New: market reports on German public procurement Read the report

European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsTED

Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra

The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 bar...

Submission deadline: July 25, 2026 (expired)Type: Tender

Generators, Valves & Fittings, Process Technology, Cooling Systems, Water Treatment

Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs
Published:
June 14, 2026
Deadline:
July 25, 2026
Topic:
Generators

Tender description

Show full description

The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEX-classified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: - An MV/LV transformer - A thermal management system (dry cooler) - A low-pressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 - A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3-year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for self-consumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's co-generators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

5 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

No direct alternatives are currently listed. Activate search to automatically receive new matching notices.

Unlock advanced search

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 25. Juli 2026.
Who is the contracting authority?
The contracting authority is European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Next step

Get full access to this tender

Access all documents for "Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra" from European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs and keep track of deadlines and submission guidelines.

Deadline tracked until July 25, 2026No credit card required