progression of the Surgical Hub at MPUH in 2023 has been identified as a key focus of government initiatives per the Slaintecare Action Plan 2023. The facility is urgently required to address national and local healthcare provision targets and needs for day surgery across the West region. It will reduce waiting lists for day cases and ensure the provision of surgical day case procedures of lower acuity in a timely manner whilst receiving the best quality service.Multi- Party Framework Agreement for HSE West Employers Representative Services - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareMulti- Party Framework Agreement for HSE West Employers Representative Services Framework 2025 - Framework 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West region (Galway, Mayo and Roscommon). The Initial project will consist of the construction of a new build 75 bed Community Nursing unit (CNU) within the Ballina District Hospital campus with direct linkages into the existing Ballina District Hospital. The new build 75 bed Community Nursing unit (CNU) will consist of 3 floors with 25 single ensuite bed room accommodation to HIQA standards for Residential Care Settings for Older People in Ireland at each level Ground Floor, First Floor, Second Floor (level 0,1, 2) along with linkages to existing hospital street, new stairways, service lift and new 2 Nr. Bed Lifts, including new carpark areas, etc. Note: on the Ground Floor there will be 10 single ensuite bedrooms which will be allocated to residents with dementia. There will also be extensive re-planning, upgrade works and reconfiguration of the existing district hospital female wing including physiotherapy area within the single storey and the two-storey central building structure, to provide commercial production kitchen with ancillary support rooms, physiotherapy area, laundry, staff changing and Day-care Services, etc; to complete the interface works with new the 75-bed CNU unit on site. The floor area of this project is in the region of 7,960 m2 which consists of the following: Demolishing the existing building structure on site, Construction and fit-out of a new 75 bed Community Nursing unit over 3 floors and roof top M E Plant room include extensive garden areas for the CNU, Refurbishment of the Existing Main District Hospital, Construction of new Car parking areas on site, Construction of a new Sub-station building including generator room and the Construction of a new medical building. Each element of building works, Demolishing, Diversion of Underground Services, coMulti- Party Framework Agreement for HSE West Building Services Engineering (M+E) - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareMulti- Party Framework Agreement for HSE West Building Services Engineering (M+E) Framework 2025 - Framework 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West region (Galway, Mayo and Roscommon). The Initial project will consist of the construction of a new build 75 bed Community Nursing unit (CNU) within the Ballina District Hospital campus with direct linkages into the existing Ballina District Hospital. The new build 75 bed Community Nursing unit (CNU) will consist of 3 floors with 25 single ensuite bed room accommodation to HIQA standards for Residential Care Settings for Older People in Ireland at each level Ground Floor, First Floor, Second Floor (level 0,1, 2) along with linkages to existing hospital street, new stairways, service lift and new 2 Nr. Bed Lifts, including new carpark areas, etc. Note: on the Ground Floor there will be 10 single ensuite bedrooms which will be allocated to residents with dementia. There will also be extensive re-planning, upgrade works and reconfiguration of the existing district hospital female wing including physiotherapy area within the single storey and the two-storey central building structure, to provide commercial production kitchen with ancillary support rooms, physiotherapy area, laundry, staff changing and Day-care Services, etc; to complete the interface works with new the 75-bed CNU unit on site. The floor area of this project is in the region of 7,960 m2 which consists of the following: Demolishing the existing building structure on site, Construction and fit-out of a new 75 bed Community Nursing unit over 3 floors and roof top M E Plant room include extensive garden areas for the CNU, Refurbishment of the Existing Main District Hospital, Construction of new Car parking areas on site, Construction of a new Sub-station building including generator room and the Construction of a new medical building. Each element of building works, Demolishing, Diversion of Underground Services, construction of the new 75 bed CNU, etc, will be tendered as a separate construction contracts (such as enabling works packages main construction package), subject to statutory approvals, HSE Approvals, Funding etc., Please see SAQ document pack.Expansion of Kvernaland welfare centre - construction work - EP01
Time KommuneBRYNEFrist: 07. Aug.Time municipality shall expand Kvernaland welfare centre with 27 new places. The places shall be organised as book collectives, divided in three departments. Each department consists of nine bed rooms connected to a common living room. The extension shall be adapted to the user group, which primarily consists of elderly persons with dementia, and emphasis will be put on a homely design, good accessibility and robust solutions. The tenders will be published as joint contracts, this tender documentation is for timber. Address: Gamle Åslandsvegen 27, 4355 KvernalandOn the property Gamle Åslandsvegen 25-27, there are the following existing buildings: Children and respite care home with seven places, moved in March 2015Care centre with 24 places, moved in September 2015, Parent initiative with 7 places, moved in January 2017 The expansion is formed as a horse shoe, partly on one floor and partly over two floors. The total area of use (BRA) for the expansion is 2,156 m². A closed sensory garden will form a closed sensory garden with an outer wall in the existing sheltered care centre. In addition: A joint shed with superstructure bicycle parking (BRA: 129 m²) Expansion of the technical building (approx. 15 m²) HVAC installations, An outdoor facility with expanded parking for both bicycles and car Development of a sensory garden and other outside areas shall be constructed.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 11. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Health Service Executive (HSE).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.