Ørsted Bioenergy & Thermal Power A/SFredericiaTED
Superheater outlet steam headers at Avedøre Power Plant in Denmark.
The contract covers manufacture, testing and delivery of replacement outlet steam headers, transition pieces and part of connection tubes or the superheater HT3 outlet located at Avedøre Power Plant. The replacement is required following a steam leak incident and subsequent inspections where cracking indications were identified in dissimi...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Ørsted Bioenergy & Thermal Power A/S
- Published:
- June 16, 2026
- Deadline:
- Not specified
Tender description
Show full descriptionCollapse description
The contract covers manufacture, testing and delivery of replacement outlet steam headers, transition pieces and part of connection tubes or the superheater HT3 outlet located at Avedøre Power Plant. The replacement is required following a steam leak incident and subsequent inspections where cracking indications were identified in dissimilar metal transition welds at the superheater HT3 outlet. The replacement is intended to restore pressure integrity and reduce the risk of further high pressure steam releases. A steam header is a thick walled manifold/collector that gathers steam from multiple tubes and distributes it onward, operating at very high pressure and temperature. Specifically, the contract covers the following supplies and services: Supply: • Complete 28 outlet headers according to BWE’s drawings, including transition pieces and part of connection tubes • Manufacturing activities including design, materials, welding, NDT, pressure testing and delivery Services: • Detail engineering • Supply of materials • Production and welding • Project management • PTS for purchase of materials • PMA for ASME SA-335 gr. P92 • PMA for ASME SA213 TP347HFG (if needed) • Heat treatment • NDT inspection according to WTP and applicable boiler standards (as per DKF) • Pressure testing • NoBo inspection • Workshop visits during manufacturing • FAT supervision • Temporary corrosion protection • Transportation to site
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Preliminary Market Consultation for Steam Control Valves
LandsvirkjunReykjavíkDeadline: Aug 05Landsvirkjun would like to invite you to take part in our Preliminary Market Consultation for steam control valves that will be located in the T/G Unit valve room and form the HP separator pressure control and bypass arrangement, as indicated on P&ID drawing THT-P-LBK-T0-0515. Their primary function is to reduce the pressure of high-pressure steam that is not routed through the T/G Unit, from 27 bara to 9.3 bara, before the steam enters the existing medium-pressure system. The HP steam separator is designed for a maximum steam flow of 176 kg/s, which represents the maximum steam flow expected to be handled through the steam control valves. The T/G Unit is designed for flexible operation and variable load conditions, where the steam flow through the turbine may change depending on available steam, operating mode, start-up, shutdown, load changes and maintenance requirements. The steam control valves shall therefore be suitable for operation across a wide flow range and shall be capable of supporting stable pressure reduction from the HP steam system to the MP steam system during both partial bypass and full bypass operation. Special attention shall be given to the risk of H₂S-induced embrittlement and sulphide stress cracking, as well as the potential for SiO₂ scaling in high-temperature geothermal service. Vendors shall seek to minimize wear of valve components and noise emissions and shall avoid the use of plates or other components liable to clogging due to scaling.EU-procurement - Competitive procedure with negotiation – Tender for new thermal oil bundles for Renseanlæg Avedøre, Denmark Teknisk afdeling - EU-udbud
