European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsTED
Supply of natural gas JRC Geel
JRC-Geel intends to conclude a contract for the continuous supply of (renewable) natural gas to the JRC-Geel. The gas is to be used to heat three buildings on the JRC-Geel premises.
Energy Supply
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs
- Published:
- July 12, 2026
- Deadline:
- August 12, 2026
- Topic:
- Energy Supply
Tender description
JRC-Geel intends to conclude a contract for the continuous supply of (renewable) natural gas to the JRC-Geel. The gas is to be used to heat three buildings on the JRC-Geel premises.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
4 data areas available
30 days free · no credit card · cancel anytime
Related tenders
8Versorgung mit Erdgas für das JRC-Geel
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsJRC-Geel intends to conclude a contract for the continuous supply of (renewable) natural gas to be used to heat three buildings on the JRC-Geel premises.Framework contract for interior design and the delivery of furniture at the JRC Geel and Petten site.
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Aug 06The JRC Geel and Petten wants to conclude an interior design and furniture contract for the future equipment of its offices and working spaces. The interior design part should allow for working spaces that are in line with the vision of the JRC being compliance with New European Bauhaus and flexible working spaces. Delivery shall be foreseen in Petten as well as in Geel.Procurement of natural gas
JP "Kumanovo-Gas" KumanovoKumanovoDeadline: Jul 17Procurement of natural gasProvision of safety support services at JRC-GEEL
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Jul 24Radiation protection support services for JRC-Geel, supporting legal controls by the Health Physics Service, essential for nuclear facility operation. Must comply with Belgian Royal Decree of 20/07/2001 (ARBIS) on ionizing radiation protection.Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Jul 25The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEX-classified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: - An MV/LV transformer - A thermal management system (dry cooler) - A low-pressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 - A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3-year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for self-consumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's co-generators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand fromLA3468F - UCD - CFT for a Single Supplier Framework Agreement for the Supply, Delivery, Installation, Commissioning and Calibration of a Head Space Gas Chromatograph Instrument
Education Procurement Service (EPS)LimerickThe Medical Bureau of Road Safety (MBRS), University College Dublin, request tenders for the Supply, Delivery, Installation and Commissioning of a Headspace Gas Chromatograph with Flame Ionisation Detection Instrument used for the identification and quantitation of ethanol in biological specimen under Road Traffic Act legislation. The framework budget may be used to purchase three (3) Headspace Gas Chromatograph with Flame Ionisation Detection Instruments over the lifetime of the framework.Supply and preparation for nuclear environment of an ONH gas analyser in metals
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Aug 12The JRC Karlsruhe plans to purchase a ONH elemental analyser to determine Hydrogen and Oxygen content in irradiated cladding (metal)Supply Of Industrial gas
Iarnród Eireann-Irish RailDublinDeadline: Aug 25Iarnród Éireann (Irish Rail) is seeking tenders for the supply and delivery of industrial gases for a period of five years.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 12. August 2026.
- Who is the contracting authority?
- The contracting authority is European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.