Iarnród Eireann-Irish RailDublinTED
(9850) Retaining Wall RWR009D
Vegetation clearance, power washing and masonry repair and repointing, located between Bath Avenue and Lansdown Road.
Ingenieurbauwerke, Mauerarbeiten, Malerarbeiten
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Iarnród Eireann-Irish Rail
- Veröffentlicht:
- 19. Juli 2026
- Frist:
- Nicht angegeben
- Thema:
- Ingenieurbauwerke
- Bauobjekt:
- Stütz- / Lärmschutzwand
Bauobjekt-Klassifikation
- Stütz- / LärmschutzwandHauptobjekt
Ausschreibungsbeschreibung
Vegetation clearance, power washing and masonry repair and repointing, located between Bath Avenue and Lansdown Road.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9(9096-65) Masonry Repair and Repointing
Iarnród Eireann-Irish RailDublinMasonry repair and repointing of retaining wall between Barrow Street and South Lotts Road in the Ballsbridge area of Dublin City.Islandbridge Commemorative Bridge- Main Contractor
IDA IrelandDublinIt has been agreed with the Heritage properties to undertake works to the Commemorative bridge at Island Bridge, Dublin 8. The proposed pedestrian/cycle bridge comprises: • A new pedestrian and cycle bridge which will span the River Liffey and connect to an existing cycle way running along Chapelizod Road; • A formal entrance at Chapelizod Road; • An open plaza linking the entrance and bridge, to be located at the National Wat Memorial Gardens and at lands to north of River Liffey, Chapelizod Road, Islandbridge, Dublin 8. In order to ensure the safe passage of pedestrians and cyclists across the Chapelizod Road to and from the proposed open plaza, a new pedestrian crossing will be required The Irish National War Memorial Gardens are located at a place of great Historical, Cultural and Geographic importance.Reconstruction of the Bridge at km 41+040 of the Public Road of National Importance M-15 Odesa - Reni (to Bucharest), Odesa region
State Agency for Restoration and Development of Infrastructure of UkraineKyivFrist: 10. Sept.The Client seeks the execution of the Works described below to reconstruct the bridge at km 41+040 of the public road of national importance M-15 Odesa–Reni (toward Bucharest), located in Odesa region The design documentation provides for the rehabilitation and strengthening of the road embankment under terrain of complexity of Category I-b and II, with a total length of 742.86 m (right carriageway). The designed total length of the bridge is 216.65 m. This section is located in the village of Mayaki, Mayaki Territorial Community, Odesa district of Odesa region on the route to the Ukrainian-Moldavian border. The public road of national importance M-15 Odesa–Reni (toward Bucharest), with a total length of approximately 295 km, is designated as an international road in accordance with the Resolution of the Cabinet of Ministers of Ukraine of 30 January 2019. The M-15 forms an integral part of Pan-European Transport Corridor IX and the international TRACECA corridor, constituting a key transport axis facilitating international freight and passenger movement between Ukraine, the Republic of Moldova and Romania (the EU).Prequalification Contract 2441 Steel profile doors and walls - New Aker
Helse Sør-Øst RHFHAMARFrist: 21. Aug.The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The somatics building has a total area of approx. 130,000 m2 and it is divided into base and high-rise buildings.2441 Steel profile doors and walls consist of the following main services: Profile doors, where the majority of the doors are steel profile doors, whilst the doors at the wind trap are aluminium profile doors, steel profile doors with glass/fixed field on the side and overAluminium ́s profile doors with glass/fixed field on the side and overSkyved doors in steel profile with glass/fixed field on the side and overglass/fixed field without door. Steel and AluminiumThe execution of Urgent Repairs and Rehabilitation works in the garden and perimeter walls of the House of Scientists in Odesa
UNESCOAfghanistanFrist: 14. Sept.UNESCO invites eligible national and international construction companies to submit a bid for the execution of urgent repairs and rehabilitation works in the garden and perimeter walls of the House of Scientists in Odesa, Ukraine, in accordance with the present solicitation documents. The works include: repair/execution of finishing layers on the garden-facing side of the perimeter walls; repair of the drainage system; repair/reintegration of external flooring; reconstruction of damaged inner and outer balustrades; installation of a temporary metal structure; and temporary stabilization of one of the entrances to the garden from the external street. The anticipated time for completion of the works is 5 calendar months from the date of the Notice to Proceed. UNESCO will organize a site visit to the House of Scientists, 4 Sabaneev Bridge, Odesa, Odesa Oblast, 65000, as follows: Date: 21 August 2026 Time: 11:00 local time The site visit will be followed by a clarification meeting providing additional information on the bidding process and the required works. Participation in the site visit is not mandatory but is strongly encouraged, in order to enable bidders to familiarize themselves with the site conditions and reduce the risk of submitting a non-compliant bid. Bidders wishing to participate in the site visit shall register by sending an email to [email protected] no later than 19 August 2026. Each bidder shall bear its own costs related to participation in the site visit and clarification meeting. Interested bidders are encouraged to request the full solicitation documents by contacting [email protected]. The purpose of this notice is to provide general information on the requirements for the procurement process and to inform interested suppliers how to apply to the invitation to bid.County road 49 Fossenbratte tunnel - upgrading of tunnels
Vestland fylkeskommuneLEIKANGERFrist: 16. Sept.The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentationFoynes to Limerick Road (including Adare Bypass) – Adare to Attyflin Construction Contract
Limerick City and County Council_103432Limerick.Limerick City and County Council in partnership with Transport Infrastructure Ireland (TII) is seeking tenders for the Foynes to Limerick Road (including Adare Bypass) - Adare to Attyflin Construction Contract, which will be procured under the NEC4 Option C form of Contract. The Adare to Attyflin Construction Contract includes but is not limited to: - approximately 3.5km of new M21 motorway from Adare to Attyflin which will involve approximately 1.5km of offline works and approximately 2km of online works along the existing N21. The works also include approximately 0.5 km of pavement inlay works towards the tie-in at the Attyflin junction, associated connections to and realignment of existing National, and Local roads, site clearance, including demolition of existing structures/non-structures, structures/non-structures include 2 no. VMS signage gantries; noise barriers and various accommodation works, mammal underpasses, culverts and modification of existing structures/non-structures, Highway drainage and associated attenuation ponds. The Adare to Attyflin section of the Project, is required to be fully operational by June 2027, in advance of the 2027 Ryder Cup. The above paragraphs are a summary only and Tenderers are directed to read and formulate their Tenders based on all of the provisions of the Contract as detailed in the Scope and other Tender Documents that can be found in the Virtual Data Room (VDR).Walls and concrete services for Helse Bergen HF
SYKEHUSINNKJØP HFVADSØFrist: 10. Aug.Masonry services for Helse Bergen HF. Estimated annual value: NOK 2,100,000 excl. VAT. Maximum total value including options: NOK 15,000,000 excl. VAT.Erneuerung Krbw. Walle in Bremen, Strecke 1740 km 125,736
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)Frankfurt MainFrist: 26. Aug.Erneuerung der Kraftfahrzeugbrücke Walle in Bremen: Bau eines neuen Stahlbeton‑Vollrahmenbrückens mit beidseitigen Trogelementen zur Böschungssicherung und Anhebung der Fahrgradienten über ca. 600 m.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Iarnród Eireann-Irish Rail.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.