BIOFOS A/SKøbenhavn KDeadline: Aug 18The Thermal Oil Bundles at Renseanlæg Avedøre, is nearing its end-of-life status, and the Contracting Authority is therefore in need of a supplier to supply a new set of Thermal Oil Bundles, including decommissioning of the old bundles, delivery of the new bundles and installation of these. The current bundles have been in service for approximately 25 years, and are an integrated part of the economizer part of the sludge incineration plant at Avedøre Wastewater Treatment PlantThis procurement is for: Design and build contract regarding replacement of the thermal oil bundles in the economizer part of the sludge incineration plant at Avedøre Wastewater Treatment Plant, including decommissioning of the current bundles. (the "Contract").The tasks are described in more detail in “Appendix 5 – Technical Specification for Replacement of Thermal Oil Bundles”, including sub-appendix.One (1) contract will be entered into with one (1) Contractor.The Contracting Authority has decided not to divide the contract into lots. This decision is based on the complexity of the works, for which a single contractual arrangement is considered necessary to ensure effective project management and clear allocation of responsibility. Furthermore, the Contracting Authority considers that a single contract will represent a more attractive commercial opportunity and generate economies of scale, thereby increasing the likelihood of receiving a sufficient level of market interest and competition to ensure the best possible outcome for the procurement.Moreover, a single contract will reduce the number of interfaces between contractors and minimize the risks associated with coordination, integration and overall project delivery.SPD3/2025/096 - FRAMEWORK CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF NEW INVERTER-TYPE AIR-CONDITION UNITS AT SEVERAL OFFICES AND SCHOOLS WITHIN THE MINISTRY FOR GOZO AND PLANNING
Department of ContractsFlorianaThe subject of this tender is for the supply, delivery, installation, testing and commissioning of new inverter-type wall mounted split air-condition units at several offices and schools within the Ministry for Gozo and Planning.187/2026 Supply of Sulphuric Acid Min 96per cent (H2so4) for Reverse Osmosis Plant at Vasilikos Power Station
Electricity Authority of CyprusΛευκωσίαDeadline: Jun 19Supply of Sulphuric Acid Min 96per cent (H2so4) for Reverse Osmosis Plant at Vasilikos Power StationNachbeschaffung Hebeböcke
armasuisse Geschäftsbereich Ressourcen und Support, CC WTOBern BEDie Hebeböcke bestehen aus einem Dreibockheber und ein flugzeugspezifisches Interface. Damit können diverse Flugzeugtypen sicher, kontrolliert und punktgenau angehoben werden. Sie werden vor allem zur Wartung des Fahrwerks wie auch zur Überprüfung der Hydraulik eingesetzt.Hochtemperatur Wärmepumpe
Abwasserverband AltenrheinAltenrheinDeadline: Jul 18Die Ausschreibung umfasset eine Wärmeerzeugung mit Abwasser-Wärmepumpen. Schlammkondensations-Wärmepumpen, BHKW, Heizkessel und div. Abwärmenutzungen sowie zwei Energiespeichern sind bereits bestehend.Aktuell umfasst die Wärmeverteilung ein Niedertemperatur-Netz (NT +65 °C), ein Mitteltemperatur-Netz (MT +85 °C), sowie ein Hochtemperaturnetz (HT 140°C).Für die neue Schlammtrocknung wird ein 2-stufiges Wärmepumpen-System aufgebaut.Die erste Wärmepumpe bzw. Stufe wurde bereits realisiert. Diese Ausschreibung umfasst die zweite Wärmepumpe, welche als Quelle das Mitteltemperaturnetz benutzt und senkenseitig die Wärme ins Hochtemperaturnetz abgeben kann.Design and Manufacture of AP1000 Safety-Related Normal Residual Heat Removal Heat Exchangers for RNS System, ASME Section III, Class 3. (Commodity Code ME1C) for Poland AP1000® Project
Westinghouse Electric Poland Sp.z.o.oKrakówDeadline: Jun 12Westinghouse sucht Lieferanten für Design und Fertigung von AP1000-sicherheitsrelevanten normalen Restwärmeabfuhr-Wärmetauschern für das RNS-System (ASME Section III, Klasse 3) für das AP1000-Projekt in Polen. Voraussetzung: Erfahrung mit ähnlichen Leistungen, Nuklearqualitätsprogramm (NQA-1, 10CFR50 Anhang B), finanzielle Solvenz. Interessenten müssen einen Lieferantenqualifikationsfragebogen ausfüllen und ein Geheimhaltungsabkommen unterzeichnen.Workshop equipment for Buslanlegg Ski
Sporveien Bussanlegg ASOsloSporveien Bussanlegg AS hereby invites tenderers to apply to be qualified for a competition with negotiations on workshop equipment for ski bus facilities.(VPP-441) Mobilus dujų kompresorius
AB "Amber Grid"VilniusDeadline: Jun 01Perkamas mobilus dujų kompresorius dujų perpumpavimui (pilnai sukomplektuotas Įrenginys su dujiniu varikliu, kompresoriumi ir visa vamzdynų sistema, sumontuota ant puspriekabės), lanksčiomis žarnomis, įskaitant įrangos paleidimą, derinimą, Pirkėjo personalo mokymus bei visos reikiamos dokumentacijos pateikimą.CNC-Schleifzentrum, inkl. Lieferung, Aufbau, Inbetriebnahme und Wartung
Hochschule Magdeburg-StendalMagdeburg1 Stück CNC-Schleifzentrum, inkl. Lieferung, Aufbau, Inbetriebnahme und Wartung
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Ørsted Bioenergy & Thermal Power A/S.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.