New: market reports on German public procurement Read the report

LandsvirkjunReykjavíkTED

Preliminary Market Consultation for Steam Control Valves

Landsvirkjun would like to invite you to take part in our Preliminary Market Consultation for steam control valves that will be located in the T/G Unit valve room and form the HP separator pressure control and bypass arrangement, as indicated on P&ID drawing THT-P-LBK-T0-0515. Their primary function is to reduce the pressure of high-press...

Submission deadline: August 05, 2026 (expired)Type: Tender

Turbines, Valves & Fittings, Process Technology

Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
Landsvirkjun
Published:
July 05, 2026
Deadline:
August 05, 2026
Topic:
Turbines

Tender description

Show full description

Landsvirkjun would like to invite you to take part in our Preliminary Market Consultation for steam control valves that will be located in the T/G Unit valve room and form the HP separator pressure control and bypass arrangement, as indicated on P&ID drawing THT-P-LBK-T0-0515. Their primary function is to reduce the pressure of high-pressure steam that is not routed through the T/G Unit, from 27 bara to 9.3 bara, before the steam enters the existing medium-pressure system. The HP steam separator is designed for a maximum steam flow of 176 kg/s, which represents the maximum steam flow expected to be handled through the steam control valves. The T/G Unit is designed for flexible operation and variable load conditions, where the steam flow through the turbine may change depending on available steam, operating mode, start-up, shutdown, load changes and maintenance requirements. The steam control valves shall therefore be suitable for operation across a wide flow range and shall be capable of supporting stable pressure reduction from the HP steam system to the MP steam system during both partial bypass and full bypass operation. Special attention shall be given to the risk of H₂S-induced embrittlement and sulphide stress cracking, as well as the potential for SiO₂ scaling in high-temperature geothermal service. Vendors shall seek to minimize wear of valve components and noise emissions and shall avoid the use of plates or other components liable to clogging due to scaling.

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

5 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

9

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 05. August 2026.
Who is the contracting authority?
The contracting authority is Landsvirkjun.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Next step

Get full access to this tender

Access all documents for "Preliminary Market Consultation for Steam Control Valves" from Landsvirkjun and keep track of deadlines and submission guidelines.

Deadline tracked until August 05, 2026No credit card required